Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Pipe Line Project
Opening Date21 Nov 2024
Closing Soon22 Nov 2024
Tender Amount₹ 6,40,143
Costs
EMD
₹ 6,401Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
557831Tender No
175/CGM(E)/O&MC.II/D5/2024-25, Dt.20.11.2024 (1st Call)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Water Supply;Supply, delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads labour charges and other incidential and operatinal charges etc. complete as directed by departmental officers.
24.96
644
16089.22
Water Supply;Conveyance of SWG pipes from departmental stores to work site, including loading, unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (300mm dia SWG)
6.91
1677
11591.52
Water Supply;Supply and fixing of RCC precast manholes chambers having the size of 36 at bottom to 21 dia at top fixing in CC 1:4:8 Prop, laying CC 1.2:4 prop: including cost of FRC Cover and frame and all material labour charges curing conveyance etc., complete as directed by the H.M.W.S.&.S. Board Engineers.(150/100mm dia)
8
6752
54019.2
Water Supply;Jointing of DI Pipes and Specials with S/S ends in readymade trenches true to alignment and gradiient, wxcluding the cost of jointing materials such as cement & Spun Yarn But includingthe cost of fuel for melting the lead and labour charges.(300mm dia)
51
306
15631.5
Water Supply;Jointing of DI Pipes and Specials with S/S ends in readymade trenches true to alignment and gradiient, wxcluding the cost of jointing materials such as cement & Spun Yarn But includingthe cost of fuel for melting the lead and labour charges.(150mm dia)
19
217
4128.7
Water Supply;Jointing of DI Pipes and Specials with S/S ends in readymade trenches true to alignment and gradiient, wxcluding the cost of jointing materials such as cement & Spun Yarn But includingthe cost of fuel for melting the lead and labour charges.(200mm dia)
26
237
6177.6
Water Supply;Jointing of DI Pipes and and valves with D/F ends with Nuts and Bolts including Insertion rubber including cost Coneyance of all materials and labour charges etc., complete as directd by departmental Officer.(200mm dia)
2
539
1079.4
Water Supply;Jointing of DI Pipes and and valves with D/F ends with Nuts and Bolts including Insertion rubber including cost Coneyance of all materials and labour charges etc., complete as directd by departmental Officer.(300mm dia)
10
790
7902
Water Supply;Jointing of DI Pipes and and valves with D/F ends with Nuts and Bolts including Insertion rubber including cost Coneyance of all materials and labour charges etc., complete as directd by departmental Officer.(150mm dia)
4
493
1973.2
Water Supply;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
8
417
3336.16
Water Supply;Cutting water supply mains without water in main, including cost of implements and all labour charges etc complete as directed by Dept. officers(200mm dia pipe))
2
368
737.2
Water Supply;Cutting water supply mains without water in main, including cost of implements and all labour charges etc complete as directed by Dept. officers(150mm dia pipe))
2
276
552.8
Water Supply;Cutting water supply mains without water in main, including cost of implements and all labour charges etc complete as directed by Dept. officers(300mm dia pipe))
4
552
2211.6
Water Supply;Lowering, keeping in position and fixing of sluice valve chamber (with cap/with hand wheel & reflec valvs) excluding cost of bolts,nuts,rubber insertion,sluice valve and tail pieces Complete as directed by the HMWS&SB Engineers (200mm dia)
1
713
713.8
Water Supply;Lowering, keeping in position and fixing of sluice valve chamber (with cap/with hand wheel & reflec valvs) excluding cost of bolts,nuts,rubber insertion,sluice valve and tail pieces Complete as directed by the HMWS&SB Engineers (300mm dia)
5
1444
7221.5
Water Supply;Lowering, keeping in position and fixing of sluice valve chamber (with cap/with hand wheel & reflec valvs) excluding cost of bolts,nuts,rubber insertion,sluice valve and tail pieces Complete as directed by the HMWS&SB Engineers (150mm dia)
2
432
865.4
Water Supply;Lowering the 200mm dia DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
69
153
10557
Water Supply;Lowering the 300mm dia DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
80
267
21392
Water Supply;Lowering the 150mm dia DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
39
105
4106.7
Water Supply;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For construction of manhole).
24.1
324
7810.81
Water Supply;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Junction portion and pipeline trenches).
86.32
497
42970.1
Water Supply;Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.(100mm dia)
44.24
2939
130056.75
Water Supply;Cutting of open BT road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.(100mm dia)
19.2
1412
27126.72
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%