Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,339Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
565137Tender No
EP-179/CGM(E)/RC/2024-25, Dt:30.12.2024Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 300mm dia Sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
1
1126
1126
... More
Laying of 300mm dia Sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
2
14944
29888
... More
Laying of 300mm dia Sewer connection;Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
10
254
2544
... More
Laying of 300mm dia Sewer connection;Lowering, laying and jointing 300mm SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
30
521
15642
... More
Laying of 300mm dia Sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for manhole all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
4.73
324
1532.99
... More
Laying of 300mm dia Sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
37.32
497
18577.9
... More
Laying of 300mm dia Sewer connection;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
60
234
14082
... More
Laying of 300mm dia Sewer connection;Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
6.08
1412
8590.13
... More
Laying of 300mm dia Sewer connection;Conveyance of SWG pipes from departmental stores of HMWSSB to work site including transportation loading, unloading and stacking etc., all labour incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
30
20
606
... More
Laying of 300mm dia Sewer connection;Item Detailed Specification Description
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements