Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
500629Bid Award Id
ViewTender No
1212/CGM(E)/O&MC.II/RCC NP3/D4/2023-24, Dt.20.02.2024 (1st Call)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Sewerage Work;Supply and delivery of cement of good quality including cost and conveyance etc., complete as directed by the HMWS&SB Engineers.
89.84
678
60997.77
Sewerage Work;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 3 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
344.31
182
62688.52
Sewerage Work;Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers. (For Road restoration).
26.82
5772
154831.06
Sewerage Work;Supply, delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads labour charges and other incidential and operatinal charges etc. complete as directed by departmental officers.
72
614
44222.4
Sewerage Work;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
90
548
49408.2
Sewerage Work;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers. (250/200mm dia SWG)
800
217
173920
Sewerage Work;Construction of 1.2M X1.2M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:8prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
259.5
2126
551697
Sewerage Work;Construction of 1.2M X1.2M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:8prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
14
36074
505036
Sewerage Work;Lowering, laying the 250mm dia SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers.
400
500
200000
Sewerage Work;Manufacture, supply and Delivery of Rubber ring to suit RCC Spun / Vibrated Cast (Reinforced) Socket and Spigot Pipes conforming to B.I.S 5382/1985 (rate per each rubber ring) including transportation but excluding taxes. The Rubber Rings shall be tested at the factory premises conforming to B.I.S 5382/1985. etc., complete as directed by the HMWS&SB Engineers. (For 450mm-dia RCC NP3 )
160
265
42400
Sewerage Work;Conveyance of RCC Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes on all weather roads including loading, unloading and stacking (per metre of effective length). etc. complete as directed by the H.M.W.S.&.S. Board Engineers.(For 450mm-dia RCC NP3 )
400
98
39248
Sewerage Work;Manufacture, supply and Delivery RCC Spun / Vibrated Cast (Reinforced) Socket and pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) Excluding transportation & taxes. etc., complete as directed by the HMWS&SB Engineers. (For 450mm-dia RCC NP3 )
400
2215
886000
Sewerage Work;Brick masonary 2nd class grounded moulded in cement Motor 1:6 prop: having minimum crushing strength 40kgs per sq.m including cost and conveyance of all materials like cement, sand, bricks, water etc to site including seigniorage charges on all materials, all taxes including all labour charges like mixing cement motor scaffolding charges, lift charges, curing charges etc complete to finished item of work
17.5
3970
69478.68
Sewerage Work;Dismantling and re-construction of CRS masonry in CM (1:6) prop: with available stones including cost and conveyance of all materials, labour charges, curing etc., complete as directed by the H.M.W.S.&.S. Board engineers.
9.5
5552
52752.55
Sewerage Work;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For construction of manhole).
319.69
293
93701.14
Sewerage Work;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Rock Qty 2%).
89.84
1342
120565.28
Sewerage Work;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Junction portion and pipeline trenches).
1706.87
215
368513.23
Sewerage Work;Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
63.04
2940
185337.6
Sewerage Work;Description of Item
-
-
-