Hyderabad Metropolitan Water Supply And Sewerage Board Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Civil And Construction
Pipe Line Project
Opening Date6 Jan 2022
Closing Date13 Jan 2022
Tender Amount₹ 96,54,837 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SLN developers;Carting of surplus excavated materials from site including labour charges for loading, unloading and transportation etc ,complete. As directed by departmental officers.

1375.05

-

215057.82

... More
SLN developers;Refilling the pipe line trenches with excavated earth other than sand including watering tampering and ramming etc. complete as directed by the departmantal officers.

2263.8

-

520424.98

... More
SLN developers;Supply and delivery and fixing of encapsulated plastic steps for man holes including cost and convance charge loading, transportation, unloading and stacking at site of work etc, complete.

144

-

31968

... More
SLN developers;Supply, delivery and fixing of HD-35with 560 mm dia clear opening FRC manhole cover and frame with ISI including cost of materil and labour charges etc. complete.

24

-

82221.84

... More
SLN developers;Construction of 1200 mm Dia Circular conical sewer manhole with RCC M30 concrete Barrel wall and HYSD Bars Including CC Bed (1:4:8) prop using 40mm gauge HG Metal and CC (1:2:4)Prop benching channeling, internal plastering with 12mm thick CM (1:2)PROP SRC and External plastering 12mm thick with CM( 1:2) PROP with fine rendering and including fixing of Encapslated steps and FRC Cover and frame including cost and conveyance all material at site complete as per specification as directed by departmental officer B)Contruction of connical RCC sewer Manhole of 1200 mm dia on 600 mm dia RCC pipe line depth 1.5mt

7

-

528431.68

... More
SLN developers;Construction of 1500 mm Dia Circular conical sewer manhole with cement bricks Barrel in CM (1:2) Prop and Carbelling in CM (1:2) Prop Including CC Bed (1:4:8) prop using 40mm gauge HG Metal and CC (1:2:4)Prop benching channeling,internal plastering with 12mm thick CM (1:2)PROP SRC and External plastering 12mm thick with CM( 1:2) PROP with fine rendering and including fixing of Encapslated steps and FRC Cover and frame including cost and conveyance all material at site complete as per specification as directed by departmental officer and including cost and fixing of safety Grill.A)1500MM Dia circular sewer manhole on 450 mm Dia RCC pipe, 1) 5 to 6 M depth B)1500MM Dia circular sewer manhole on 600 mm Dia RCC pipe,1) 5 to 6 M depth

4

-

635371.76

... More
SLN developers;Construction of 1500 mm Dia Circular conical sewer manhole with cement bricks Barrel in CM (1:2) Prop and Carbelling in CM (1:2) Prop Including CC Bed (1:4:8) prop using 40mm gauge HG Metal and CC (1:2:4)Prop benching channeling,internal plastering with 12mm thick CM (1:2)PROP SRC and External plastering 12mm thick with CM( 1:2) PROP with fine rendering and including fixing of Encapslated steps and FRC Cover and frame including cost and conveyance all material at site complete as per specification as directed by departmental officer and including cost and fixing of safety Grill.A)1500MM Dia circular sewer manhole on 450 mm Dia RCC pipe, 1) 5 to 6 M depth

4

-

633158.96

... More
SLN developers;Construction of 1200 mm Dia Circular conical sewer manhole with cement bricks Barrel in CM (1:2) Prop and Carbelling in CM (1:2) Prop Including CC Bed (1:4:8) prop using 40mm gauge HG Metal and CC (1:2:4)Prop benching channeling,internal plastering with 12mm thick CM (1:2)PROP SRC and External plastering 12mm thick with CM( 1:2) PROP with fine rendering and including fixing of Encapslated steps and FRC Cover and frame including cost and conveyance all material at site complete as per specification as directed by departmental officer and including cost and fixing of sefety Grill.B)1200MM Dia circular sewer manhole on 600 mm Dia RCC pipe, 3) 3 to 4 M depth

11

-

977912.1

... More
SLN developers;Construction of 1200 mm Dia Circular conical sewer manhole with cement bricks Barrel in CM (1:2) Prop and Carbelling in CM (1:2) Prop Including CC Bed (1:4:8) prop using 40mm gauge HG Metal and CC (1:2:4)Prop benching channeling,internal plastering with 12mm thick CM (1:2)PROP SRC and External plastering 12mm thick with CM( 1:2) PROP with fine rendering and including fixing of Encapslated steps and FRC Cover and frame including cost and conveyance all material at site complete as per specification as directed by departmental officer and including cost and fixing of sefety Grill.B)1200MM Dia circular sewer manhole on 600 mm Dia RCC pipe, 2) 2 to 3 M depth

4

-

235206.88

... More
SLN developers;Construction of 1200 mm Dia Circular conical sewer manhole with cement bricks Barrel in CM (1:2) Prop and Carbelling in CM (1:2) Prop Including CC Bed (1:4:8) prop using 40mm gauge HG Metal and CC (1:2:4)Prop benching channeling,internal plastering with 12mm thick CM (1:2)PROP SRC and External plastering 12mm thick with CM( 1:2) PROP with fine rendering and including fixing of Encapslated steps and FRC Cover and frame including cost and conveyance all material at site complete as per specification as directed by departmental officer and including cost and fixing of sefety Grill.B)1200MM Dia circular sewer manhole on 600 mm Dia RCC pipe, 1) 0to 2 M depth

5

-

179506.65

... More
SLN developers;Manufacturing delivery, lowering ,laying ,jointing and testing of 600 mm dia RCC NP 4 class pipes conforming to I S 458 -2003 using sulphate resistance cement with in lining 8 mm thick high aluminia cement in standard langth and socket and spigot ends suitable rubber rings including cost conveyance of all material and lowering in readymade trenches true to alignment and gradiant including labour charges incidental and operational charges. etc, complete.

680

-

3354508

... More
SLN developers;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.

808.5

-

530254.07

... More
SLN developers;Providing bedding for pipes with M15 Grade Cement Concrete using 6mm to 20mm guage hard granite machine Crushed metal including cost and conveyance of all materials to site, including machine mixing of concrete all lifts, leads, delifts, centering, laying in position, vibrating , conpacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per detailed drawings and or directions of departmental officers.

16.88

-

97874.12

... More
SLN developers;Collection ,Supply and filling of HB Stone dust 2.36 mm chips from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

136.13

-

80888.45

... More
SLN developers;Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper etc, complete,40 days x 10 Hp x 8 Hours

320

-

169104

... More
SLN developers;Barricading hoaring lighting and watching etc. For water supply and sewerage works for trenches including cost of material labour charges etc, complete, as directed by departmental officer.

680

-

113084

... More
SLN developers;Excavation in Hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting can not be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/ Water supply lines / Foundations including all incidental and operational charges etc., complete.

808.5

-

2974471.5

... More
SLN developers;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete.a)For pipe line trench

3234

-

680627.64

... More
SLN developers;Cutting open BT road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

122.4

-

177626.88



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.