Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Drainage Work
Opening Date31 Jan 2025
Closing Soon7 Feb 2025
Tender Amount₹ 18,19,403 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Annual Maintenance of Sewerage Network;Construction of 1.20m internal diameter sewer manhole minimum depth 1.80m with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:4) with CC bed (1:4:8) Prop with CC Bed (1:3:6) Prop. Benching and channel finished with CC(1:2:4) Prop. Internal Plastering 20 mm thickin And external plastering 12 mm Thick using CM 1:3 Prop.. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

5

37565

187825

... More
Annual Maintenance of Sewerage Network;Construction of 0.90m internal diameter sewer manhole for additional depth of 0.10 M with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM 1:4 Prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM 1:3 Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.

284

1126

319784

... More
Annual Maintenance of Sewerage Network;Construction of 0.90 mts internal diameter sewer manhole minimum depth 1.00 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS-7.5 225 x 100 x 60 mm in CM (1:4) Prop. with CC Bed (1:3:6) Prop. Benching and channel finished with CC(1:2:4) Prop. Internal Plastering 20 mm thick in CM(1:4) and external plastering 12 mm Thick using CM (1:3) Prop. Excluding Manhole cover & frame , including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

20

14944

298880

... More
Annual Maintenance of Sewerage Network;Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.

129.99

186

24300.33

... More
Annual Maintenance of Sewerage Network;Plain Cement concrete (1:2:4) Nominal Mix using 20 mm HG Machine Crushed graded metal ( Coarse aggregate ) using 20 mm size HG M/c (SSS) metal from approved quarry, including cost and conveyance of all materials like cement, fine aggaregate (As per GOMs No.37 Industries and commerce ( Mines-I) Dept, dated 29.05.2018, Manuactured Sand ( Rock Sand) and natural river sand in the ratio of50:50 is adpoted), coarse aggregate, water etc., to site including all operational inclidental and labour charges, such as Machine mixing, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APP No.402).

40.86

6018

245933.89

... More
Annual Maintenance of Sewerage Network;Supply delivery and filling of quarry dust (20% Rubbish 80% HBG Stone 6mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers

27.24

644

17558.9

... More
Annual Maintenance of Sewerage Network;Lowering, laying SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers. (300mm dia)

39.6

521

20647.44

... More
Annual Maintenance of Sewerage Network;Lowering, laying SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers. (250mm dia)

16.8

467

7859.04

... More
Annual Maintenance of Sewerage Network;Lowering, laying SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers. (200mm dia)

37.2

375

13972.32

... More
Annual Maintenance of Sewerage Network;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (5HP/Hr)

59

417

24604.18

... More
Annual Maintenance of Sewerage Network;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers

100

234

23470

... More
Annual Maintenance of Sewerage Network;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. Manual Means

194.32

223

43430.52

... More
Annual Maintenance of Sewerage Network;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. (For pipeline trenches where depth is more than 1.5 times the width).

84.48

497

42054.14

... More
Annual Maintenance of Sewerage Network;Cutting open CC Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.

51.37

2939

151017.53

... More
Annual Maintenance of Sewerage Network;Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.

51.37

1412

72578.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.