Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date31 Jan 2025
Closing Soon7 Feb 2025
Tender Amount₹ 18,24,197
Costs
EMD
₹ 18,242Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
573348Tender No
EP-246/CGM(E)/O&MC-II/AMS-Works/2024-25, dt:30.01.2025 (Short Tender)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Annual Maintenance of Sewerage Network;Construction of 1.20m internal diameter sewer manhole minimum depth 1.80m with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:4) with CC bed (1:4:8) Prop with CC Bed (1:3:6) Prop. Benching and channel finished with CC(1:2:4) Prop. Internal Plastering 20 mm thickin And external plastering 12 mm Thick using CM 1:3 Prop.. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
5
37565
187825
... More
Annual Maintenance of Sewerage Network;Construction of 0.90m internal diameter sewer manhole for additional depth of 0.10 M with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM 1:4 Prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM 1:3 Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
220
1126
247720
... More
Annual Maintenance of Sewerage Network;Construction of 0.90 mts internal diameter sewer manhole minimum depth 1.00 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS-7.5 225 x 100 x 60 mm in CM (1:4) Prop. with CC Bed (1:3:6) Prop. Benching and channel finished with CC(1:2:4) Prop. Internal Plastering 20 mm thick in CM(1:4) and external plastering 12 mm Thick using CM (1:3) Prop. Excluding Manhole cover & frame , including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
15
14944
224160
... More
Annual Maintenance of Sewerage Network;Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
132.03
186
24681.69
... More
Annual Maintenance of Sewerage Network;Plain Cement concrete (1:2:4) Nominal Mix using 20 mm HG Machine Crushed graded metal ( Coarse aggregate ) using 20 mm size HG M/c (SSS) metal from approved quarry, including cost and conveyance of all materials like cement, fine aggaregate (As per GOMs No.37 Industries and commerce ( Mines-I) Dept, dated 29.05.2018, Manuactured Sand ( Rock Sand) and natural river sand in the ratio of50:50 is adpoted), coarse aggregate, water etc., to site including all operational inclidental and labour charges, such as Machine mixing, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APP No.402).
46.62
6018
280602.98
... More
Annual Maintenance of Sewerage Network;Supply delivery and filling of quarry dust (20% Rubbish 80% HBG Stone 6mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers
31.08
644
20034.17
... More
Annual Maintenance of Sewerage Network;Lowering, laying SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers. (300mm dia)
14.4
521
7508.16
... More
Annual Maintenance of Sewerage Network;Lowering, laying SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers. (250mm dia)
7.2
467
3368.16
... More
Annual Maintenance of Sewerage Network;Lowering, laying SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers. (200mm dia)
24
375
9014.4
... More
Annual Maintenance of Sewerage Network;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (5HP/Hr)
64
417
26689.28
... More
Annual Maintenance of Sewerage Network;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers
400
234
93880
... More
Annual Maintenance of Sewerage Network;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. Manual Means
187.78
223
41968.83
... More
Annual Maintenance of Sewerage Network;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. (For pipeline trenches where depth is more than 1.5 times the width).
40.08
497
19951.82
... More
Annual Maintenance of Sewerage Network;Cutting open CC Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
50.47
2939
148371.71
... More
Annual Maintenance of Sewerage Network;Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
50.47
1412
71306.54
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%