Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date10 Feb 2025
Closing Soon17 Feb 2025
Tender Amount₹ 19,83,281
Costs
EMD
₹ 19,833Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574930Tender No
EP- 189/CGM(E)/O and M Circle-IV/2024-25,Dtd: 10.02.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Annual Maintenance of Sewerage System;CC Road restoration M30 (1:0.75:1.50) Grade mix with 6mm to 20mm guage hard granite machine crushed metal including cost and conveyance of all material site, machine mixing of concrete, lifts, leads, from work laying in position, vibrating, compacting, curing, all labour charges, tools and plaints and all other incidental and operational charges etc. complete as directed by departmental officers.
19.28
7798
150346.02
... More
Annual Maintenance of Sewerage System;Providing, Laying, spreading and compacting graded stone aggregrate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug mill) carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN / Vibratory Roller 80-100KN weight to achieve the desired density including lighting, barricading and maintenance of diversion etc.,as per Tables 400.11 & 400.12 and Technical specification clause 406 MORD/MORTH
5.8
1978
11472.98
... More
Annual Maintenance of Sewerage System;Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
5.8
644
3738.68
... More
Annual Maintenance of Sewerage System;Gravel filling and water ramming including the cost of conveyance of all materials and labour charges.
11.9
714
8506.12
... More
Annual Maintenance of Sewerage System;Conveyance of 300/200 mm dia SWG Pipes from stores site
12
20
242.4
... More
Annual Maintenance of Sewerage System;Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 150 mm dia SWG pipes and including lowering laying and jointing in CM (1:5:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
43.2
398
17193.6
... More
Annual Maintenance of Sewerage System;Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:5:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
32.4
298
9655.2
... More
Annual Maintenance of Sewerage System;Fixing of safety grills all deep sewer manholes and water logging points duly fixing "U" shape MS rods using by hammer including labour, incidental and operational charges etc.,complete as directed by the departmental officers
60
225
13500
... More
Annual Maintenance of Sewerage System;Manholes Internal plastering 20mm thick in two coats with a bse coat of 16 mm in CM (1:6) prop. And top coat of 4 mm thick in CM(1:4) sqm including cost of all materials complete as directed by the department officers.
79.2
649
51463.37
... More
Annual Maintenance of Sewerage System;Construction of additional 0.1m depth of 1.20x1.20M diameter sewer with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers.
89.5
2208
197616
... More
Annual Maintenance of Sewerage System;Construction of additional 0.1m depth of 0.90x0.90M diameter sewer with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers.
529
1126
595654
... More
Annual Maintenance of Sewerage System;Construction of 0.90x0.90 mts internal diameter sewer manhole minimum depth 1.00 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers
10
14944
149440
... More
Annual Maintenance of Sewerage System;Construction of 1.20x1.20 mts internal diameter sewer manhole minimum depth 1.80 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers
7
37565
262955
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 200mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
6
375
2253.6
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 300mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
6
521
3128.4
... More
Annual Maintenance of Sewerage System;Dewatering pipeline trenches duly bailing out water with 5 hp engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete.
120
417
50042.4
... More
Annual Maintenance of Sewerage System;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
744
234
174616.8
... More
Annual Maintenance of Sewerage System;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. (For pipeline trenches where depth is more than 1.5 times the width)..For pipe line trenches
13.5
497
6720.3
... More
Annual Maintenance of Sewerage System;Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means, For Man holes
98.25
324
31842.21
... More
Annual Maintenance of Sewerage System;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges , tools and plants etc complete for pipeline trenches.
46.47
2939
136612.51
... More
Annual Maintenance of Sewerage System;Cutting of BT road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete. For Manholes.as directed by the department officers.
11.56
1412
16332.55
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%