Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 6,359Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
577403Tender No
EP- 211 (2nd Call)/CGM(E)/O and M Circle-IV/2024-25,Dtd: 22.02.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Annual Maintenance of Sewerage System;Cutting open BT road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
17.77
1412
25106.34
... More
Annual Maintenance of Sewerage System;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
17.77
2939
52240.25
... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For pipeline trenches).
16
497
7964.8
... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For manholes trenches).
21.37
324
6926.02
... More
Annual Maintenance of Sewerage System;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
92
234
21592.4
... More
Annual Maintenance of Sewerage System;Lowering and Laying in Ready made trenches true to alingment and gradient jointing and testing of stoneware pipes excluding cost of Jointing material such as cement mortar and hemp yarn as directed by the department officers 300 mm dia
20
521
10428
... More
Annual Maintenance of Sewerage System;Labour Charges for fixing of FRC manhole cover its include man & material and exclude the cost of frame and cover as directed by the department officers
25
358
8957.75
... More
Annual Maintenance of Sewerage System;Construction of 1.2M X 1.2M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
1
37565
37565
... More
Annual Maintenance of Sewerage System;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
2
14944
29888
... More
Annual Maintenance of Sewerage System;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
146
1126
164396
... More
Annual Maintenance of Sewerage System;Construction of 1.2M X 1.2M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
40
2208
88320
... More
Annual Maintenance of Sewerage System;Manholes internal plastering 20mm thick in two coats with a bse coat of 16 mm in cm (1:6) prop. and top coat of 4 mm thick in cm(1:4) sqm including cost of all materials complete as directed by the department officers plastering in 20 mm thick (1.2x1.2)
30.66
649
19922.56
... More
Annual Maintenance of Sewerage System;Redoing of 100 mm dia SWG pipes including cost and earth work excavation andd refilling of the trenches including all labour charges etc., complete as directed by the department officers
3
298
894
... More
Annual Maintenance of Sewerage System;Redoing of 150 mm dia SWG pipes including cost and earth work excavation andd refilling of the trenches including all labour charges etc., complete as directed by the department officers
3
398
1194
... More
Annual Maintenance of Sewerage System;Benching of damaged Sewer manhole frame upto road level CC with 1:2:4 mix using 6mm to 20mm HG metal including cost and conveyance of all materials to site, machine mixing of concrete, laying in position, spreading, levelling, compacting, curing including all labour charges etc complete.as directed by the department officers
6.8
6018
40958.89
... More
Annual Maintenance of Sewerage System;Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
8.89
644
5730.49
... More
Annual Maintenance of Sewerage System;Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
8.89
6018
53508.38
... More
Annual Maintenance of Sewerage System;Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
18.42
186
3443.43
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements