Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Electrical and Electronics
Water Storage And Supply
Opening Date6 Nov 2024
Closing Date14 Nov 2024
Tender Amount₹ 2,70,10,219 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Annual Maintenance Phase I and II Clear water Pumping Station;The tenderers should have experience in filtration of Transformer oil atleast 3675 ltrs.

14700

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Transportation of star rated -15.00 HP 24-40 Stage Three phase (S 6 sul ersible motor pumpset suitable for 6" Bore well. akes: Texmo/CRI/KSB/ Aryan Varsha/Lubi/Falcon.

1

79877

79877

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Transportation of star rated -7.50 HP 20-25 Stage Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo/CRI/Kse/ Aryan Varsha/Lubi / Falcon

2

49204

98408

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of Taparia tool kit like ring and flat spaners, pipe renchs, bearing puller and etc for regular maintenance of the phase-III 114 pump house including cost and conveyance of required materials and all other incidental and operational charges etc., complete as directed by the the Departmental officers.

2

12000

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of MS gland cup sleeves on both sides of the pump including cost and conveyance of required materials and all other incidental and operational charges etc., complete as directed by the the Departmental officers.

20

1200

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Fixing of 12.5 HP Star Delta Starter 415V, Three phase, 50Hz. With SS enclouser comprising of contactor with bi-metalic relay 112 with necessary push buttons, etc., complete as suitable to the motor (as per Sample) etc., complete as directed by the Departmental officers.

3

7854

23562

... More
Annual Maintenance Phase I and II Clear water Pumping Station;supply, delivery and fixing of compressor-1 Spares and sevicing of chicago model 2H*x2-25/14,SR no-3722001, Air compressor at phase-III Pump house,

1

412420

412420

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Fixing of 50 HP Star Delta Starter 415V, Three phase, 50Hz with SS enclouser comprising of contactor with bi-metalic relay with necessary push buttons, etc., complete as suitable to the motor (as per Sample) etc., complete as directed by the Departmental officers.

1

38000

38000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Fixing of 40 HP Star Delta Starter 415V, Three phase, 50Hz. With SS enclouser comprising of contactor with bi-metalic relay with necessary push buttons, etc., complete as suitable to the motor (as per Sample) etc., complete as directed by the Departmental officers.

1

32000

32000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, Delivery and fixing of 40 hp motor couplings for the MRF pump house including cost of required materials, labour charges and all other incidental and operational charges etc., complete as directed by the the Departmental officers.

4

18000

72000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and Reconditioning of vacuum pump and motor couplings for the MRF pump house including cost of required materials and all other incidental and operational charges etc., complete as directed by the the Departmental officers.

10

4800

48000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, Delivery of Replacement of damaged coupling bolts of Adopter for motor and Pumps of Phase-III Pump house, as directed by the Departmental officers.

4

75000

300000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, Delivery of Replacement of damaged rubber bushes of Adopter for motor and Pumps of Phase-III Pump house, as directed by the Departmental officers.

4

12000

48000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and fixing of. 12V, 150 AH AMF battery including wire leads. Makes: Amar Raja (Power Zone) or Equivalent model of Exide/ Panasonic/Gotech.

2

14548

29096

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and fixing of 12V 100 AH SMF battery including wire leads Makes: Quanta/Racket/Exide / Amaron.

2

11132

22264

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and Replacement of Spare parts for 50 HP submersible motor duly removing the damaged winding, wiring, starters and contactors of submersible motor and refixing with new of winding, wiring, starters, contactors and other spares for 50 HP submersible motor for Phase- Pump house including cost and conveyance of materials, labour charges and all other incidental and operational charges etc. Complete as directed by the Departmental officers.

2

45000

90000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and Replacement of Spare parts for 50 HP air compressor motor duly removing the damaged wiring, starters and contactors of Air compressor and refixing with new of wiring, starters, contactors and other spares for 50 HP air compressor for Phase-III Pump house including cost and conveyance of materials, labour charges and all other incidental and operational charges etc., Complete as directed by the Departmental officers.

4

55000

220000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of FN63 switch and fuses for Motors and pumping station as per requiremnt in station as directed by the Departmental officers.

24

8000

192000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of servogem 2 & Servogem 3 for Motors and pumping station as per requiremnt in station as directed by the Departmental officers.

480

200

96000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 12mm and 19mm Glande rope for arresting the leakages at pumps and sluice valves including cost of the materials transportation including labour charges etc., as directed by the Departmental officers.

100

450

45000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Epoxy painting to the pumps, Motors, valves and man folds pipe line, railngs and shutters etc., in the pump houses after duly cleaning the rusted parts with suitable compressor, guns etc,. complete, as per requirement whenever get required shut down (if required) during MOM period as directed by the Departmental officials

600

380

228000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Alluminium 7 Meters Ladder for section side sluice valve for operation and maintenace including cost and conveyance charges etc., as directed by the Departmental officials

1

15000

15000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of HRC fuses 6 AMPS for individual pump for improve the overall powerfactor including cost and conveyance charges and all other incidental and operational charges etc., complete as directed by the Departmental officials.

120

250

30000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of HRC fuses 63 AMPS for individual pump for improve the overall powerfactor including cost and conveyance charges and all other incidental and operational charges etc.. complete as directed by the Departmental officials.

24

7500

180000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, Delivery and fixing of HRC fuses 100 AMPS for individual pump for improve the overall powerfactor including cost and conveyance charges and all other incidental and operational charges etc., complete as directed by the Departmental officials.

24

15000

360000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Petrolium jelly to apply in Regular maintannce 92 of pump & motors to each contact to avoid corresion and rust in station.

24

200

4800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 6324 SKF Bearings for motors of driving end and non driving end including cost and conveyance charges and all other incidental and operational charges etc., complete as directed by the Departmental officials.

4

60000

240000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery and fixing of NU326 SKF Bearings for motors of driving end and non driving end including cost and conveyance charges and all other incidental and operational charges etc. complete as directed by the Departmental officials.

4

45000

180000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 6313 SKF Bearings for pumps of driving end and non-driving end including cost and conveyance charges and all other Incidental and operational charges etc., complete as directed by the Departmental officials.

4

22000

88000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery & fixing of General Bearings for pumps of driving end and non- driving end including cost and conveyance charges and all other incidental and operational charges etc., complete as directed by the Departmental officials.

4

85000

340000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of Cleaning materials Like Cotton Waste For Regular maintance in station as pr requirements.

1440

50

72000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of carbon tettra Cloride for claening contractors & Flashed panels etc,. In station

240

200

48000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Printing andSupply of maintnance register pump House Using 20 kg ledger Pages with full calicooo/hard binding with 100 pages/ book of Size 600x450mm as Directed by the Departmental officers

20

3000

60000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;SCHEDULE-II

1

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;At Peddapur Pumping Station Control panels, HT Panels, Cable ducts, control room and entire pump house once in a 4 months.

6

9000

54000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Pest Control services to avoid Lizards, Rats, Mice and Snakes etc., enter in to LT Electrical panels which are causing to major break downs and heavy damages Electrical Equipment, Pumping station and surroundings once in a 2 months by Spraying Specially formulated Pesticide near all HT, LT Electrical panels, cable trenches, cable ducts, entire control rooms and surroundings to kill the all Lizards and other insects to avoid heavy flashovers causing major break downs and heavy damages which are causing major pumping interruptions frequently including cost of material and all taxes and duties complete as directed by the departmental officers once in a 2 months.

12

3500

42000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of Re conditioning of fire extinguitiors and other safety equipment pump house time to time transporting and re filling required gas including men, material and transportation etc., complete annual maintenance.

96

150

14400

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Annual maintenance for Servicing, reconditioning and trouble shooting of EOT crane wiring, panels complete annual maintenance as directed by departmental officers.

24

3500

84000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance, Overhauling and Servicing of Horzintal Pump 1340 HP and Motor 1000 KW, Make, Mather Platt model Pump with a discharge of 1748m3/hr should be kept in running condition through out the year by providing gaskets, nutbolts and all other required material etc., complete Regular maintenance as directed by the departmental officers, major parts like shafts, bearings, mechanical seals etc., will be provided by the department if requires.

144

7500

1080000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT Sensitive Earth fault realy protection relays of Engilish Electrical make electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

144

625

90000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT Over current Earth falt realy protection relays of Engilish Electrical make electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

192

625

120000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT motor protection relays of Esennar make electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

192

625

120000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing and trouble shooting of 6.6KV panel under Voltage relays110V DC Aux. voltage including the cost of trouble shooting whenever fault occurred material and transportation complete Regular maintenance as directed by the Departmental officers.

48

625

30000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of Re conditioning of all valves including Sluice vales, Gate valves, NRV valves like greasing and cleaning etc., complete maintenance as directed by Departmental officers.

24

500

12000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Re conditioning of Earth pits time to time to obtain Earth pit values as per IE rules at Sub station and pump house by providing required charcol, salt, men and material complete Regular maintenance.

360

50

18000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Internal lighting: providing lamps chokes, starters etc., in place of burnt out lighting mateirals to maintain the illumination in pumping plant, complete Regular maintenance.

24

2800

67200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for DG Set: Providing filters and repalcing the new lubricants and overhauling the 200 KVA DG set complete Regular maintenance to maintain the pumping station as Directed by the Departmental officers. (Once in 3 months)

8

6000

48000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Compressors: Providing filters and replacing the new lubricants and overauling the air compressors complete Regular maintenance to maintain the pumping station as Directed by the Departmental officers.

48

6000

288000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing, reconditioning, testing and commissioning of 6.6KV Siemens Power Switch Gear Limited make 1250Amps including countrol wiring like incomers, motor feeders bus coupliers, VT Panels etc., complete Regular maintenance & Trouble shooting should be attended immediately at 6.6KV Pump House whenever fault occurred spares will be supplied by HMWSSB if required.complete as directed by the Departmental officers.

240

800

192000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, reconditioning, replacement of damaged parts if any, reconditioning, testing and trail run of 110V. 100AH dual battery chargers and battery bank (2V x 55 No's) complete Regular maintenance, at pump house as directed by the Departmental officers spares will be supplied by HMWSSB if required.

24

800

19200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Peddapur Pump House

1

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Exterior walls are painted with one coast of primer and 2 coats of exterior emulsion paint.

2000

119

238000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and rectication of 6.6kv FCMA type soft starter duly replacing the spares for FCMA (Flux compensated Magnetic Amplifier) type soft starter such as circuit breaker, contactor, thermal over load relays, Tyrister firing circuit, bypass contactors, rectifiers, transformers jo and micrometer etc including re-wiring etc complete along with service charges for operating the 810kw HT squrrel cage induction motors.

2

155000

310000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and rectication of 6.6kv FCMA type soft starter duly replacing 66 the H.T Modules Three phases RYB of 6.6 kv ratings to suit the existing FCMA (Flux compensated Magnetic Amplifier) type soft starter for jo operating the 810kw HT squrrel cage induction motors.

2

175000

350000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Providing bearings to the 503kw InductionType C.G make 3.3KV HT Motor including supply of DE & NDE side bearings, decoupling the pump from motor, opening the Motor duly unscrewing the fasteners, removing rotating unit, remoing the worn out bearings, replacing with new recommended type bearings, providing new packing, seals, re- ja assembling the Motor, coupling with Pump, making alignment, checking, testing, trial and commissioning etc complete incl cost of bearings as per standards and as directed by the Departmental officers.

1

200000

200000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Providing bearings to the 503kw HSC Type M&P make Pump including supply of DE & NDE side bearings, decoupling the pump from motor, opening the pump duly unscrewing the fasteners, removing rotating unit, remoing the worn out bearings, replacing with new recommended type bearings, providing new packing, seals, gland Jo ropes re-assembling the pump, coupling with motors, making alignment, checking, testing,trial and commissioning etc completecomplete incl cost of bearings as per standards and as directed by the Departmental officers.

2

180000

360000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;supply and delivery of HRC fuses of 3.3kv 200 Amps to suit the existing system of Megawin breakers of 3.3 kv control panel at Phase-I Pump No House including cost and conveyance.

12

8000

96000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Synthetic enamel painting to the pumps, motors, valves, manifolds, pipe line, railing etc duly cleaning the corrosion etc complete as So directed by the departmental officials.

400

300

120000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 400 mm dia Non Return Valve duly replacing spres such as shutter, shafts, pinion shaft locks, seals etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers

2

40000

80000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 400 mm dia butter fly valves duly replacing the gears, pinion, gears, bushes, seals, packings, other spares etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers

2

45000

90000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 400 mm dia Sluice valves duly replacing the spindle rods, check nuts, bushes, seals, packings, etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers

2

45000

90000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Trouble shooting and rectification team for testing/ trouble shooting and electrical maintenance of pumping station and to monitor the system to avoid major interruptions and to act as emergency team during breakdowns, or taken up major works etc along with Men, machinery, all tools and test equipment etc., as directed by the departmental officers.

4

5000

20000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance Servicing, repairing, reconditioning, testing and trouble shooting of EOT crane, as directed by the departmental officers and major spares like Gear boxes, etc., will be supplied by the department if required.

1

2500

2500

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Pest Control services to avoid entry of reptiles, Lizards, Rats, Mice etc into Electrical control panels to avoid major break downs and heavy flashes and damages to Electrical Equipment, once in a month by Spraying Specially formulated Pesticide near all HT, LT Electrical panels, cable trenches, cable ducts, entire control rooms and surroundings to avoid major pumping interruptions frequently including cost of material and all taxes and duties complete as directed by the departmental officers.

24

3500

84000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: Servicing of 503 KW/3.3kv Induction motors Crompton Greaves make checking Electrical connections, rectification if necessary, applying the recomended grade lubricants, at NDE DE bearings, replacing the coupling bolts, bushes if necessary, as per old sample at pump house.

8

4500

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: Servicing of 503 KW HSC type Mather+Platt make Pumps duly applying the recomended grade lubricants at NDE DE bearings, replacing glands, checking gaskets, fasteners.except major repairs etc complete maintenance as directed by the departmental officers, Major parts like shafts, Bearings, Mechanical seals etc., will be provided by the department if required.

8

4500

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Internal lighting: Providing Luminaries etc., in place of burnt out lighting mateirals to maintain the illumination in pumping plant complete regular maintenance

40

2500

100000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Maintenance of out going motor feeding panels 3.3KV 400 Amps, Megawin make: Vaccum Contactor includes control wiring etc. complete as directed by the department officials once in year if any spares recomended amount will be added as per the HMWSSB officials approval

8

16000

128000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Maintenance of Incomer panels of 3.3KV 800 Amps, Killburn Vacuum Circuit breakers includes control wiring, breaker servicing etc. complete as directed by the department officials.

3

18000

54000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of 10 HP vacuum pump sets which includes overhauling and servicing duly replacement of bearings, shaft sleeves, check nuts, gaskets, metal filling, machining, grease, gland ropes and other minor parts if any, labour charges etc as directed by departmetal officials.

2

25000

50000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: repair and reconditioning of 10 HP motor of vacuum pump sets which includes overhauling and servicing duly rewinding, replacement of bearings, shaft sleeves, cabling, starter etc je and other minor parts if any, labour charges etc as directed by departmetal officials.

2

25000

50000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: Re-conditioning of fire extinguitiors and other safety equipment at Phase-ll pump house duly transporting and re filling required gas CO2 including cost of material and transportation etc, complete Regular maintenance.

6

150

900

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance and Servicing, reconditioning, replacement of damaged parts if any, reconditioning, testing and trial run of dual battery chargers and battery bank 48 V/10-10(20A), capacity 55AH complete Regular maintenance, at pump house as directed by the Departmental officers.

24

650

15600

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of 15 HP Compressors Servicing of 15HP/11.00kw ELGI make piston type air compresswors duly Providing necessary spare such as Air Filters, Oil Filters, recomended grade Lubricants, draining out the burnt oil,re-filling with the new lubricants etc including service charges of Engineers etc including testing, trial and commissioning etc all complete as per standards at Phase-Il Pumping station Kalabgoor as Directed by the Departmental officers

4

4000

16000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of Master Trip falt realy protection relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

12

800

9600

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT Sensitive Earth fault realy protection relays of electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

12

800

9600

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT Over current Earth falt realy protection relays of Alstomi make electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

12

800

9600

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT motor protection relays of Crompton Greaves make electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

12

800

9600

... More
Annual Maintenance Phase I and II Clear water Pumping Station;MAINTENANCE OF PHASE-I PUMP HOUSE AT RAJAMPET.

1

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery, installation, testing, trial and commissioning of uninterrupted power supply system consisting of tall tubular battery, 180 AH with inverter and making necessary connections and changes in the domestic indoor wiring etc complete as dirfected by the departmental officers.

1

45000

45000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Filteration of transformer oil as per ISS specifications filters to electric strength above 40 KV- ELEC-Sl.No.7.15.14 1515 a At site @ 12.00/ltr.

8000

12

96000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of suitable Transformer oil for the transformers located at Kalabgoor 33/6.6kv Elec sub station incxluding cost and conveynce etc complete.

400

141

56400

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery heat shrinkable indoor termination kit for 3.3 KV HT XLPE insulated armoured cable 185 Sqmm with necessary materials etc., complete. including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

2

13430

26860

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Suuply and delivery of 11 KV HT 185 X 3 Core HT cables as per old sample including the cost of material and transportation etc.. complete as directed by the departmental officers.

30

2250

67500

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of TNC Switch", make of RECOM, and to suit the existing system, including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

4

6000

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 3.3 kv 400 Amps Single Brake AB Switches to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

2

18500

37000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 33 KV 800 Amp Electrical ISolators and to suit the existing system, including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

2

15000

30000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of Discharge Reactor/RVT suitable for out door structure mounting manufactured existing discharge reactor of 6.6 KV Power factor improving HT capacitor bank at 33/6.6 KV sub-stations as per old sample at Patancheru including the cost of material and transportation as directed by Departmental Officials.

1

210000

210000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 6.6 KV POTENTIAL TRANSFORMER to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per old sample and as directed by the departmental officers.

1

145000

145000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 33 KV POTENTIAL TRANSFORMER to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per old sample and as directed by the departmental officers.

1

165000

165000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 33KV line Current Transformer CT Ratio 400- 200-1005-5 2 Core, Clas: 0.5 related frequency of 50HZ Standard of IEC 6044-1/IS:2706 make of ABB and to suit the existing systems including cost of materials, labour charges for loading and unloading, transportation to work site as per old sample as directed by the departmental officers

1

165000

165000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 3.3 KV line Current Transformer to suit the existing systems including cost of materials, labour charges for loading and unloading, transportation to work site as per old sample as directed by the departmental officers

1

123000

123000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 3.3 KV Disc Insulators and Metal parts for supporting to suit the existing systems including cost of materials, labour charges for loading and unloading, transportation to work site as per old sample as directed by the departmental officers.

10

1500

15000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 33 KV Disc Insulators and Metal parts for supporting to suit the existing systems including cost of materials, labour charges for loading and unloading, transportation to work site as per old sample as directed by the departmental officers

8

2500

20000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 100 amps with stand up to 15KV expulsion wire type HT fuse links for outdoor capacitor bank units at Kalabgoor substation as directed by the department officials.

4

1500

6000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;supply and delivery of power factor Improving capacitor bank of 145KVAR, Rated 6.351kv, Phase-1, 50Hz, Rated current Amp 22.83 as Per 15 13925 PART-1 including cost and conveyance, transportation etc complete as directed by the Departmental officers.

3

60000

180000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of surge arrester of SKA, 10KA class-1, 50hz, type STN DT, mcov 7.2kvpr.rel current 40ka, 40KA including cost and conveyance of material to site, etc all as per the tandard specifications.

3

12000

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of surge arrester of the following specifications 30KV, 10KA, CLASS-2, 50HZ, TYPE STN-DT, MCOV-24KV, PR.REL CURRENT 40KA including cost and conveyance of material to site, etc all as per the tandard specifications.

3

20000

60000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of pad clamps for 33 KV and 3.3KV Structure to suit the existing systems including cost of materials, labour charges for loading and unloading, transportation to work site as per old sample as directed by the departmental officers

40

650

26000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 3.3 KV side ceramic bushings to suit the existing for 2.5 MVA power transformer, as per old sample including cost of material, transportation etc.,complete as directed by the Departmental officers.

4

4500

18000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery and fixing of 33 KV side ceramic bushings to suit the existing for 2.50 MVA power transformer, as per old sample including cost of material, transportation etc..complete as directed by the Departmental officers.

4

6500

26000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery and fixing of Buchholz relay to suit the existing for 33/3.3 KV, 2.50 MVA power Transformer at Substation as per old sample including cost of material, transportation etc.,complete as directed by the Departmental officers.

1

33000

33000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Servicing duly replacing burnt Vaccuum contacts of 1200 A/3.3kv rating for 3.3KV Vaccum circuit breaker including Trouble shooting 18 and rectification should be attended immediately whenever fault occurse including cost of spares what ever required etc all complete as directed by Departmental officers.

6

5500

33000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Servicing duly replacing burnt Vaccuum contacts of 1000 A/33kv rating for 33KV Vaccum Vaccum circuit breaker including Trouble shooting and rectification should be attended immediately whenever fault occurse including cost of spares what ever required etc all complete as directed by Departmental officers.

6

6000

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Spreading of 40 mm Metal including cost and conveyance of material labour charges for sprearding and levelling in Kalabgoor Substation Yard as directed by the departmental officers (40.00mx15.00mx0.15m= cum)

90

2050

184500

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Petrolium jelly to apply in regular maintenance to each contacts to avoid corrossion and rust etc., complete as directed by the departmental officers

24

200

4800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;House keeping of Substation by supplying of house keeping material like, coco brooms, Detergents, floor duster, phenyl, cotton waste, Me cheese cloth etc., as per requirement.

24

4000

96000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Carbon Tetra Cloride for cleaning Contactors & flashed panels etc.

24

200

4800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Printing and supply of Daily log book for Sub station / Pump houses with ledger pages with full calicoo/hard binding with 100 pages/book of size 600 x 450 mm as directed by the departmental officers.

12

3000

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Pest Control services to avoid entry of Reptiles, Lizards, Rats, Mice etc in to Electrical control panels to avoid major break downs and heavy flashes and damages Electrical Equipment, once in a month by Spraying Specially formulated Pesticide near all HT, LT Electrical rical Jo panels, cable trenches, cable ducts, entire control rooms and surroundings to avoid pumping interruptions frequently including cost of pesticides, services etc all complete as directed by the departmental officers (once in a two months)

12

3500

42000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance fire extinguitiors duly refilling of CO2 and replacement of damaged/defunct spares etc at Sub station including cost of materials, services and transportation etc., complet maintenance. Once in year

6

150

900

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Re conditioning of Earth pits time to time to obtain Er values as per IE rules at Sub station by providing required charcol, salt, men and material complete annual maintenance

120

50

6000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for C & R Panels of 33/3.3 KV breakers complete annual maintenance including servicing and repairing including spares as directed by Departmental officers.

12

3500

42000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular repairing and trouble shooting of 33KV and 3.3KV panel under Voltage relay make 110V AC operating voltage, 110V DC Aux. voltage including the cost of trouble shooting whenever fault occurred J material and transportation complete annual maintenance substation as directed by Departmental officers.

12

1500

18000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing, reconditioning, testing and commissioning of 3.3 KV Vaccum Circuit breakers, including control wiring like incomers, motor feeders capacitors etc., complete annual maintenance & Trouble shooting should be attended immediately whenever fault occurred, as directed by Departmental officers.

12

850

10200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing, reconditioning of 33KV 630 Amps Vacuum Circuit breakers, including control wiring like incomers, motor feeders, capacitors etc., complete annual Jo maintenance & Trouble shooting should be attended immediately whenever fault occurred as directed by Departmental officers.

12

850

10200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, reconditioning, replacement of damaged parts if any, reconditioning, testing and trail run of 110V DC dual battery chargers and battery bank complete maintenance, at Sub station as directed by Departmental officers.

12

650

7800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, reconditioning and trouble shooting of CTR make OLTC & RTCC cgl panel wiring make AVR panels Job complete annual maintenance as directed by Departmental officers.

12

735

8820

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of Internal lighting duly providing LED lamps, in place of burnt out lighting in the premises to maintain the illumination Job in substation and access roads complete under annual maintenance

12

2500

30000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular Maintenance of BUCHHOLZ relay of 33/3.3, 2.00 MVA Power transformer make Crompton Greaves Limited electric, complete annual maintenance including servicing and repairing as directed by Departmental officers.

12

470

5640

... More
Annual Maintenance Phase I and II Clear water Pumping Station;MAINTENANCE OF 33/11/3.3KV ELECTRICAL SUBSTATION AT RAJAMPET

1

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repairing and re-winding of dynamo of 200 KVA Diesel generator at Phase-III Pump house at Peddapur duly by removing the damaged winding of dynamo and re-winding the dynamo and replacing in its position, repairing and overhauling the 200 KVA Diesel generator by draining coolant and lubricants from the engine and remove Accessories of engine and Servicing cylinder head assembly, Oil Sump and Oil Pump, Piston and connecting Rod Assembly, Flywheel, Crank shaft, camshaft and its Bearings and gear, cylinder block, Check and adjust valve clearances as per procedure and re-fixing all the accessories and refilling all the required coolant and lubricants as per standard specification including cost and conveyance of all materials, mechanic and helper charges etc., complete as directed by the departmental officers.

3

40000

120000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of Grass Cutting Machine for the Electrical Substation 128 Premises including cost of the materials, transportation labour charges etc., as directed by the departmental officers

1

25000

25000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Manufacture, Supply and delivery of 50 mm PN16 DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG-40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge

24

7728

185472

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Manufacture, Supply and delivery of 150mm PN16 DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice vaives) with body bonnet of ductile cast iron of grade GGG-40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge

3

20556

61668

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Manufacture, supply and Delivery of 450 mm PN 2.5 Dia cast carbon steel D/F Butter fly valve conforming to IS: 13095/1991 manually heavy duty gear operation, excluding transportation and GST etc complete as directed by the departmental officers

3

208010

624030

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Manufacture, supply and Delivery of 600 mm PN 2.5 Dia cast carbon steel D/F Butterfly valve conforming to IS: 13095/1991 manually heavy duty gear operation, excluding transportation and GST etc complete as directed by the departmental officers.

3

280412

841236

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of Taparia Tool Kit Like Ring and Flat Sppaners, ploe Wrench Bearing Puller etc for the regulat Maintenance of the phase I & II including cost of the materials, transportation labour charges etc., as directed by the departmental officers.

2

12000

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of replacement of damaged Coupling Bolts and Nuts with ubber bushes of Adpoter for Motor and Pumps of Phase I & II including cost of the materials, transportation labour charges etc., as direred by the departmental officers

24

1200

28800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 12mm and 19mm Glande rope for arresting the leakages at pumps and sluice valves including cost of the materials, transportation including labour charges etc., as directed by the departmental officers

30

450

13500

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply Delivery of Bearings for suitable of Phase I Bearing Number 22318 E1AM and phase II bearing ni 6319 including the cost of Transportation labour charges, etc complete as directed by the Departmental Officers

12

22000

264000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Arresting heavy water leakage of existing industrial water supply pipelines and campus water supply pipelines duly by doing earth work excavation at cracked and damaged portion of Pipeline and removing the damaged portion of the pipeline and replacing with new pipe duly dewatering the water with pump set and cleaning the cracked portion with wire brush and fixing the 2 No's of Cl collar joints and packing with rubber packing sheets, nuts, bolts, washers and etc., refilling the trench with excavated soil after completion of work including cost of all consumables and materials, all labour charges for skilled and unskilled and all other incidental and operational charges etc., Complete as directed by the departmental officers.

24

25000

600000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and transportation of 10W, 1000 lumens, 600mm length LED batten tube light, housing made with PC body, wide operating voltage with Single/double side connection, PF20.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K-6500K as desired by the department and as per IS specifications, minimum 118 CRI280,.etc complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Phillips/ OSRAM/ GE Venture/ Wipro/ Crompton/ Bajaj / Havells/ Jaquar/ LED/ Panasonic / Halonix/ HPL/ Syska/ Eveready/ Surya Keselec/ Arraystorm/ GM/ Goldmedal LED MAKE: PHILIPS LUMILEDS /CREE/ NICHIA/ OSRAM/ SAMSUNG/ LG LEDS.

120

404

48480

... More
Annual Maintenance Phase I and II Clear water Pumping Station;120 W +/-10% (>=12000 Lumens) flood lights

36

8882

319752

... More
Annual Maintenance Phase I and II Clear water Pumping Station;60/65 W +/-10% (>=6500 Lumens)

36

4603

165708

... More
Annual Maintenance Phase I and II Clear water Pumping Station;30 W +/-10% (>-3000 Lumens)

36

2140

77040

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and transportation of LED Street light Body made of high grade pressure diecast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Suitable lens on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range. P.F 0.90, System having efficacy >110 lumens/ watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD 15%, CCT: 3000- 6500K as desired by the department and as per 15, CRI-70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates

1

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Engaged Man mazdoor for Cutting and Cleaning of thick and thorny plant of light jungle surrounding the area of Patancheru campus duly cutting and stacking with an initial lead and lift and disposal duly by stacking, burning including labour charges and the tools and tackles along with all other incidental and operational charges etc., complete as directed by the departmental officers.

480

763

366240

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Petrolium jelly to apply in regular maintenance to each contacts to avoid corrossion as directed by the departmental officers.

24

200

4800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of Cleaning materials Like Cotton Waste For Regular maintenance as per requirements etc,as directed by the departmnetal officials.

500

50

25000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;House keeping by supplying of house keeping material like, coco brooms, Detergents, phynol, coton wast, cheese cloth and Plant area Bath rooms, WC and Urinals Cleaning and Washing etc as per M requirement as directed by the departmental officers.

24

3000

72000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Carbon Tetra Cloride for cleaning Contactors & flashed panels etc., as directed by the departmental officers.

120

200

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of SKF LGMT 3IN/18 Grase Servogern 2 & Servogem 3 for motors and pumps for pumping stations as per requirement as directed by the departmental officers.

160

200

32000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Printing and supply of Daily log book for substations with ledger pages with full calicooo/hard binding with 100 pages/book of size 600 x 450 mm as per old sample for Phase I & II, Substation, Telephone as directed by the departmental officers.

24

3000

72000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 250 Amps HRC fuses for the smoother operation of Pumping systems as directed by the departmental officers.

6

8000

48000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 300 Amps HRC fuses for the smoother operation of Pumping systems as directed by the departmental officers

6

8575

51450

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 350 Amps HRC fuses for the smoother operation of Pumping systems as directed by the departmental officers

6

9000

54000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 500 mm dia butter fly valves duly replacing the gears, pinion, gears, bushes, seals, packings, other spares etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers spares will be supplied by HMWSSB if required.

4

65000

260000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 600 mm dia Gate valves duly replacing the spindle rods, check nuts, bushes, seals, packings, etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers spares will be supplied by HMWSSB if required.

4

75000

300000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply of spare parts, repairing, reconditioning, testing and trail run to 10 HP vaccume pump sets which includes supply and fixing of bearings. shaft sleeves, check nuts, gaskets, gland plates, metal filling, machining. greese, gland ropes and other minor parts if any, labour charges, includes dismantling, serviing, re asseblings, trail run and to & from transportation charges from site to work shop and work shop to site as directed by departmetal officials.

4

16500

66000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Lizard control - consistes by sparying insecticide formulations throughly to control the lizards carried for fortynightly intervals through out the MOM period B) Rodent control to cotrol rats, mice and bandicoots includes burrow baiting will be carried out in and arround the pump house and also posion bait containing bormadilone 0.005% w/w whish is a single dose once in weekly intervals for Phase -I, Phase-II Berramguda Pump House and Substaion period (For Second year)

12

3500

42000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Annual Maintenance and Repair of Almonard Pedstal fans in Phase -I & II Pump house includes Replacement of bushes, rewinding condenser and coils etc complete as directed by the departmental officers. spares will be supplied by HMWSSB if required.

96

900

86400

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Annual maintenance for Compressors and Air Vessels: Providing filters and replacing the new lubricants to Air compressor and existing Air Vessels complete annual maintenance to maintain the Phase Il pumping station as Directed by the Departmental officers.

24

6000

144000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Annual maintenance for Vaccum Pump's Regular maintenance for Servicing of 7.5 kW/415V make Vaccum Pumps complete annual maintenance to maintain the pumping station as Directed by the Departmental officers spares will be supplied by HMWSSB if required.

24

1000

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and Reconditioning of Phase I & II pump House Building Chlorination plant building and Reservoir i.e,. Roof Slab arresting Leakages, Side walls arresting Leakages. Exhaust Fan repair and replacement, Flooring etc complete as directed by Departmental officers Yearly Once spares will be supplied by HMWSSB if required.

2

25000

50000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 100 Amps HRC fuses for the capacitor bank 98 connection regarding of Pumping systems as directed by the departmental officers.

6

1000

6000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 500 mm dia Gate Valve valves duly replacing the spindle rods, check nuts, bushes, seals, packings, etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officersspares will be supplied by HMWSSB if required.

2

60000

120000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 450 mm dia butter fly valves duly replacing the gears, pinion, gears, bushes, seals, packings, other spares etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers spares will be supplied by HMWSSB if required.

2

45000

90000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Epoxy painting to the Phase I & II all valves and man folds pipe line, railngs, Chequal Plates and shutters etc., in the pump house and reservoir after duly cleaning the rusted parts with suitable compressor, guns etc,, complete, as per requirement whenever get required shut down (if required) during MOM period as directed by the Departmental officials

400

300

120000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair, Reconditioning of 900 mm dia Sluice valves duly replacing the spindle rods, check nuts, bushes, seals, packings, etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers.

3

85000

255000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, reconditioning and trouble shooting of 5 Ton and 2 Ton make Voltas Wharton EOT and HOT cranes wiring, panels of Phase I & II complete annual maintenance as directed by departmental officers spares will be supplied by HMWSSB if required.

24

2500

60000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Mechanical services by Engaging expertised engineers along with required man power etc., for pumps and motors for observation of pumps and motors condition and if any repairing and alignment of pumps & motors as and when required Pump sets and allied equipment as directed by the Departmental officials.

24

10000

240000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT motor protection relays, HT Over Current Earth Fault relay and HT Sensitive Earth fault realy including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.spares will be supplied by HMWSSB if required.

576

625

360000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing, reconditioning, testing and trouble shooting 3.3 KV SOFT STARTER including the testing of the all the panel relays, replacement of Indications, fuses, connectors, lugs, testing of contol wiring complete maintenance as directed by the departmental officersif required. spares will be supplied by HMWSSB if required.

168

1050

176400

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing 400 Amps, 3.3 KV Vaccurne Circuit breakers including control wiring like incomers, motor feeders capacitors For Phase-I & II. Pump house-etc., complete maintenance whenever fault occurred complete as directed by the Departmental officers.

360

960

345600

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Filteration of transformer oil as per ISS specifications filtersto die electric strength above 40 KV At Site Including the oil machinery equipment, and accessories, transportation of equipment testing of oil, winding resistance, issuing of test certificates by maintaining 100°C to obtain IR values up to 100 M ohms for 132 KV/6.6KV 10/16 power transformers, complete as directed by the departmental officers.

11400

12

136800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Providing and errecting heat shrinkable indoor termination kit for KV HT XLPE Insulated armoured cable 185 Sqmm 3 core with necessary materials etc., complete as directed by dept officers Makes: Raychem / Transeal / M Seal

7

13430

94010

... More
Annual Maintenance Phase I and II Clear water Pumping Station;roviding and errecting heat shrinkable indoor termination kit for 33/3.3 KV HT XLPE insulated armoured cable 300 Sqmm 3 core with necessary materials etc., complete as directed by dept officers Makes: Raychem / Transeal / M Seal

7

14352

100464

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of " TNC Switch", make of RECOM, and to suit the existing system, including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

24

1550

37200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of with stand (Capacitor bank Fuse wire set) up to 15KV expulsion wire type Horn Gap fuse links for outdoor capacitor bank units at substation as directed by the department officials.

24

500

12000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Spply and Delivery of capacitor bank with Fuse units of rating 100 KVAR make Madhav,6.36 KV, Phase-1 rated current 15.75 amps rated frequency 50 HZ at 33/3.3 KV sub-stations as per old sample at Patancheru including the cost of material and transportation as directed by Departmental Officials.

6

29500

177000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of Re conditioning of fire extinguitiors and other safety equipment at Sub station, Phase I & Phase Ilto time transporting and re filling required gas including men, material and transportation etc., complete annual maintenanceonce in year.

720

150

108000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Spreading of 40 mm Metal including cost and conveyance of material labour charges for sprearding and levelling in Patancheru Substation Yard as directed by the departmental officers

100

2050

205000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Re conditioning-of-Earth-pits-time-to-time-to obtain Er values as per IE rules at Sub station Phase I & Phase II by providing required charcol, salt, men and material complete annual maintenance as directed by Departmental officers.

2280

50

114000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for C & R Panels of 33/3.3 KV 3.15 MVA power transformer complete annual maintenance including servicing and repairing and spares will be supplied by HMWSSB as directed by Departmental officers.

72

1000

72000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular Servicing, repairing and trouble shooting of all relays include Earth Fault relay, Over Current Relay, Under Voltage Relay Earth Sensitive fault Relays of Substation including the cost of trouble shooting whenever fault occurred material and transportation complete annual maintenance substation as directed by Departmental officers spares will be supplied by HMWSSB if required.

384

750

288000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing, reconditioning 1250 Amps 3.3 KV ABB Make PC & VCB, including control wiring like incomers, motor feeders, capacitors etc., complete annual maintenance & Trouble shooting should be attended immediately whenever fault occurred pares will be supplied by HMWSSB if required.complete as directed by Departmental officers.

72

750

54000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regulal maintenance for Servicing, repairing, reconditioning 1600 Amps 33 KV ABB Make out door PC & VCB including control wiring like incomers, motor feeders, capacitors etc., complete annual maintenance & Trouble shooting should be attended immediately whenever fault occurred spares will be supplied by HMWSSB if required.complete as directed by Departmental officers.

24

800

19200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regularmaintenance for Servicing, reconditioning, replacement of damaged parts if any, reconditioning, testing and trail run of 110V DC dual battery chargers and battery bank complete annual maintenance, at Sub station and phase II Pump house as directed by Departmental officers. spares will be supplied by HMWSSB.

48

800

38400

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, reconditioning and trouble shooting of CTR make OLTC & RTCC CGL panel wiring complete annual maintenance as directed by Departmental officers spares will be supplied by HMWSSB if required.

48

750

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Internal lighting providing lamps chokes, starters etc., in place of burnt out lighting mateirals to maintain the illumination in substation, Phase-I, Phase II and Campus complete annual maintenanceas directed by Departmental officers.

24

2500

60000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for buckaulze relay of 33/3.3 KV, 3.15 MVA power transformer complete annual maintenance including servicing and repairing as directed by Departmental officers spares will be supplied by HMWSSB if required.

48

500

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;PATANCHERU 33/3.3 KV SUBSTATION AND PHASE I & II PUMP HOUSES AND CAMPUS

1

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery, installation, testing, trial and commissioning of uninterrupted power supply system consisting of tall tubular battery, 180 AH with inverter and making necessary connections and changes in the domestic indoor wiring etc complete as dirfected by the departmental officers.

2

45000

90000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Filteration of transformer oil as per ISS specifications filters to die electric strength above 40 KV-----------ELEC- Sl.No.7.15.14 1515 a At site @ 12.00/ltr

10000

12

120000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of suitable Transformer oil for the trtansformers located at Kalabgoor 33/6.6kv Elec sub station incxluding cost and conveynce etc complete.

800

141

112800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery heat shrinkable indoor termination kit for 6.6 KV HT XLPE insulated armoured cable 185 Sqmm with necessary materials etc., complete. including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

2

13430

26860

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery heat shrinkable indoor termination kit for 6.6 KV HT XLPE insulated armoured cable 240 Sqmm with necessary materials etc., complete. including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

2

21381

42762

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Suuply and delivery of 11 KV HT 185 X 3 Core HT cables as per old sample including the cost of material and transportation etc., complete as directed by the departmental officers.

60

2250

135000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of "TNC Switch", make of RECOM, and to suit the existing system, including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

6

1550

9300

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 6.6 kv 400 Amps Single Brake AB Switches to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

4

18500

74000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 33 KV 800 Amp Electrical ISolators and to suit the existing system, including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample and as directed by the departmental officers.

2

8000

16000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of Discharge Reactor/RVT suitable for out door structure mounting manufactured existing discharge reactor of 6.6 KV Power factor improving HT capacitor bank at 33/6.6 KV sub-stations as per old sample at Patancheru including the cost of material and transportation as directed by Departmental Officials.

2

210000

420000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 6.6 KV POTENTIAL TRANSFORMER to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per old sample and as directed by the departmental officers.

1

145000

145000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 33 KV POTENTIAL TRANSFORMER to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per old sample and as directed by the departmental officers.

1

165000

165000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 33KV line Current Transformer CT Ratio 400-200-1005-5 2 Core , Clas : 0.5 related frequency of 50HZ Standard of IEC 6044-1/IS:2706 make of ABB and to suit the existing systems including cost of materials, labour charges for loading and unloading , transportation to work site as per old sample as directed by the departmental officers

1

165000

165000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 6.6 KV line Current Transformer to suit the existing systems including cost of materials, labour charges for loading and unloading , transportation to work site as per old sample as directed by the departmental officers

1

123000

123000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 6.6 KV Disc Insulators and Metal parts for supporting to suit the existing systems including cost of materials, labour charges for loading and unloading , transportation to work site as per old sample as directed by the departmental officers

24

1500

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 33 KV Disc Insulators and Metal parts for supporting to suit the existing systems including cost of materials, labour charges for loading and unloading , transportation to work site as per old sample as directed by the departmental officers

12

2500

30000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Delivery of 100 amps with stand up to 15KV expulsion wire type HT fuse links for outdoor capacitor bank units at Kalabgoor substation as directed by the department officials.

12

5000

60000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;supply and delivery of power factor improving capacitor bank of 145KVAR, Rated 6.351kv, Phase-I, 50Hz, Rated current Amp 22.83 as Per IS 13925 PART-I including cost and conveyance , transportation etc complete as directed by the Departmental officers.

4

58800

235200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of surge arrester of 9KA, 10KA class-I, 50hz, type STN-DT, mcov 7.2kvpr.rel current 40ka, 40KA including cost and conveyance of material to site, etc all as per the tandard specifications.

3

12000

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of surge arrester of the following specifications 30KV, 10KA, CLASS-2, 50HZ, TYPE STN-DT, MCOV-24KV, PR.REL CURRENT 40KA including cost and conveyance of material to site, etc all as per the tandard specifications.

3

20000

60000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of pad clamps for 33 KV and 6.6KV Structure to suit the existing systems including cost of materials, labour charges for loading and unloading , transportation to work site as per old sample as directed by the departmental officers

100

650

65000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of 6.6 KV side ceramic bushings to suit the existing for 3.15 MVA power transformer, as per old sample including cost of material,transportation etc.,complete as directed by the Departmental officers.

6

4500

27000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery and fixing of 33 KV side ceramic bushings to suit the existing for 3.15 MVA power transformer, as per old sample including cost of material,transportation etc.,complete as directed by the Departmental officers.

6

6500

39000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply, delivery and fixing of Buchholz relay to suit the existing for 33/11/6.6 KV, 3.15 MVA power Transformer at Substation as per old sample including cost of material, transportation etc.,complete as directed by the Departmental officers.

2

33000

66000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Servicing duly replacing burnt Vaccuum contacts of 1200 A / 6.6kv rating for 6.6KV Vaccum circuit breaker including Trouble shooting and rectification should be attended immediately whenever fault occurse including cost of spares what ever required etc all complete as directed by Departmental officers.

15

5500

82500

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Servicing duly replacing burnt Vaccuum contacts of 1000 A / 33kv rating for 33KV Vaccum Vaccum circuit breaker including Trouble shooting and rectification should be attended immediately whenever fault occurse including cost of spares what ever required etc all complete as directed by Departmental officers.

12

6500

78000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and Spreading of 40 mm Metal including cost and conveyance of material labour charges for sprearding and levelling in Kalabgoor Substation Yard as directed by the departmental officers (50.00mx20.00mx0.15m=150 cum )

150

2050

307500

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Petrolium jelly to apply in regular maintenance to each contacts to avoid corrossion and rust etc., complete as directed by the departmental officers.

24

200

4800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;House keeping of Substation by supplying of house keeping material like, coco brooms, Detergents, floor duster, phenyl, cotton waste, cheese cloth etc., as per requirement

24

4000

96000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply and delivery of Carbon Tetra Cloride for cleaning Contactors & flashed panels etc.

48

200

9600

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Printing and supply of Daily log book for Sub station / Pump houses with ledger pages with full calicoo/hard binding with 100 pages/book of size 600 x 450 mm as directed by the departmental officers.

12

3000

36000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Pest Control services to avoid entry of Reptiles, Lizards, Rats, Mice etc in to Electrical control panels to avoid major break downs and heavy flashes and damages Electrical Equipment, once in a month by Spraying Specially formulated Pesticide near all HT , LT Electrical panels, cable trenches, cable ducts, entire control rooms and surroundings to avoid pumping interruptions frequently including cost of pesticides, services etc all complete as directed by the departmental officers ( once in a two months)

12

3500

42000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance fire extinguitiors duly refilling of CO2 and replacement of damaged/defunct spares etc at Sub station including cost of materials , services and transportation etc., complet maintenance. Once in year

10

150

1500

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Re conditioning of Earth pits time to time to obtain Er values as per IE rules at Sub station by providing required charcol, salt , men and material complete annual maintenance

240

50

12000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for C & R Panels of 33/6.6 KV breakers , complete annual maintenance including servicing and repairing including spares as directed by Departmental officers.

24

3500

84000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular repairing and trouble shooting of 33KV and 6.6KV panel under Voltage relay make 110V AC operating voltage, 110V DC Aux. voltage including the cost of trouble shooting whenever fault occurred material and transportation complete annual maintenance substation as directed by Departmental officers.

24

655

15720

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing, reconditioning, testing and commissioning of 6.6 KV Vaccum Circuit breakers , including control wiring like incomers, motor feeders ,capacitors etc., complete annual maintenance & Trouble shooting should be attended immediately whenever fault occurred, as directed by Departmental officers.

48

850

40800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, repairing, reconditioning of 33KV 1000 Amps Vacuum Circuit breakers, including control wiring like incomers, motor feeders ,capacitors etc., complete annual maintenance & Trouble shooting should be attended immediately whenever fault occurred as directed by Departmental officers.

12

850

10200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, reconditioning, replacement of damaged parts if any, reconditioning, testing and trail run of 110V DC dual battery chargers and battery bank complete maintenance, at Sub station as directed by Departmental officers.

12

650

7800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Servicing, reconditioning and trouble shooting of CTR make OLTC & RTCC cgl panel wiring make AVR panels complete annual maintenance as directed by Departmental officers.

12

735

8820

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of Internal lighting duly providing LED lamps, in place of burnt out lighting in the premises to maintain the illumination in substation and access roads complete under annual maintenance

30

2500

75000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular Maintenance of BUCHHOLZ relay of 33/6.6 KV , 2.5 MVA Power transformer make Crompton Greaves Limited electric , complete annual maintenance including servicing and repairing as directed by Departmental officers.

24

470

11280

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular Maintenance of BUCHHOLZ relay of 33/6.6, 3.15 MVA Power transformer make Crompton Greaves Limited electric , complete annual maintenance including servicing and repairing as directed by Departmental officers.

24

470

11280

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Maintenance of 33/11/6.6 KV Electrical Substation at Kalabgoor

1

-

-

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Exterior walls are painted with one coast of primer and 2 coats of exterior emulsion paint

3000

119

357000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Supply of essential spares Oil filter element 07 2710143250 KESe 37 7.5, Air filter Element 0727303377250 KESe 37 7.5 and k-smart premium KESe 072700247850 37 7.5 lubricant including transportation etc complete as directed by dept officers.

2

155000

310000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and rectification of 6.6 kv FCMA type soft starter duly replacing the spares for FCMA (Flux compensated Magnetic Amplifier) type soft starter such as circuit breaker, contactor, thrermal over lead relays, Tyrister firing circuit, bypass contactors, rectifiers, transformers and micrometer etc inlcuding re-wiring etc complete along with service charges for operating the 810kw HT squrrel cage induction motors complete as directed by dept officers.

2

175000

350000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair and rectification of 6.6 kv FCMA type soft starter duly replacing the H.T Modules Three phases RYB of 6.6 kv ratings to suit the existing FCMA (Flux compensated Magnetic Amplifier) type soft starter for operating the 810kw HT squrrel cage induction motors complete as directed by dept officers.

2

165000

330000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Providing bearings to the 810kw InductionType C.G make 6.6KV HT Motor including supply of DE & NDE side bearings, decoupling the pump from motor, opening the Motor duly unscrewing the fasteners, removing rotating unit, remoing the worn out bearings, replacing with new recommended type bearings, providing new packing, seals, re-assembling the Motor, coupling with Pump, making alignment, checking, testing,trial and commissioning etc complete incl cost of bearings as per standards and as directed by the Departmental officers.

2

230000

460000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Providing bearings to the 810kw HSC Type M&P make Pump including supply of DE & NDE side bearings, decoupling the pump from motor, opening the pump duly unscrewing the fasteners, removing rotating unit, remoing the worn out bearings, replacing with new recommended type bearings, providing new packing, seals, gland ropes re-assembling the pump, coupling with motors, making alignment, checking, testing,trial and commissioning etc completecomplete incl cost of bearings as per standards and as directed by the Departmental officers.

2

220000

440000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;supply and delivery of HRC fuses of 6.6kv 200 Amps to suit the existing system of Megawin breakers of 6.6 kv control panel at Phase-II Pump House including cost and conveyance.

12

15000

180000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Synthetic enamel painting to the pumps, motors, valves, manifolds, pipe line,railing etc duly cleaning the corrosion etc complete as directed by the departmental officials.

500

300

150000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair , Reconditioning of 600 mm dia Non Return Valve duly replacing spres such as shutter, shafts, pinion shaft locks, seals etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers

4

70000

280000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair , Reconditioning of 600 mm dia butter fly valves duly replacing the gears, pinion, gears, bushes, seals, packings, other spares etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers

4

75000

300000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Repair , Reconditioning of 600 mm dia Sluice valves duly replacing the spindle rods, check nuts, bushes, seals, packings, etc including the cost of spares, services, labour charges, etc complete as directed by the Departmental Officers

4

75000

300000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Trouble shooting and rectification team for testing/ trouble shooting and electrical maintenance of pumping station and to monitor the system to avoid major interruptions and to act as emergency team during breakdowns, or taken up major works etc along with Men, machinery, all tools and test equipment etc., as directed by the departmental officers.

8

5000

40000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: Servicing, repairing, reconditioning, testing and trouble shooting of EOT crane, like the panel Contactors, brake liners, replacement of Indications, fuses, connectors, lugs, rewinding of motors, brake liners, testing of control wiring complete Regular maintenance as directed by the departmental officers and major spares like Gear boxes, etc., will be supplied by the department if required.

4

2500

10000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Pest Control services to avoid entry of reptiles,Lizards, Rats, Mice etc into Electrical control panels to avoid major break downs and heavy flashes and damages to Electrical Equipment, once in a month by Spraying Specially formulated Pesticide near all HT , LT Electrical panels, cable trenches, cable ducts, entire control rooms and surroundings to avoid major pumping interruptions frequently including cost of material and all taxes and duties complete as directed by the departmental officers

24

4000

96000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: Servicing of 810 KW/6.6kv Induction motors Crompton Greaves make checking Electrical connections, rectification if necessary, applying the recomended grade lubricants, at NDE DE bearings, replacing the coupling bolts, bushes if necessary, as per old sample at pump house

18

4500

81000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: Servicing of 810 KW HSC type Mather+Platt make Pumps duly applying the recomended grade lubricants at NDE DE bearings, replacing glands, checking gaskets, fasteners.except major repairs etc complete maintenance as directed by the departmental officers, Major parts like shafts, Bearings, Mechanical seals etc., will be provided by the department if required.

18

4500

81000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Internal lighting : Providing Luminaries etc., in place of burnt out lighting mateirals to maintain the illumination in pumping plant complete regular maintenance

80

2500

200000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Maintenance of out going motor feeding panels 6.6KV 400 Amps, Megawin make:Vaccum Contactor includes control wiring etc. complete as directed by the department officials once in year if any spares recomended amount will be added as per the HMWSSB officials approval

8

16000

128000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Maintenance of Incomer panels of 6.6KV 800 Amps, Megawin make:Vacuum Circuit breakers includes control wiring, breaker servicing etc. complete as directed by the department officials.

6

18000

108000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of 10 HP vacuum pump sets which includes overhauling and servicing duly replacement of bearings, shaft sleeves, check nuts, gaskets, metal filling, machining, grease, gland ropes and other minor parts if any, labour charges etc as directed by departmetal officials.

4

25000

100000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: repair and reconditioning of 10 HP motor of vacuum pump sets which includes overhauling and servicing duly rewinding, replacement of bearings, shaft sleeves, cabling, starter etc and other minor parts if any, labour charges etc as directed by departmetal officials.

4

25000

100000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance: Re-conditioning of fire extinguitiors and other safety equipment at Phase-II pump house duly transporting and re filling required gas CO2 including cost of material and transportation etc. complete Regular maintenance.

12

150

1800

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance and Servicing, reconditioning, replacement of damaged parts if any, reconditioning, testing and trial run of dual battery chargers and battery bank 48 V/10+10(20 A) , capacity 55AH complete Regular maintenance, at pump house as directed by the Departmental officers.

48

650

31200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance of 50HP Compressors : Servicing of 50HP/37.50kw kirloskar make screw type air compresswors duly Providing necessary spare such as Air Filters, Oil Filters, recomended grade Lubricants, draining out the burnt oil,re-filling with the new lubricants etc including service charges of Engineers etc including testing, trial and commissioning etc all complete as per standards at Phase-II Pumping station Kalabgoor as Directed by the Departmental officers

4

6000

24000

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of Master Trip falt realy protection relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

24

800

19200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT Sensitive Earth fault realy protection relays of electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

24

800

19200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT Over current Earth falt realy protection relays of Alstoml make electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

24

800

19200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Regular maintenance for Repairing of HT motor protection relays of Alstom make electronic relays including replacement of damaged parts and through the manufacturer and trail run and trouble shooting should be attended immediately in the pump house, whenever fault occurred, complete Regular maintenance as directed by Departmental officers.

24

800

19200

... More
Annual Maintenance Phase I and II Clear water Pumping Station;Maintenance of Phase-II Clear Water Pump House at Kalabgoor

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.