Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date10 Feb 2025
Closing Soon17 Feb 2025
Tender Amount₹ 13,57,043
Costs
EMD
₹ 13,570Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
575005Tender No
EP- 199/CGM(E)/O and M Circle-IV/2024-25,Dtd: 10.02.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Annual Maintenance of Sewerage System;Bosch GOL 32D 32x Optical Level kit with Indian Make tripod and levelling staff as per standard specification for levelling of work (Prices obtained from Amazon online market)
1
18900
18900
... More
Annual Maintenance of Sewerage System;FREEmans 10 Km foldable measuring Wheel/Roadometer with high traction PU tire and soft Grop Bi-material Handle/30cm/12-inch ABS Wheel/Foldable handle for easy storage and carry bag (Prices obtained from Amazon online market)
1
2799
2799
... More
Annual Maintenance of Sewerage System;Engaging labour for loading, unloading of FRC Frame and covers at store and complete as directed by the department officers.
42
805
33810
... More
Annual Maintenance of Sewerage System;Transportation of FRC Frames and Covers from departmental store to work site using tractor
8
3720
29760
... More
Annual Maintenance of Sewerage System;Benching of damaged Sewer manhole frame upto road level CC with 1:2:4 mix using 6mm to 20mm HG metal including cost and conveyance of all materials to site, machine mixing of concrete, laying in position, spreading, levelling, compacting, curing including all labour charges etc complete.as directed by the department officers.
25.28
6018
152158.8
... More
Annual Maintenance of Sewerage System;Conveyance of 200 mm dia SWG pipes from stores to site
15
20
303
... More
Annual Maintenance of Sewerage System;Conveyance of 200 mm dia SWG pipes from stores to site
30
20
606
... More
Annual Maintenance of Sewerage System;Conveyance of 300 mm dia SWG pipes from stores to site
25
20
505
... More
Annual Maintenance of Sewerage System;Manholes Internal plastering 20mm thick in two coats with a bse coat of 16 mm in CM (1:6) prop. And top coat of 4 mm thick in CM(1:4) sqm including cost of all materials complete as directed by the department officers.
131.94
649
85732.68
... More
Annual Maintenance of Sewerage System;Construction of additional 0.1m depth of 1.20x1.20M diameter sewer with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers.
7
2208
15456
... More
Annual Maintenance of Sewerage System;Construction of additional 0.1m depth of 0.90x0.90M diameter sewer with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers.
420
1126
472920
... More
Annual Maintenance of Sewerage System;Construction of 0.90x0.90 mts internal diameter sewer manhole minimum depth 1.00 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers
6
14944
89664
... More
Annual Maintenance of Sewerage System;Construction of 1.20x1.20 mts internal diameter sewer manhole minimum depth 1.80 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers
1
37565
37565
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 200mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
15
375
5634
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 250mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
25
467
11695
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 300mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
25
521
13035
... More
Annual Maintenance of Sewerage System;Dewatering pipeline trenches duly bailing out water with 5 hp engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete.
16
417
6672.32
... More
Annual Maintenance of Sewerage System;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
250
234
58675
... More
Annual Maintenance of Sewerage System;Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means, For Man holes
122.54
324
39715.21
... More
Annual Maintenance of Sewerage System;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. (For pipeline trenches where depth is more than 1.5 times the width)..For pipe line trenches
72.6
497
36140.28
... More
Annual Maintenance of Sewerage System;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges , tools and plants etc complete for pipeline trenches.
43.81
2939
128792.64
... More
Annual Maintenance of Sewerage System;Cutting of BT road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete. For Manholes.as directed by the department officers.
0.92
1412
1299.82
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%