Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date7 Mar 2025
Closing Soon10 Mar 2025
Tender Amount₹ 14,42,237
Costs
EMD
₹ 14,422Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
579969Tender No
EP- 217 (2nd Call)/CGM(E)/O and M Circle-IV/2024-25,Dtd: 06.03.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Annual Maintenance of Sewerage System;Cutting open BT road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
5.55
1412
7841.32
... More
Annual Maintenance of Sewerage System;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
9.13
2939
26840.37
... More
Annual Maintenance of Sewerage System;Shovel 0.85 cum 110 hp (JCB) Engaged Earth work excavation hard gravelly soils including all labour charges etc complete.
5
3557
17788.5
... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and refilling excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For 1.2x1.2 manholes).
15.73
324
5098.09
... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and refilling excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For 0.9x0.9 manholes).
48.28
324
15647.55
... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and refilling excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For 1.2x1.2 manholes).
7.94
324
2573.35
... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and refilling excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For 0.9x0.9 manholes).
3.24
324
1050.08
... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. refilling and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For pipeline trenches).
37.92
497
18876.58
... More
Annual Maintenance of Sewerage System;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
520
234
122044
... More
Annual Maintenance of Sewerage System;Lowering and Laying in Ready made trenches true to alingment and gradient jointing and testing of stoneware pipes excluding cost of Jointing material such as cement mortar and hemp yarn as directed by the department officers 300 mm dia
18
521
9385.2
... More
Annual Maintenance of Sewerage System;Lowering and Laying in Ready made trenches true to alingment and gradient jointing and testing of stoneware pipes excluding cost of Jointing material such as cement mortar and hemp yarn as directed by the department officers 200 mm dia
20
375
7512
... More
Annual Maintenance of Sewerage System;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
1
14944
14944
... More
Annual Maintenance of Sewerage System;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
525
1126
591150
... More
Annual Maintenance of Sewerage System;Construction of 1.2M X 1.2M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
1
37565
37565
... More
Annual Maintenance of Sewerage System;Construction of 1.2M X 1.2M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
168
2208
370944
... More
Annual Maintenance of Sewerage System;Manholes internal plastering 20mm thick in two coats with a bse coat of 16 mm in cm (1:6) prop. and top coat of 4 mm thick in cm(1:4) sqm including cost of all materials complete as directed by the department officers plastering in 20 mm thick (1.2x1.2)
15.71
649
10208.2
... More
Annual Maintenance of Sewerage System;Redoing of 100 mm dia SWG pipes including cost and earth work excavation andd refilling of the trenches including all labour charges etc., complete as directed by the department officers
30
298
8940
... More
Annual Maintenance of Sewerage System;Redoing of 150 mm dia SWG pipes including cost and earth work excavation andd refilling of the trenches including all labour charges etc., complete as directed by the department officers
32
398
12736
... More
Annual Maintenance of Sewerage System;Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete
30
254
7632
... More
Annual Maintenance of Sewerage System;Redoing of 20mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete
20
266
5320
... More
Annual Maintenance of Sewerage System;Benching of damaged Sewer manhole frame upto road level CC with 1:2:4 mix using 6mm to 20mm HG metal including cost and conveyance of all materials to site, machine mixing of concrete, laying in position, spreading, levelling, compacting, curing including all labour charges etc complete.as directed by the department officers
2.73
6018
16431.71
... More
Annual Maintenance of Sewerage System;Fixing of Safety grills all deep sewer manholes and water logging points duly fixing "U" Shape MS Rods using hammer including labour, incedental and operational charges etc., complete as directed by the departmental officers
30
225
6750
... More
Annual Maintenance of Sewerage System;Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
68.79
186
12859.6
... More
Annual Maintenance of Sewerage System;Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
16.12
6018
97025.31
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%