Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Pipe Line Project
Opening Date18 Jan 2025
Closing Soon24 Jan 2025
Tender Amount₹ 7,05,054
Costs
EMD
₹ 7,051Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
568937Tender No
EP-188/CGM(E)/RC/2024-25, Dt:18.01.2025Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 250/200mm dia water supply;Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
7.29
1677
12228.98
... More
Laying of 250/200mm dia water supply;Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
3
6752
20257.2
... More
Laying of 250/200mm dia water supply;Jointing 150 mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
493
986.6
... More
Laying of 250/200mm dia water supply;Jointing 200 mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
539
1079.4
... More
Laying of 250/200mm dia water supply;Jointing 250 mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
739
1478
... More
Laying of 250/200mm dia water supply;Labour charges for lowering and keeping in position 150mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
432
432.7
... More
Laying of 250/200mm dia water supply;Labour charges for lowering and keeping in position 200mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
713
713.8
... More
Laying of 250/200mm dia water supply;Labour charges for lowering and keeping in position 250mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
1014
1014.5
... More
Laying of 250/200mm dia water supply;Jointing of 150mm dia DI/CI pipes with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
3
217
651.9
... More
Laying of 250/200mm dia water supply;Jointing of 200mm dia DI/CI pipes with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
48
237
11404.8
... More
Laying of 250/200mm dia water supply;Jointing of 250mm dia DI/CI pipes with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
8
268
2151.2
... More
Laying of 250/200mm dia water supply;Jointing of 400mm dia DI/CI pipes with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
4
393
1573.2
... More
Laying of 250/200mm dia water supply;Lowering the 200mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
214.5
153
32818.5
... More
Laying of 250/200mm dia water supply;Lowering the 250mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
22
206
4547.4
... More
Laying of 250/200mm dia water supply;Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
276
552.8
... More
Laying of 250/200mm dia water supply;Cutting of 200mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
4
368
1474.4
... More
Laying of 250/200mm dia water supply;Cutting of 250mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
460
921.4
... More
Laying of 250/200mm dia water supply;Cutting of 400mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
737
1474.2
... More
Laying of 250/200mm dia water supply;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
484
234
113594.8
... More
Laying of 250/200mm dia water supply;Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.
10.37
3534
36647.58
... More
Laying of 250/200mm dia water supply;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
259.17
497
129014.83
... More
Laying of 250/200mm dia water supply;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
32.46
2939
95425.91
... More
Laying of 250/200mm dia water supply;Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
5.22
1412
7375.08
... More
Laying of 250/200mm dia water supply;Item Detailed Specification Description
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%