For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Civil And Construction
Water Storage And Supply
Opening Date28 Apr 2023
Closing Date5 May 2023
Tender Amount₹ 7,85,140 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mohammedia Masjid;Conveyance of 100mm dia DI pipes and specials from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

1.15

1504

1729.83

... More
Mohammedia Masjid;Supply and fixing of precasted RCC manhole chamber having the of 36'' at bottom and 21'' dia at top with tappers excluding cost of FRC cover and frame and including laying in CC (1:2:4) prop including cost of materials, labour charges , curing conveyance etc., complete as directed by the HMWS&SB Engineer.

1

6696

6696

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and valves with D/F joints with nuts, bolts and rubber insertion including cost of material and labour charges etc., complete as directed by the HMWS&SB Engineers.

2

307

615.4

... More
Mohammedia Masjid;Labour charges for 100mm dia lowering and keeping in position of DI sluice valve into the readymade trenches etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

1

229

229.2

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and fittings with rubber gaksets excluding the cost of rubber gasket but including filling with lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

14

163

2289

... More
Mohammedia Masjid;Lowering and laying of 100mm dia DI K7 pipes in readymade trenches true to alignment and gradient including all sundries but excluding conveyance of pipes from sources of supply etc., complete as directed by the HMWS&SB Engineers.

75

58

4365

... More
Mohammedia Masjid;Cutting of 100mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

132

265.2

... More
Mohammedia Masjid;Barricading, hoarding, lighting and Watching etc., for Water supply and sewerage pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

150

217

32610

... More
Mohammedia Masjid;Earth work excavation and depositing on banks for pipe line trenches with an initial lead of 10 m. and lift of 2 m in all available soils including labour charges, all operational and incidental charges etc., complete as directed by the H.M.W.S.& S. Board Engineers.

43.94

450

19781.79

... More
Mohammedia Masjid;5) H.No. 19-1-1097/1/7/A to 19-1-1097/1/3/A/1: Cutting open C.C Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

7.27

2940

21373.8

... More
Mohammedia Masjid;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers

10.78

182

1962.71

... More
Mohammedia Masjid;supply and filling of Quary dust including conveyance, loading, unloading and stacking etc. complte as directed by the H.M.W.S.&.S. Board Engineers.

6.6

614

4053.72

... More
Mohammedia Masjid;Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.

36

237

8542.8

... More
Mohammedia Masjid;Conveyance of 100mm dia DI pipes and specials from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

1.08

1504

1624.54

... More
Mohammedia Masjid;Supply and fixing of precasted RCC manhole chamber having the of 36'' at bottom and 21'' dia at top with tappers excluding cost of FRC cover and frame and including laying in CC (1:2:4) prop including cost of materials, labour charges , curing conveyance etc., complete as directed by the HMWS&SB Engineer.

2

6696

13392

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and valves with D/F joints with nuts, bolts and rubber insertion including cost of material and labour charges etc., complete as directed by the HMWS&SB Engineers.

4

307

1230.8

... More
Mohammedia Masjid;Labour charges for 100mm dia lowering and keeping in position of DI sluice valve into the readymade trenches etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

229

458.4

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and fittings with rubber gaksets excluding the cost of rubber gasket but including filling with lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

21

163

3433.5

... More
Mohammedia Masjid;Jointing of 200mm dia DI pipes and fittings with rubber gaksets excluding the cost of rubber gasket but including filling with lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

219

439.6

... More
Mohammedia Masjid;Lowering and laying of 100mm dia DI K7 pipes in readymade trenches true to alignment and gradient including all sundries but excluding conveyance of pipes from sources of supply etc., complete as directed by the HMWS&SB Engineers.

70

58

4074

... More
Mohammedia Masjid;Cutting of 200mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

331

662.8

... More
Mohammedia Masjid;Barricading, hoarding, lighting and Watching etc., for Water supply and sewerage pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

140

217

30436

... More
Mohammedia Masjid;Earth work excavation and depositing on banks for pipe line trenches with an initial lead of 10 m. and lift of 2 m in all available soils including labour charges, all operational and incidental charges etc., complete as directed by the H.M.W.S.& S. Board Engineers.

42.68

450

19214.54

... More
Mohammedia Masjid;4) H.No. 19-1-1079 to 19-1-1082/2/C at Bandlaguda: Cutting open C.C Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

10.78

2940

31693.2

... More
Mohammedia Masjid;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers

15.51

182

2823.91

... More
Mohammedia Masjid;supply and filling of Quary dust including conveyance, loading, unloading and stacking etc. complte as directed by the H.M.W.S.&.S. Board Engineers.

10.2

614

6264.84

... More
Mohammedia Masjid;Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.

20

237

4746

... More
Mohammedia Masjid;Conveyance of 100mm dia DI pipes and specials from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

1.69

1504

2542.1

... More
Mohammedia Masjid;Supply and fixing of precasted RCC manhole chamber having the of 36'' at bottom and 21'' dia at top with tappers excluding cost of FRC cover and frame and including laying in CC (1:2:4) prop including cost of materials, labour charges , curing conveyance etc., complete as directed by the HMWS&SB Engineer.

2

6696

13392

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and valves with D/F joints with nuts, bolts and rubber insertion including cost of material and labour charges etc., complete as directed by the HMWS&SB Engineers.

2

307

615.4

... More
Mohammedia Masjid;Labour charges for 100mm dia lowering and keeping in position of DI sluice valve into the readymade trenches etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

1

229

229.2

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and fittings with rubber gaksets excluding the cost of rubber gasket but including filling with lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

14

163

2289

... More
Mohammedia Masjid;Lowering and laying of 100mm dia DI K7 pipes in readymade trenches true to alignment and gradient including all sundries but excluding conveyance of pipes from sources of supply etc., complete as directed by the HMWS&SB Engineers.

110

58

6402

... More
Mohammedia Masjid;Cutting of 100mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

132

265.2

... More
Mohammedia Masjid;Barricading, hoarding, lighting and Watching etc., for Water supply and sewerage pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

220

217

47828

... More
Mohammedia Masjid;Earth work excavation and depositing on banks for pipe line trenches with an initial lead of 10 m. and lift of 2 m in all available soils including labour charges, all operational and incidental charges etc., complete as directed by the H.M.W.S.& S. Board Engineers.

62.84

450

28290.57

... More
Mohammedia Masjid;3) Golla Khidki Kaman: Cutting open C.C Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

15.51

2940

45599.4

... More
Mohammedia Masjid;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers

4.47

182

813.85

... More
Mohammedia Masjid;supply and filling of Quary dust including conveyance, loading, unloading and stacking etc. complte as directed by the H.M.W.S.&.S. Board Engineers.

3

614

1842.6

... More
Mohammedia Masjid;Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.

20

237

4746

... More
Mohammedia Masjid;Conveyance of 100mm dia DI pipes and specials from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

1.84

1504

2767.73

... More
Mohammedia Masjid;Supply and fixing of precasted RCC manhole chamber having the of 36'' at bottom and 21'' dia at top with tappers excluding cost of FRC cover and frame and including laying in CC (1:2:4) prop including cost of materials, labour charges , curing conveyance etc., complete as directed by the HMWS&SB Engineer.

2

6696

13392

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and valves with D/F joints with nuts, bolts and rubber insertion including cost of material and labour charges etc., complete as directed by the HMWS&SB Engineers.

2

307

615.4

... More
Mohammedia Masjid;Labour charges for 100mm dia lowering and keeping in position of DI sluice valve into the readymade trenches etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

1

229

229.2

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and fittings with rubber gaksets excluding the cost of rubber gasket but including filling with lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

14

163

2289

... More
Mohammedia Masjid;Lowering and laying of 100mm dia DI K7 pipes in readymade trenches true to alignment and gradient including all sundries but excluding conveyance of pipes from sources of supply etc., complete as directed by the HMWS&SB Engineers.

120

58

6984

... More
Mohammedia Masjid;Cutting of 100mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

132

265.2

... More
Mohammedia Masjid;Barricading, hoarding, lighting and Watching etc., for Water supply and sewerage pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

240

217

52176

... More
Mohammedia Masjid;Earth work excavation and depositing on banks for pipe line trenches with an initial lead of 10 m. and lift of 2 m in all available soils including labour charges, all operational and incidental charges etc., complete as directed by the H.M.W.S.& S. Board Engineers.

68.24

450

30721.65

... More
Mohammedia Masjid;2) Abubaker Masjid to Shabbir Bhai House: Cutting open C.C Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

4.47

2940

13141.8

... More
Mohammedia Masjid;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers

26.48

182

4821.21

... More
Mohammedia Masjid;supply and filling of Quary dust including conveyance, loading, unloading and stacking etc. complte as directed by the H.M.W.S.&.S. Board Engineers.

16.62

614

10208

... More
Mohammedia Masjid;Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.

60

237

14238

... More
Mohammedia Masjid;Conveyance of 100mm dia DI pipes and specials from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

2.74

1504

4121.51

... More
Mohammedia Masjid;Supply and fixing of precasted RCC manhole chamber having the of 36'' at bottom and 21'' dia at top with tappers excluding cost of FRC cover and frame and including laying in CC (1:2:4) prop including cost of materials, labour charges , curing conveyance etc., complete as directed by the HMWS&SB Engineer.

3

6696

20088

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and valves with D/F joints with nuts, bolts and rubber insertion including cost of material and labour charges etc., complete as directed by the HMWS&SB Engineers.

6

307

1846.2

... More
Mohammedia Masjid;Labour charges for 100mm dia lowering and keeping in position of DI sluice valve into the readymade trenches etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

3

229

687.6

... More
Mohammedia Masjid;Jointing of 100mm dia DI pipes and fittings with rubber gaksets excluding the cost of rubber gasket but including filling with lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

13

163

2125.5

... More
Mohammedia Masjid;Jointing of 300mm dia DI pipes and fittings with rubber gaksets excluding the cost of rubber gasket but including filling with lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

284

569.2

... More
Mohammedia Masjid;Lowering and laying of 100mm dia DI K7 pipes in readymade trenches true to alignment and gradient including all sundries but excluding conveyance of pipes from sources of supply etc., complete as directed by the HMWS&SB Engineers.

178

58

10359.6

... More
Mohammedia Masjid;Cutting of 300mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

497

994.2

... More
Mohammedia Masjid;Barricading, hoarding, lighting and Watching etc., for Water supply and sewerage pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

356

217

77394.4

... More
Mohammedia Masjid;Earth work excavation and depositing on banks for pipe line trenches with an initial lead of 10 m. and lift of 2 m in all available soils including labour charges, all operational and incidental charges etc., complete as directed by the H.M.W.S.& S. Board Engineers.

104.44

450

47018.89

... More
Mohammedia Masjid;1) Mohammedia Masjid at Chataknipura: Cutting open C.C Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

26.47

2940

77821.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.