Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
513977Bid Award Id
ViewTender No
EP.No.11/CGM(E)/O&M Circle-V/O&M Divn-X(A)/2024-25, Dt:18.05.2024Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Shifting of DI Water Supply line;Conveyance of CI/DI pipes and specials from departmental stores of HMWSSB to site of wok including loading and stacking etc. all labour charges incidental and operational charges etc. complete.For 200mm dia
90
4
381.6
... More
Shifting of DI Water Supply line;Carting away surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidental and operational charges etc. complete.
40.66
182
7402.97
... More
Shifting of DI Water Supply line;Supply, delivery and fixing of RCC precast manhole chamber having the size of 36" at bottom tapering to 21 " dia at top fixing in CC (1:4:8) Prop along with FRC cover HD - 20 and frame laying CC Design mix M-30 prop: including cost of materials labour charges earth work curing conveyance etc. complete as directed by the HMWS&SB Engineers.
3
6680
20040
... More
Shifting of DI Water Supply line;For 100mm dia
2
307
615.4
... More
Shifting of DI Water Supply line;For 150mm dia
2
455
910.6
... More
Shifting of DI Water Supply line;Jointing CI/DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. For 200mm dia
2
500
1000.6
... More
Shifting of DI Water Supply line;For 100mm dia
1
229
229.2
... More
Shifting of DI Water Supply line;For 150mm dia
1
388
388.5
... More
Shifting of DI Water Supply line;Labour charges for Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces For 200mm dia
1
641
641
... More
Shifting of DI Water Supply line;For 100mm dia
1
132
132.6
... More
Shifting of DI Water Supply line;For 150mm dia
1
248
248.8
... More
Shifting of DI Water Supply line;Cutting C.I. / D.I. pipes without water in mains but including cost of implement and all labour charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 200mm dia
3
331
994.2
... More
Shifting of DI Water Supply line;For 250mm dia
2
249
498.8
... More
Shifting of DI Water Supply line;For 100mm dia
34
163
5559
... More
Shifting of DI Water Supply line;For 150mm dia
8
200
1600
... More
Shifting of DI Water Supply line;Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc. complete, as directed by the H.M.W.S.&.S. Board Engineers. For 200mm dia
21
219
4615.8
... More
Shifting of DI Water Supply line;For 100mm dia
180
58
10476
... More
Shifting of DI Water Supply line;For 150mm dia
30
94
2844
... More
Shifting of DI Water Supply line;Lowering CI/DI Pipes, A class and specials with s/s ends carefully into trench and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply. For 200mm dia
90
137
12411
... More
Shifting of DI Water Supply line;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers .
600
217
130440
... More
Shifting of DI Water Supply line;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. For Pipelines by manual means
282.42
450
127145.48
... More
Shifting of DI Water Supply line;Cutting open CC Road with including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.
35.3
2940
103782
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements