Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
270921Bid Award Id
ViewTender No
EP.No.84/CGM(E)/TC/T3/ GDWSS/O&M Div.XXI/2021-22 dt:01.10.2021Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 440V, 2.0KW, Motor Nos- 01, 04, 09, 07 & 03, AUMA make Actuators, after testing it was found Short circuited the Power card and kept in the OVen, with 75deg. hourly monitoring for 05 to 08 hours, up to IR values obtained, connected control wiring and accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials. (5Nos X 4Nos)
20
-
720000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of 3C X 120 Sq.mm, 6.6KV Heat shrinkable end termination kits from HTpanel to Capacitor panel incoming side for Motor Nos- 01, 04, 09, 07 & 03 inplace failure of end termination kits including cost and conveyance of all materials etc., complete due to submerged Electrical pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials.( 5 Nos X 1 No)
5
-
67500
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of 3C X 240 Sq.mm, 6.6KV Heat shrinkable end termination kits from Motor to Softstarter and Motor line side for Motor Nos- 01, 04, 09, 07 & 03 inplace failure of end termination kits including cost and conveyance of all materials etc., complete due to submerged Electrical pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials.( 5 Nos X 6 Nos)
30
-
454500
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 333.33KVARX 3Nos, Madhav make Bus-capacitor bank No-01, duly 3Nos of Series reactors keeping in the Oven with 75deg. hourly monitoring for 15 to 24 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure contactors, connected control wiring and including cost and conveyance of all materials etc., complete due to submerged Electrical pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials.
1
-
96000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of BEARING HOUSING, Part-0610, Model : HSC- 24WLN46, WPIL make, material of construction: CS-ASTMA216, and to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, at Mallaram PumpNo-02, and as directed by the departmental officers.
1
-
1043241
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-03, duly 3Nos of Series reactors keeping in the Oven with 75deg. hourly monitoring for 15 to 24 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure contactors, connected control wiring and including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials.
1
-
87000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of PLC for the above soft starter no-03, inplace failure of CTMR, Timer, contactors, connected control wiring and accessories for 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-03, including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
196000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-03, it was observed that IR values were zero, due to short circuited the Series reactors and connnected breaker failure duly replacing the 3Nos of new series reactors and breaker, IR values obtained to Infinity for Phase to Phase and Phase to body, removing the existing failure CTMR, Timer, contactors, connected control wiring and accessories including cost and conveyance of all materials etc., complete due to submerged Electrical pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials.
1
-
1451000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of MECHANICAL SEAL ASSEMBLY, Part-002, Model : HSC- 24WLN46, WPIL make, material of construction: FACES CARBON V/SIC, for Pumpset No-03, of both Driving & Non driving end sides and to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample at Mallaram Pumping station and as directed by the departmental officers.
1
-
340761.6
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.XLIFE-22338-E1-K-C3 and model no. J344-170229 0200 and make is FAG GERMANY for 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-03, with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
478000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-03, duly Opening the Top casing, removing the entire rotating part from the pump and removing the existing failure driving end Non driving end bearings, Mechanical seal and connected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
211000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Driving End Bearing No.6048MC3 and make is SKF/FAG/NSK for 6.6KV, 3000KW, BHEL make Motor no-03 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
213600
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.NU1048MC3, and make is SKF/FAG/NSK for 6.6KV, 3000KW, BHEL make Motor no-03 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
482000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-07, inplace failure of existing capacitors including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
3
-
153000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-07, duly 3Nos of Series reactors keeping in the Oven with 75deg. hourly monitoring for 15 to 24 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure contactors, connected control wiring and including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
87000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of PLC for the above soft starter no-07, inplace failure of CTMR, Timer, contactors, connected control wiring and accessories for 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-07 including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
196000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-07 duly 3Nos of Series reactors keeping in the Oven with 105deg. hourly monitoring for 18 to 29 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure CTMR, Timer, contactors, connected control wiring and accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
216000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of MECHANICAL SEAL ASSEMBLY, Part-002, Model : HSC- 24WLN46, WPIL make, material of construction: FACES CARBON V/SIC, for Pumpset No-07, of both Driving & Non driving end sides and to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample at Mallaram Pumping station and as directed by the departmental officers.
1
-
340761.6
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.XLIFE-22338-E1-K-C3 and model no. J344-170229 0200 and make is FAG GERMANY for 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-07, with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
478000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-07, duly Opening the Top casing, removing the entire rotating part from the pump and removing the existing failure driving end Non driving end bearings, Mechanical seal and connected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
211000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Driving End Bearing No.6048MC3 and make is SKF / FAG / NSK for 6.6KV, 3000KW, BHEL make Motor no-07 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
213600
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.NU1048MC3, and make is SKF/FAG/NSK for 6.6KV, 3000KW, BHEL make Motor no-07 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
482000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-09, inplace failure of existing capacitors including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
3
-
153000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-09, duly 3Nos of Series reactors keeping in the Oven with 75deg. hourly monitoring for 15 to 24 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure contactors, connected control wiring and including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
87000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of PLC for the above soft starter no-09, inplace failure of CTMR, Timer, contactors, connected control wiring and accessories for 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-09 including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
196000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-09, it was observed that IR values were zero, due to short circuited the Series reactors and connnected breaker failure duly replacing the 3Nos of new series reactors and breaker, IR values obtained to Infinity for Phase to Phase and Phase to body, removing the existing failure CTMR, Timer, contactors, connected control wiring and accessories including cost and conveyance of all materials etc., complete due to submerged Electrical pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials.
1
-
1451000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of MECHANICAL SEAL ASSEMBLY, Part-002, Model : HSC- 24WLN46, WPIL make, material of construction: FACES CARBON V/SIC, for Pumpset No-09, of both Driving & Non driving end sides and to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample at Bommakal Pumping station and as directed by the departmental officers.
1
-
340761.6
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.XLIFE-22338-E1-K-C3 and model no. J344-170229 0200 and make is FAG GERMANY for 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-09, with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
478000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-09, duly Opening the Top casing, removing the entire rotating part from the pump and removing the existing failure driving end Non driving end bearings, Mechanical seal and connected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
211000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Driving End Bearing No.6048MC3 and make is SKF / FAG/NSK for 6.6KV, 3000KW, BHEL make Motor no-09 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
213600
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.NU1048MC3, and make is SKF / FAG /NSK for 6.6KV, 3000KW, BHEL make Motor no-09 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
482000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW BHEL Make motor no-09 duly Stator & Rotor keeping in the Oven with 105deg. hourly monitoring for 58 to 74 hours, up to IR values increased to 50M ohms for Phase to Phase and Phase to body, removing the existing failure driving end Non driving end bearings and onnected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
661000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-04, inplace failure of existing capacitors including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
3
-
153000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-04, duly 3Nos of Series reactors keeping in the Oven with 75deg. hourly monitoring for 15 to 24 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure contactors, connected control wiring and including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods in siddipet District at Mallaram Pumping station as directed by the departmental officials.
1
-
87000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of PLC for the above soft starter no-04, inplace failure of CTMR, Timer, contactors, connected control wiring and accessories for 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-04including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
196000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-04 duly 3Nos of Series reactors keeping in the Oven with 105deg. hourly monitoring for 18 to 29 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure CTMR, Timer, contactors, connected control wiring and accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
216000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of MECHANICAL SEAL ASSEMBLY, Part-002, Model : HSC- 24WLN46, WPIL make, material of construction: FACES CARBON V/SIC, for Pumpset No-04, of both Driving & Non driving end sides and to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample at Mallaram Pumping station and as directed by the departmental officers.
1
-
340761.6
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.XLIFE-22338-E1-K-C3 and model no. J344-170229 0200 and make is FAG GERMANY for 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-04, with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
478000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-04, duly Opening the Top casing, removing the entire rotating part from the pump and removing the existing failure driving end Non driving end bearings, Mechanical seal and connected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
211000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Driving End Bearing No.6048MC3 and make is SKF / FAG / NSK for 6.6KV, 3000KW, BHEL make Motor no-04 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
213600
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.NU1048MC3, and make is SKF / FAG / NSK for 6.6KV, 3000KW, BHEL make Motor no-04 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
482000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW BHEL Make motor no-04 duly Stator & Rotor keeping in the Oven with 105deg. hourly monitoring for 58 to 74 hours, up to IR values increased to 50M ohms for Phase to Phase and Phase to body, removing the existing failure driving end Non driving end bearings and onnected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
661000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 300KVARX 3Nos, Madhav make Individual capacitor bank No-02 duly 3Nos of Series reactors keeping in the Oven with 75deg. hourly monitoring for 15 to 24 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure contactors, connected control wiring and including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
87000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, Transportation, erection and commissioing of PLC for the above sosft starter -01 inplace failure of CTMR, Timer, contactors, connected control wiring and accessories for 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-02 including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
196000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, HFSR, Jaysree make Soft starter No-01 duly 3Nos of Series reactors keeping in the Oven with 105deg. hourly monitoring for 18 to 29 hours, up to IR values increased to 300M ohms for Phase to Phase and Phase to body, removing the existing failure CTMR, Timer, contactors, connected control wiring and accessories including cost and conveyance of all materials etc., complete due to submerged Electrical pump sets with heavy floods at Mallaram Pumping in siddipet District as directed by the departmental officials.
1
-
216000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of MECHANICAL SEAL ASSEMBLY, Part-002, Model : HSC- 24WLN46, WPIL make, material of construction: FACES CARBON V/SIC, for pumpset no-01, of both Driving & Non driving end sides and to suit the existing system including cost of material, labour charges for loading and unloading, transportation to work site, as per the old sample at Mallaram Pumping station and as directed by the departmental officers.
1
-
340761.6
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.XLIFE-22338-E1-K-C3 and model no. J344-170229 0200 and make is FAG GERMANY for 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset no-01, with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
478000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW, WPIL make, Horizontal centrifugal pumpset No-01, duly Opening the Top casing, removing the entire rotating part from the pump and removing the existing failure driving end Non driving end bearings, Mechanical seal and connected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District station as directed by the departmental officials.
1
-
211000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Driving End Bearing No.6048MC3 and make is SKF/FAG/NSK for 6.6KV, 3000KW, BHEL make Motor no-01,with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
1
-
213600
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Supply, delivery, transportation and erection of Non-Driving End & Driving End Bearing No.NU1048MC3, and make is SKF/FAG/NSK for 6.6KV, 3000KW, BHEL make Motor no-01 with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station as directed by the departmental officials.
2
-
482000
Dismantling, loading, transportation, unloading at service centre, refurbishment 3 Nos motors and re;Dismantling, loading, transportation, unloading at service centre, refurbishment of 6.6KV, 3000KW BHEL Make motor no-01 duly Stator & Rotor keeping in the Oven with 105deg. hourly monitoring for 58 to 74 hours, up to IR values increased to 50M ohms for Phase to Phase and Phase to body, removing the existing failure driving end Non driving end bearings and connected accessories including cost and conveyance of all materials etc., complete due to submerged Electrcal pump sets with heavy floods at Mallaram Pumping station in siddipet District as directed by the departmental officials.
1
-
661000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements