Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Civil And Construction
Civil Works Others
Opening Date27 Jun 2023
Closing Date4 Jul 2023
Tender Amount₹ 1,92,36,695 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting with epoxy paints of approved brand in two coats over a coat of primer grade including thorough scrapping, removal of dirt etc complete including cost and conveyance of all materials to worksite charges and all operational ,labour charges etc complete.

1000

208

208000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Providing and applying synthetic plaster of paris putty or lime punning of average 1 to 2mm thicness over plastered surface to prepare the surface even and smooth afetr thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to worksite , scaffolding,curing charges and all operational ,incidental, labour charges etc complete for finished item of work for internal walls

500

268

134000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting external walls with two coats of water proof cement paint of approved brand and shade over a base coat of appropriate primer of approved brand,making three coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to worksite , scaffolding,curing charges and all operational ,incidental, labour charges etc complete for finished item of work

1000

267

267000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting internal walls and ceiling with two coats of ready mixed oil bound washable distemper Grade-I quality of approved brand and shade over a base coat of appropriate primer of approved brand,making three coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to worksite , scaffolding,curing charges and all operational ,incidental, labour charges etc complete for finished item of work

1000

145

145000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Plastering 20 mm thick in two coats with CM(1:4) prop; 16mm thick for 1st coat and with CM(1:3) prop., with manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 ( As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018)4mm thick for 2nd coat to table drain use manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 ( As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018) with sponge finishing including cost and conveyance of all materials, labour charges, leads, lifts, curing, scaffolding charges and all other incidental and operational charges etc., complete for finished item of work.

200

595

119008

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Plain Cement Concrete PCC (1:4:8) prop; using 20mm guage hard granite machine crushed metal including cost and conveyance of all materials to site coarse and fine agregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018,the Government have directed all the Engineering works Departments to useManufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 in all the mixes of Cement concrete and in the items of works), centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc.,

15

5032

75492

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Engaging labour for Scavenger for maintenance and cleaning of wash rooms (4 Nos) including all labour charges etc complete(1 year)

500

490

245000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery and fixing of M.S Angles of 65 x65 x5 mm size including supply and delivery of MS flats of size 25x5mm, 3 nos for each M.S angle duly drilling three holes to MS angles and three holes to each flat complete including all operational and incidental charges etc. complete as directed by the departmental officers..

200

2750

550000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply , delivery of G.I chain link mesh of 8 guage (4mm ) 2?x2? size including cost and conveyance of all materials, labour charges complete including all operational and incidental charges etc. complete as directed by the departmental officers. rate as per SSR 2022-23 TBSC-E.II-08

1200

796

955728

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply of 20mm PPR Ball Valve conforming to DIN Standards 8077/8092. SSR 21-22 P No.248 SL No.861

24

186

4464

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply of 20mm X 1/2" PPR Male Threaded Union conforming to DIN Standards 8077/8092. SSR 21-22 P No 231 SL No.412

24

534

12816

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;S&F Premium make CPVC pipes of 22.20mm OD pipe-SDR 13.50 including cost and conveyance charges etc complete. SSR 21-22 P.No.242 SL No.686

200

193

38600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply and delivery of Spun yarn including cost of material and conveyance charges etc

160

130

20800

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Servicing overhauling to the shaftgrooves (both sides) applying the black kadmian compound to the wire ropes and oiling to all the parts as per provisions made at site duly cleaning wire ropes by using white kerosene coir brushes caton waste etc and taking all precautionary measures to work on Dam Flood Gates by using safety belts ropes helmets and other safety materials including wages for skilled and unskilled workers all incidental and operational charges etc complete as directed by the H.M.W.S.S.B.Engineers.

34

15000

510000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery of Lubricant Oil of Good quality including cost and conveyance, transportation charges etc. complete.(Flood Gates)

204

270

55080

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery of Kardium Compound Lubricant of Standard quality including cost and conveyance, taxes, duties, transportation charges etc. complete.

340

300

102000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery of Grease of ISO Standard quality including cost and conveyance, transportation charges etc. complete.

660

290

191400

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery of White Kerosine including cost and conveyance, transportation charges etc. complete.

408

100

40800

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery of Cotton Waste of Good quality including cost and conveyance,transportation charges etc. complete (Flood Gates)

272

180

48960

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;herbicide for arresting weed growth on Masonry structures(Max & Alloy)

12

1000

12000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;soaps

12

50

600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;mops

6

150

900

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;freshners

12

50

600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Lizol

6

150

900

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Phenyl

6

100

600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Acid bottles for cleaning of toilets

6

100

600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Axes

20

300

6000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;sickle

20

250

5000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Bleaching powder

500

50

25000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;ropes

8

100

800

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;wire brushes

20

100

2000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Buckets for cleaning of forebay

15

150

2250

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Soft brooms

25

150

3750

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Coconut brooms

400

50

20000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply and delivery of cleaning materials for gardening and maintenance of premises at Himayath sagar premises including all incidental and operational charges, transportation to site etc complete finished item (Rate as per lowest quotation)

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Carting of wet silt & sludge to a distance 5km away from site including loading, unloading and Transportation etc, complete.

494.14

156

77283.5

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Removal of wet silt and sludge from forebay chambers and connecting vents

494.14

232

114640.48

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Preparationery works for taking shut down like Operating the Scour Valves for dewatering before starting the shut down and closing the same after completion of the work with 15feet long heavy weight Operting key rod and checking of Air valves during commissioning of line etc. including hire charges for Vehicle for transportation of Men and Materials, including all incidental and operational charges etc. complete as directed by he H.M.W.S.S.B.Engineers.

6

13311

79866

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Cutting and removing of existing RCC pipeline including hire charges for Men, Vehicle for transportation of Materials, including all incidental and operational charges etc. complete as directed by departmental officers. (For 1650 dia RCC pipe line)

6

21402

128412

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Jointing of 1920mm dia M.S.Socket of 0.25m length inbetween M.S.Socket and R.C.C.Pipe by using Spun Yarn , Cement Mortor duly mixing of Hardcrette solution for quick setting and leakproof by engaging experienced Fitters and Helpers, including cost of of all jointing materials, such as Cement, Sand, Spun Yarn,Hardcrette solution, Wages for Fitters and Helpers, all incidental and operational charges, duly taking all prercautionery measures to work on Trunk mains in deep cut trenches etc. complete as directed by the the H.M.W.S.S.BEngineeers.

6

18312

109872

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hoisting and keeping of 1920mm dia Machine Ends/Sockets to suit 1650mm R.C.C.Pipe on either side of M.S.Pipes in ready made trenches true to alignment and gradient by using Crane and keeping them in position carefully and fixing in perfect Lining by using Jacks, inserting the (2)nos of Plaint Sockets/ Machine ends over R.C.C.Pipes on both ends and welding in 3Run Arc Welding with ISO Electrodes from inside and out side duly making a manhole to to 1650mm dia M.S.Pipe to enter inside the pipe for welding from inside and same is to be closed after completeion welding from inside the Pipe by providing suaitable stiffners to the Manhole cover etc, by engaging experienced Welders and Helpers, including cost of all jointing materials, such as Electrodes,Hire charges for Gass cutting equipment , Welding transformers, including wages for Welders and helpers,but excluding Hirecharges of Crane, all incidental and operational charges,duly taking all prercautionery measures to work in deep cut trenches for Trunk mains etc. as directed by the the H.M.W.S.S.B.Engineeers.

6

21415

128490

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire charges for 50 KVA Diesel Generator for Dewatering, Field welding,and lighting purpose including Hire charges, cost of fuel, Wages for operator, transportation charges from yard to work site ,all incidental and operational charges etc., complete. as directed by the H.M.W.S.S.B. Engineers.

120

1895

227448

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire charges for engaging Tower crane of 5 Ton for loading unloading purpose and hoisting and keeping of M.S.Split coller in ready made trench including wages for operator and helper and cost of fuel for machinery and transportation charges from yard to work site and all other incidental and operational charges etc., complete as directed by the H.M.W.S.S.B. Engineers.

72

1384

99712.8

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire charges for dewatering Pump set of 10HP Electrical Pump for dewatering from the pipeline trenches with the help of Electrical Engine Driven pump sets including hire charges, crew charges ,hose pipe for suction delivery to a suitable distance etc. including all incidental and operational charges etc. complete.as directed by the H.M.W.S.S.B. Engineers.

128

218

27980.8

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire charges for dewatering Pump set of 5HP Electrical Pump for dewatering from the pipeline trenches with the help of Electrical Engine Driven pump sets including hire charges, crew charges ,hose pipe for suction delivery to a suitable distance etc. including all incidental and operational charges etc. complete.as directed by the H.M.W.S.S.B. Engineers.

352

165

58291.2

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacturing,Supply and Delivery of Socket Machine Ends of size 1920mm dia 0.25m length to suit 1680mm Internal dia R.C.C.Pipe made with 10mm thick M.S.Plate including cost and conveyance of M.S.PLate,cutting, Welding, Fabrication, Paiting ,Transportation, loading, unloading etc. all incidental and operational charges etc. complete. as directed by the H.M.W.S.S.B.Engineers.( For 1650 dia RCC pipe line)

2

58870

117740

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture and Supply 1650mm dia of the following dia Mild Steel pipes using 10mm thick MS plate conforming to IS 2062- 1992 grade A, manufactured as per IS-3589- 2001 in suitable lengths to suit the site conditions, as directed by the departmental officers including testing at factory for a test pressure of 15 Kg/sqcm., including two coats of epoxy painting of approved make including cost of mild steel plates, epoxy paint, welding rods and other required materials and inclusive of all taxes, and duties and delivery of fabricated pipes to site, loading, unloading and hoisting carefully, lowering the pipes in to ready made trenches or keeping in position on ready built pedestals or supports and laying them true to alingment and gradient and perfect lining by jacking and jointing with three run arc welding and Epoxy Paint as per the above specification inclusive of cost of the jointing materials inclusive of the cost of the necessary testing equipment and other incidental and operational charges etc., complete.

20

48445

968900

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire charges for Engaging Air compressor of 7Cmm (Diesel) Breaker for breaking C.C.Thrust block including cost of Oil, Diesel,Operator,all incidental and operational charges etc complete as directed by the H.M.W.S.S.B.Engineers.

96

1746

167644.8

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Skilled

450

812

365400

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Unskilled

1080

728

786240

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Engaging labour for removing and cleaning of jungle trees and bushes and carting the waste materials to a suitable distance including all incidental charges etc complete as directed. Unskilled labour (rate as per SSR 2021-22) adding 40% extra for municipal limits.

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Engaging Hydraulic excavator of showel 0.50cum 75hp for Earth work excavation ,Refilling the trenches,including cost of Oil, Diesel, Operator, Helper,all incidental and operational charges etc complete as directed by the H.M.W.S.S.B. Engineers.

800

2117

1693920

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture supply , Delivery and fixing of RCC pre cast rectangular covers of different sizes on the rain water out let channel in place of damaged old dilapidated RCC covers by employing safe methods including the cost of centering, shuttering, reinforcement, curing, patch work plastering to covers etc complete including all the labour charges, sundries, machinery, tools and plants, cost and conveyance of materials.etc complete as directed by the departmental officers

20

2000

40000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture , Supply , delivery and fixing of Aluminum chequered plate covers on filtered water outlet chambers by duly making with outer frame of SS angles of 35x35 x 4mm thick and fixing the aluminum chequred plate of 4mm thick of size 48" x50" over the inner frame made up of 35x35x4mm angles and providing hinges 5" long 4 nos , handle for lifting the cover and making provision for locking the cover fixing the new cover by duly dismantling and chipping the old damaged MS cover with help of reqiured electric jack with out causing any damage to the roof slab structure and fixing the new fabricated aluminum cover in CC 1:2:4 prop, using M20 hard gauge metal, curing , lifting the debris away from the site etc. complete including cost and conveyance of all materials, labour charges , all incidental and operational charges etc . as directed by the departmental officers.

2

25000

50000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture, Supply, Delivery of filter beds model drum locking set made up of Brass for fixing to model drum of beds for easy operation of filtration process including material charges, transport charges,loading, unloading,charges and labour charges for making etc complete as directed by the HMWSSB Engineers

20

1200

24000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture, Supply, Delivery and fixing of MS plates to MS channels of sedimentation tanks with the help of nuts duly cutting the plates in required shape and size with the help of cutter and providing painting to plates including material charges, transport charges,loading, unloading, fixing charges and labour charges etc complete as directed by the HMWSSB Engineers

60

1500

90000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Repair and re placement of the damaged back washing model drum of Beds duly cutting the damaged bolts, nuts with help field gas cutting set, removing the model outside the bed and providing necessary repairs to the model drum and fixing the same with new nuts bolts, rubber packing etc., and laying CC bed by dewtering for fixing the model in place including cost of labour charges, cost of consumables, hire charges for required equipment gas chain pulley block with sealing, cost and conveyance of all other materials and all other incidental and operational charges, transportation of men, materials and machinery to the site etc complete

2

40000

80000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting of Measuring level scale board of reservoirs with back side black colour and front side blue colour with use of Asian paint and Providing letters/numbers on Measuring level scale board of reservoirs with Raidium paint at different levels at site all incidental and operational charges and labour charges as directed by the departmental officers.

2

12000

24000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting of the railings around the filter beds consisting of MS horizontal rails of 12mm dia, MS vertical posts of 12mm dia 0.90m height spaced 1.7m c/c and skirting plate at bottom etc having different dimensions with Two Coats of enamel paint of standard make and quality of approved shade and uniform texture, by duly scrapping the surface with wire brushes , sand paper and scrappers until to achieve smooth surfaceincluding cost and conveyance of all materials, labour charges, all incidental and operational charges, sundries, taxes,etc complete as directed by the departmental officers

1000

70

70000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;To channel supports of settling tanks

6

5000

30000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;To de sludging valves

36

800

28800

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;To sluice valves

60

1000

60000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Providing enamel painting in two coats of the approved colour of Asian or other equivalent approved branded make at the required places like valves and channel supports provided for inlet pipes of settling tanks etc. at Miralam Filter Beds by duly scrapping the surface with wire brushes , sand paper and scrappers until to achieve smooth surface , etc.including cost and conveyance of all materials , wages for painters and helpers , transportation, taking all precautionary measures at doing the work all incidental and operational charges etc. complete as directed by the departmental officers.

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply delivery and fixing of Iron meshes to available frames to restrict the entry of warms, insects and floating materials in to water with the help of nuts and bolts as directed by departmental officers including of cost of nuts and bolts and other required materials cost of all materials, taxes, duties, fabrication charges, labour charges, and all incidental and operational charges, loading, unloading etc., complete for finished item of work.

1

3500

3500

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacturing and supply and Delivery of MS frames made of angulers transportation to site after fabrication, and fixing in position, making necessary holes to frame and supply of nuts and bolts for fixing iron meshes to frames to restrict the entity of warms. Insects and floating materials in to water and providing handles to frames for removing and re fixing in required positions as directed by departmental officers including of welding rods and welding and other required materials cost of all materials, taxes, duties, fabrication charges, labour charges for fabrication and fixing and all incidental and operational charges loading, unloading etc.. complete for finished item of work

5

7000

35000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture, Supply and delivery of caps made with cotton fabric with printing of HMWSSB logo and including cost and conveyance of all materials and labour charges etc complete as directed by the Departmental Officers.

40

140

5600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Re-fixing of GLSR level gauges with new accessories of all nuts, bolts GI floats and GI fittings, steel rope supporting guide wheels, and supporting angles, and assembling of level gauges and fixing the same using flexible ladders including transportation charges all incidental and operational charges and labour charges as directed by the departmental officers.

2

4500

9000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Dismantling of damaged GLSR level gauges duly de-screwing of all nuts, bolts GI floats and GI fittings, steel rope supporting guide wheels, and supporting angles, of damaged using flexible ladders including transportation charges all incidental and operational charges and labour charges as directed by the departmental officers.

2

3500

7000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture, Supply, Delivery and fixing of MS Air vents of suitable size to the 13 ML reservoir made of MS angles and iron mesh by replacing damaged vents to avoid entering of birds into the reservoir including cost and conveyance of all materials, fixing charges, labour charges etc complete

20

3000

60000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery and fixing of GI air vents covers of suitable sizes with double layer aluminum circular covers of required dia outer layer with perforated frame of 18 Guage of height 0.45M , and inner layer of required dia with 0.30M height duly fabricated with Aluminum revitments , grip handle and fixing SS mesh of 30x30 to the existing RCC vent pipes including cost of all materials, labours charges etc. complete as directed by the Departmental officers.

20

4500

90000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, Delivery and Fixing of CPVC fittings like CPVC pipe, ballvalve,dummy and bends to the alum solution tank in place of damaged to carry alum solution to mix with raw water including all incidental and operational charges , transportation to site osmansagar section office etc complete finished item

4

10000

40000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Chairs for office

12

300

3600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Level Registers

6

1500

9000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Plastic vipers

200

150

30000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;MS Jali rods

10

3000

30000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;MS kurpi ( trowel )

10

1800

18000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;wire brushes

100

100

10000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;long spades for channel cleaning

25

950

23750

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Axes

20

500

10000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;sickle

30

250

7500

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Bleaching powder

600

50

30000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Buckets for cleaning of reservoirs and other areas

15

150

2250

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Soft Brooms

25

150

3750

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Coconut Brooms

120

50

6000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply and Delivery of cleaning materials for using at Miralam Filter beds including all incidental and operational charges , transportation to site osmansagar section office etc complete finished item

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture, Supply and Delivery of Alum Placing Stands Make with MS angular frame with MS squre rods with necessary welding at site with gas welding along with two supporting tables for placing alum in Alum Solution making tanks duly providing supporting structures, hinges,MS angles and proving anti corrossive painting including transportation charges and welding charges including hire charges of welding machine including cost of labour charges, cost of consumables, hire charges for required equipment gas, welding with electrodes cost and conveyance of all other materials and all other incidental and operational charges, transportation of men, materials and machinery to the site etc complete as directed by the departmental officers

6

30000

180000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacture, Supply and Delivery of MScover by replacing damaged MS cover over chambers of valves,BT, Waste water outlet channel and various places duly providing supporting structures, hinges,Ms angles and refixing of MS cover in position including transportation of men and materials and three line arc welding charges including hire charges of welding machine etc complete as directed by the departmental officers

8

16000

128000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For back washing air valves of beds

10

8000

80000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For 300mm dia valve on 1MG inlet

1

10000

10000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For 400mm dia valve on 1MG inlet

1

12000

12000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For Settling tank inlet valves

36

12000

432000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For Waste water valves of Beds

10

15000

150000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For Beds inlet valves

10

15000

150000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For back washing water valves of beds

10

15000

150000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Servicing greasing overhauling to the spare parts and checknut applying grease and oiling to all the parts as per provisions made at site duly removing the old grease cleaning all the parts by using white kerosene coir brushes caton waste etc by opening the cover by discerning the bolts including cost and conveyance of all materials like kerosene grease oil Catton waste coir brushes etc wages for skilled and unskilled workers including all incidental and operational charges etc complete as directed by the dept officers.

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For back washing air valves of beds

4

25000

100000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For 300mm dia valve on 1MG inlet

1

35000

35000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For 400mm dia valve on 1MG inlet

1

38000

38000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For Settling tank inlet valves

8

38000

304000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For Waste water valves of Beds

4

40000

160000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For Beds inlet valves

4

40000

160000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;For back washing water valves of beds

4

40000

160000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Repairs and Replacmenet of the damaged spare parts of the valves duly cutting the damaged bolts, nuts with help of field gas cutting set, removing the bow nut along with sluice shutter/gate with the help of chain pulley block/crane, removing the worn out spindle screw rod, broken check nut and removing the rubber insertion etc., and cleaning properly all surfaces and reassembling the valve components such as Re-threading existing spindle rod of valve stainless steel spindle screw stem rod and making new checknut made of gun metal as per valve specification duly on special design lathe machine stem rod of size and making chuck nut patter, molding, casting etc. replacement of damaged checknut and inserting the sluice shutter, neoprene rubber insertion, bow nut, stuffing box dummy plate and then finally tightening sluice valve unit with std bolts, nuts and double washers including cost of labour charges, cost of consumables, hire charges for required equipment gas chain pulley block with sealing, cost and conveyance of all other materials and all other incidental and operational charges, transportation of men, materials and machinery to the site etc complete

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Flooring with 40 mm thick Rough Shabad/Tandur stones set over base coat of CM(1:8) prop., 12 mm thick over CC bed already laid including pointing with cment mortar CM(1:3)prop., duly filling joints neatly including cost of all material like flooring stone, cement, sand and water, labour charges for dressing of flooring stones, cost and conveyance of all materials and all other incidental and operational charges etc., complete for finished item of work.

100

767

76700

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Carting surplus earth, including loading and unloading etc. and including all labour charges

263.58

175

46152.86

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;50% of Total EWE qty

50

42

2135

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Refilling trenches with excavaied soils including watering tamping. all labour charges etc.

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;600mm dia pipe

4

879

3518.8

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;450mm dia pipe

4

689

2759.2

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;400mm dia pipe

4

565

2261.6

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;300mm dia pipe

8

461

3694.4

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;250mm dia pipe

8

405

3241.6

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;200mm dia pipe

8

359

2875.2

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;100mm dia pipe

8

258

2067.2

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Jointing Cl pipe SS ends with cement joints but excluding cost of materials and including all labour charges etc.

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery of spun yarn for performing joints for dia pipe sizes and T joints etc including cost and convaynce charges etc.

40

130

5200

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply, delivery of Cement for performing joints for dia pipe sizes and T joints etc including cost and convaynce charges etc.

700

5

3850

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;650mm dia Collar for 600mm dia pipe

1.2

15800

18960

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;500mm dia Collar for 450mm dia pipe

1.2

13200

15840

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;450mm dia Collar for 400mm dia pipe

1.2

10800

12960

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;350mm dia Collar for 300mm dia pipe

2.4

9450

22680

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;300mm dia Collar for 250mm dia pipe

2.4

8800

21120

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;250mm dia Collar for 200mm dia pipe

2.4

7200

17280

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;150mm dia Collar for 100mm dia pipe

2.4

6200

14880

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacturing supply and delivery of MS Collar of different sizes making with different thickness including cost of material Fabrication charges. Epoxy painting charges and convyance charges etc complete

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;600mm dia pipe

4

21900

87600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;450mm dia pipe

4

15000

60000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;400mm dia pipe

4

13900

55600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;300mm dia pipe

4

11600

46400

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;250mm dia pipe

4

9000

36000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;200mm dia pipe

4

8100

32400

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;100mm dia pipe

4

6400

25600

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Manufacturing supply and delivery of MS Pipe of different sizes making with different thickness including cost of material Fabrication charges. Epoxy painting charges and convyance charges etc complete

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;600mm dia pipe

4

994

3976.8

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;450mm dia pipe

4

745

2982.8

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;400mm dia pipe

4

662

2651.2

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;300mm dia pipe

4

497

1988.4

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;250mm dia pipe

4

414

1657.2

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;200mm dia pipe

4

331

1325.6

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;100mm dia pipe

4

132

530.4

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Cutting water supply mains without water in main but including cost of implements and all labour charges etc. Complete

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;EWE in all available soils and including stacking on banks including labour charges, all leads and other incidental and operational charges , tools and plants etc complete as directed by the departmental officers for pipeline trenches.

100

419

41960

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges , tools and plants etc complete as directed by the departmental officers for pipeline trenches.

20

3020

60400

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply , delivery and of G.I chain link mesh of 8 guage (4mm ) 2?x2? size including cost and conveyance of all materials , labour charges for fixing of G.I chain link mesh to M.S angles with M.S flats of size 0.3 x 5 mm , 3 nos for each M.S angle duly drilling three holes to MS angles and three holes to each flat and fixing in posisition by tightening the GI mesh and fixing with nuts , bolts etc. complete including all operational and incidental charges etc. complete as directed by the departmental officers.Rate as per TBSC-E.II-08 =(701+701*13.615%=796.44)

35

796

27875.4

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Supply and delivery of M.S Angles of 65 x65 x5 mm size including supply and delivery of MS flat post of size 25x3mm duly drilling three holes to MS angles and three holes to each flat complete including all operational and incidental charges etc. complete as directed by the departmental officers..

12

2750

33000

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Plastering 20 mm thick in two coats with CM(1:4) prop; 16mm thick for 1st coat and with CM(1:3) prop., 4mm thick for 2nd coat to brick wall with sponge finishing including cost and conveyance of all materials, labour charges, leads, lifts, curing, scaffolding charges and all other incidental and operational charges etc., complete for finished item of work

100

617

61700

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Construction of Brick Masonary in CM(1:6) prop., using second class Bricks traditional of size 230x110x70 mm including cost and conveyance of all materials to site, tools and plants, scaffolding charges, all leads and lifts, curing, all labour charges, all other incidental and operational charges etc., complete for finished item of work.

10

7427

74270

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Plain Cement Concrete M10 Nominal Mix; using 40mm guage hard granite machine crushed metal including cost and conveyance of all materials to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete

30

6174

185220

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Plain Cement ConcreteM15 grade(1:2.5:5) Prop with (40 mm 0.54cum;20 mm=0.27 cum;10 mm=0.09cum) guage hard granite machine crushed metal including cost and conveyance of all materials to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete

30

7219

216570

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting with epoxy anti corrosive paint of food grade quality of to all sides of walls and at bottom surface in two coats over the epoxy primer coat of approved shade of Asian/ burger make paint including engaging experience painters and labour who has done similar nature of works including cost and conveyance of all materials, wages for painters, helpers, taking all precautionary measures while executing the work such as wearing safety glasses . masks ropes, ladder etc. all incidental and operational charges complete as directed by the departmental officers

1200

307

368400

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal wall

50

267

13350

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting with synthetic enamel paints of approved brand in two coats over a coat of primer grade including thorough scrapping, clean removal of dirt, etc., complete including cost and conveyance of all materials to work site charges and all opeational labour charge etc. as directed by departmental engineers

80

238

19040

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting with two coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making three coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site, Scoffolding, Curing charges and all operational, incidental, labour charges etc. complete for finished item of work.

900

284

256140

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Painting internal walls and ceiling with two coats of ready mixed oil bound wahsable distemper Grade-I quality of approved brand and shade over a base coat of appropriate primer of approved brand, making three coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911.

800

159

127200

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire charges for 50 KVA Diesel Generator for Dewatering, Field welding, and lighting purpose including Hire charges, cost of fuel, Wages for operator, transportation charges from yard to work site ,all incidental and operational charges etc., complete, as directed by the H.M.W.S.S.B. Engineers.

30

1895

56862

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;10HP electrical pump set

3960

218

865656

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;5HP elecrical pump set

4930

165

816408

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire charges for dewatering pump set of 5HP & 10HP Electrical Pump for dewatering the silt from the settling tanks, at Leakage work etc.with the electrical engine driven pump set including hire charges, crew charges , hose pipe for section delivery to a suitable distance etc.including all incidental and operational charges etc. complete as directed by the Departmental officers

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Un Skilled labour (520+40% of 520)

600

728

436800

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Semi Skilled labour (550+40% of 550)

540

770

415800

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Skilled labour (580+40% of 580)

360

812

292320

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Engaging labour for cleaning and Removing of Silt and Sludge with the help of buckets and vessels etc. in hoopers of settling tanks having the dimensions 24ft x 24ft at top and 3ft x 3ft at bottom and having a depth of 30ft and scraping the algae on the sides of walls and channels in the Hoopers including all labour charges etc.

1

-

-

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Hire Charges for Engaging Hydraulic excavator showel Shovel 0.5 cum of 75 HP type for earth work excavation and refilling the pipeline trenches and removing trees & small bushes and Other miscellaneous at MF beds including wages for operator and helper and cost of fuel for machinery and transportation charges from yard to work site and all other incidental and operational charges etc. complete as directed by the H.M.W.S.S.B Engineers

240

2117

508176

... More
Annual Maintenance of (i) Miralam Filter beds under Miralam Filter Beds Section and (ii) Various wor;Engaging Labour for Cutting jungle Trees, Bushes and removing other waste materials in miralam filter beds premises at various places, for cleaning of settling tank channels & walls, for cleaning of raw water inlet and setling tank outlet channel, for cleaning of back wash water outlet channel & rain water channel, for lifting alum from alum room to alum tank by engaging Unskilled labour . including wages for labour, all incidental and operational charges etc. complete as directed by the H.M.W.S.S.B Engineers (Rates as per SSR 2021-22) 40% extra in Hy derabad Limits (as per ssr 2022-23 =520 + 208=728)

2140

728

1557920



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.