Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date22 Nov 2024
Closing Date25 Nov 2024
Tender Amount₹ 16,55,009
Costs
EMD
₹ 16,550Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
558116Tender No
EP-178/CGM(E)/O&MC-II/2024-25, dt:22.11.2024 (Short Tender)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Supply, delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads labour charges and other incidential and operatinal charges etc. complete as directed by departmental officers.
26.4
644
17017.44
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel,stacking, levelling,watering,tamping rolling,all leads,labour charges and other incidental and operatinal charges etc. complete as directed by departmental officers.
73.57
714
52587.84
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Redoing of 3/4 "PPC connections for domestic water supply connection including earth work excavation, cost of MDPE pipes, refilling etc. complete as directed by the deptl. Officers.
35
266
9310
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Redoing of 1/2 "PPC connections for domestic water supply connection including earth work excavation, cost of MDPE pipes, refilling etc. complete as directed by the deptl. Officers.
35
254
8904
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Uprooting and Re-doing 150 mm dia SWG pipeline/Rmt including earth work(TBSP-A.I.02)
35
398
13930
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Redoing domestic sewer line connection including EWE in all available soils and including supply delivery of 101.6mm dia SWG pipes and including lowering laying and jointing in CM (1.5:1) prop. etc. complete upto 5' depth and refilling watering and tampering.
35
298
10430
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Construction of 1.20 mtrs internol diameter sewer manhole minimum depth 1.80 mtrs with cement bricks in CM 1:4 prop. with CC bed 1:4 prop with CC bed 1:3:6 prop. Benching and channel finished with cc 1:2:4 prop. Internal plastering 20mm thick in and external plastering 12 mm thick using CM 1:3 prop.
7
37565
262955
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Construction of 0.90 X 0.90 M diameter sewer manhole for additional depth of 0.10M with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames
45.2
1126
50895.2
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Construction of 0.9x0.90M diameter sewer manhole upto 1M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop, including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames.
27
14944
403488
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Lowering and laying in readymade trench true to alignment and gadient, jointing and testingn of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hem yarn but excluding cost and conveyance of pipe (reference to specifications BIS No.6530/72) 200mm dia
220
375
82632
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Excavation in Hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and bouldes in habitant areas where controlled blasting can not be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structuers, existing water suppl lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., whereever it is possible as not to disturb the existing utility services etc, taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removal of stumps and other deleterious material and disposal upto 1 lead of 50m, dressing of sides and bottom and excluding backfilling for pipeline trenches by laying sewer/water supply lines/Foundations including all incidental and operational charges etc., complete.
73.57
3534
259996.38
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Earth workexcavation in Loamy and clayey soils red earth and ordinary gravel hard gravelly slils soft disintegrated rock etc. as directed by the deptl. officers including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering. (upto 3.0mtr depth below ground level).Where depth is less than 11/2 times with with Manual Means For Manholes
53.52
324
17345.83
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Earthwork excavation and depositing on the bank in all types of solils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock, hard disintegrated rock, conglomerated rock, sotney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officerrs, including protecting the walls and other structures, existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic, removal of stumps and other deleteriouis material and disposal upto a lead of 50m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying water supply/sewer lines including all incidental and operaional charges etc. complete. Manual Means
171.65
497
85447.37
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Barricading, hoarding, lighting and watching etc.for water supply and sewerage works trenches including cost of material labour etc. complete as directed by the deptl. Officers.
220
234
51634
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Cutting open CC Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete for pipe line trenches.
26.4
2939
77610.72
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Cutting open B.T. Road surface including labour charges all leads, lifts and conveyance of all materials etc. complete as directed by the departmental officers for pipeline trenches.
26.4
1412
37299.24
Laying of 200mm dia SWG sewer line in place of damaged 200mm dia sewer line;Conveyance complete of stone ware pipes from departmental stores of HMWSSB to site of work including loadingn and stacking etc., and all labour incidental and operational charges etc. complete .
220
20
4444