Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Water Storage And Supply
Opening Date28 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 19,17,031
Costs
EMD
₹ 19,170Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
564899Tender No
189/CGM(E)/O&MC.II/D4/2024-25, Dt.28.12.2024 (1st Call)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Water Supply;Supply and fixing of RCC precast manholes chambers having the size of 36 at bottom to 21 dia at top fixing in CC 1:4:8 Prop, laying CC 1.2:4 prop: including cost of FRC Cover and frame and all material labour charges curing conveyance etc., complete as directed by the H.M.W.S.&.S. Board Engineers.(150/100mm dia)
8
6752
54019.2
... More
Water Supply;Supply of good quality gravel for filling wherever required as directed by deprtmental officers including cost and conveyance of gravel stacking levelling watering, tamping rolling, all leads, labour charges and other incidental and operational charges etc.,complete.
20.69
714
14792.07
... More
Water Supply;Jointing of DI Pipes and and valves with D/F ends with Nuts and Bolts including Insertion rubber including cost Coneyance of all materials and labour charges etc., complete as directd by departmental Officer.(150mm dia)
6
493
2959.8
... More
Water Supply;Jointing of DI Pipes and and valves with D/F ends with Nuts and Bolts including Insertion rubber including cost Coneyance of all materials and labour charges etc., complete as directd by departmental Officer.(200mm dia)
8
539
4317.6
... More
Water Supply;Jointing of DI Pipes and and valves with D/F ends with Nuts and Bolts including Insertion rubber including cost Coneyance of all materials and labour charges etc., complete as directd by departmental Officer.(450mm dia)
2
1919
3839
... More
Water Supply;Lowering sluice valve into Trenches true to alignment and keeping in position including all labour charges etc complete.(150mm dia)
3
432
1298.1
... More
Water Supply;Lowering sluice valve into Trenches true to alignment and keeping in position including all labour charges etc complete.(200mm dia)
4
713
2855.2
... More
Water Supply;Lowering sluice valve into Trenches true to alignment and keeping in position including all labour charges etc complete.(450mm dia)
1
3916
3916
... More
Water Supply;Redoing domestic sewer line connection including EWE in all available soils and including supply delivery of 100 mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop. etc. complete including cost conveyance of all labour charges etc complete SWG connections.
27
298
8046
... More
Water Supply;Redoing of 15mm PPC connection for domestic water supply connection including earth work excavation cost of MDPE pipes refilling etc.,complete as directed by the HMWS&SB Engineers.
40
254
10176
... More
Water Supply;Supply and Fixing of 50mm dia Nominal Bore GI pipe light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fitting & labour charges complete.
10
519
5190
... More
Water Supply;Jointing of DI Pipes and Specials with S/S ends in readymade trenches true to alignment and gradiient, wxcluding the cost of jointing materials such as cement & Spun Yarn But includingthe cost of fuel for melting the lead and labour charges.(150mm dia)
20
217
4346
... More
Water Supply;Jointing of DI Pipes and Specials with S/S ends in readymade trenches true to alignment and gradiient, wxcluding the cost of jointing materials such as cement & Spun Yarn But includingthe cost of fuel for melting the lead and labour charges.(200mm dia)
100
237
23760
... More
Water Supply;Lowering the 150mm dia DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
22
105
2316.6
... More
Water Supply;Lowering the 200mm dia DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
352
153
53856
... More
Water Supply;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
60
417
25021.2
... More
Water Supply;Cutting water supply mains without water in main, including cost of implements and all labour charges etc complete as directed by Dept. officers (100mm dia)
5
147
737
... More
Water Supply;Cutting water supply mains without water in main, including cost of implements and all labour charges etc complete as directed by Dept. officers (200mm dia)
5
368
1843
... More
Water Supply;Cutting water supply mains without water in main, including cost of implements and all labour charges etc complete as directed by Dept. officers (450mm dia)
2
829
1658.6
... More
Water Supply;Manufactur supply and delivery MS Collar to suit 450mm dia Pipe for the length of 0.6mtr with making socket making with 6mm thick metal including cost of material, Fabrication charges, Black epoxy painting charges and Transportation charges etc, complete.
1
5163
5163.19
... More
Water Supply;Manufactur supply and delivery MS Collar to suit 200mm dia Pipe for the length of 0.6mtr with making socket making with 6mm thick metal including cost of material, Fabrication charges, Black epoxy painting charges and Transportation charges etc. complete
3
2621
7864.26
... More
Water Supply;Manufactur supply and delivery of 200mm dia MS pipe for the length of 1.00 mir with socket making with 6mm thick metal including cost of material, Fabrication charges, Black epoxy painting charges and Transportation charges etc. complete.
4
2656
10627.2
... More
Water Supply;Manufactur supply and delivery of 200mm dia MS "Z" bend pipe for the length of 3.20mir with socket making with 6mm thick metal 8 including cost of material, Fabrication charges, Black epoxy painting charges and Transportation charges etc. complete.
2
9163
18327.08
... More
Water Supply;Dismantling and Re Construction of CRS Masonary 2nd sort in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, CRS, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges, curing charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
5.4
5958
32174.44
... More
Water Supply;Rock cutting and depositing on bank in hard rock and boulders more that 3 cum in size including stacking and drilling holes, chiselling, wedging and breaking of rock without blasting. Complete as per specification drawings and as directed by the deptl. officers including leads and lifts, all incidantal and operationals charges etc. with an initial lead of 10 mtrs etc. complete but excluding dewatering for pipeline trenches. by mechanical means etc., complete as directed by the HMWS&SB Engineers.
20.69
1230
25453.62
... More
Water Supply;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Junction portion and pipeline trenches).
413.88
497
206029.46
... More
Water Supply;Conveyance of SWG pipes from departmental stores to work site, including loading, unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (300mm dia SWG)
11.07
1677
18569.92
... More
Water Supply;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers. (200mm dia SWG)
748
234
175555.6
... More
Water Supply;Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc., complete as directed by the HMWS&SB Engineers.
158.65
2939
466399.27
... More
Water Supply;Cutting of open BT road surface including labour charges, all leads and other incidental and operational charges tool and plants etc., complete as directed by the HMWS&SB Engineers.
97.86
1412
138261.5