Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Pipe Line Project
Water Storage And Supply
Opening Date6 Feb 2025
Closing Date12 Feb 2025
Tender Amount₹ 2,13,199
Costs
EMD
₹ 2,132Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574468Tender No
EP- 167/CGM(E)/O and M Circle-IV/2024-25,Dtd: 06.02.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
3
6752
20257.2
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Jointing of 100mm dia CI/DI K-7 pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
2
334
668.6
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Jointing of 150mm dia CI/DI K-7 pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
6
493
2959.8
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Labour charges for lowering and keeping in position 100 mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
255
510.6
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Labour charges for lowering and keeping in position 150 mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
432
432.7
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Jointing of 100 mm dia DI pipes with s/s ends with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
64
178
11417.6
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Lowering the 100mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
100
64
6460
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Cutting of 100mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
147
294.8
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
276
552.8
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
90
234
21123
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers. (excluding bailing of water)
6.55
3534
23138.87
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
58.93
497
29334.11
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers. For 300mm dia.
24.98
2939
73421.51
... More
Laying of 100mm dia DI Water supply line from Rock Castle Apartment;Conveyance of 100mm dia DI pipes from departmental stores of HMWSSB to work site including transportation loading, unloading and stacking etc., all labour incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
90
3
309.6