Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date23 Dec 2024
Closing Soon24 Dec 2024
Tender Amount₹ 22,03,271
Costs
EMD
₹ 22,033Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
564304Tender No
EP.No.172/CGM(E)/O&M C-V/O&M Div-XI/2024-25, Dt: 23.12.2024Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of collapsed 900mm dia RCC sewer;Construction of 1.5 X 1.5 sewer manhole with standard cement bricks made with CM (1:2) prop; inclusive of PCC M20 prop; with Sulphate Resistant Cement using 6mm to 20mm HG metal with SRC for benching, haunches and channels with inside plastering one coat of sulphate resistant CM(1:1) prop; 12mm thick, outside plastering in CM(1:1) prop; 12mm thick, the foundation concrete in CC (1:4:8) prop; using 40mm nominal size hard broken granite stone and supporting incoming pipes with concrete block/masonary wherever necessary including finishing the gap with CM (1:1) prop; on both the sides including supply and fixing of manhole frame and cover and Fiber encapsulated steps including supply and fixing of safety grills,cost and conveyance of all of materials and other incidential and operational charges etc., complete.
2
119266
238533.2
... More
Construction of collapsed 900mm dia RCC sewer;Engaging Hydraulic Crane 16 tonnes capacity for lifting purpose including hire charges of crane, wages to operator and all labour charges etc., complete as directed by the H.M.W.S.& S. Board Engineers.
16
3178
50851.2
... More
Construction of collapsed 900mm dia RCC sewer;Manufacture, supply and delivery of 900 mm dia RCC NP4 pipes confirming to IS:458-2003 using sulphate resistance cement confirming to IS:12330-1988 with inlining 8mm thick with high alumina cement confirming to IS:6452 for 400/450/500mm dia in standard lengths with socket and spigot ends with SBR rubber rings including cost of all materials, rubber rings, all taxes and duties and delivery to site, unloading, hoisting, carefully lowering in the ready made trenches and on pedestals, laying true to alignment and gradient by using cranes, jointing with rubber rings and testing as per the specifications including cost and conveyance of all materials to site, labour charges, all other incidental and operational charges etc., complete.
40.5
9496
384620.4
... More
Construction of collapsed 900mm dia RCC sewer;Collection supply and filling with Dust/HBG Stone chips 2.36mm and below in the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work
400
644
257840
... More
Construction of collapsed 900mm dia RCC sewer;Supply and filling with carted gravel in pipe line trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. including cost and conveyance of all materials and labour charges, and contractors profit & over heads but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO. 309 & 310) as directed by the H.M.W.S.&.S. Board Engineers.
240
714
171552
... More
Construction of collapsed 900mm dia RCC sewer;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. For Pipelines by manual means
640
497
318592
... More
Construction of collapsed 900mm dia RCC sewer;Engaging Shovel 0.85 cum 110 hp for Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic, including all incidental and operational charges etc., complete.
64
3557
227692.8
... More
Construction of collapsed 900mm dia RCC sewer;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete, as directed by the H.M.W.S.&.S. Board Engineers. For 10 HP
1280
570
72960
... More
Construction of collapsed 900mm dia RCC sewer;Cutting open CC Road with including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.
37.26
2939
109536.95
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%