Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
426921Bid Award Id
ViewTender No
299/CGM(E)/O&MC.II/D5/2023-24, Dt.07.06.2023 (1st Call)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Water Supply;Supply and filling of quary Dust where ever required including cost & conveyence stracking spreading levelling compacting etc,
23.12
614
14200.3
... More
Water Supply;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Junction portion and pipeline trenches).(100mm dia)
69.35
293
20326.49
... More
Water Supply;Redoing the 4" dia sewer connections which are damaged during the work 100mm SWG pipes
33
273
9028.8
... More
Water Supply;Redoing of 15mm PPC connection for domestic water supply connection including earth work excavation cost of pipe refilling etc.,complete as directed by the HMWS&SB Engineers.
73
237
17322.9
... More
Water Supply;Supply and delivery fixing of RCC Precast manhole chambers having the size of 36"x21" dia at top fixing in CC 1:4:8 Prop:along with FRC Cover and frame laying CC 1:2:4 prop: including cost of materials labour charges earth work curing conveyance etc., Complete as directed by the HMWS&SB Engineers
6
6696
40176
... More
Water Supply;Conveyance of SWG pipes from departmental stores to work site, including loading, unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (100/150mm dia SWG)
3.77
1504
5670.83
... More
Water Supply;Jointing CI/DI pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertionwhite lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the deptl.Officers ( For 150mm dia)
6
455
2731.8
... More
Water Supply;Jointing CI/DI pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertionwhite lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the deptl.Officers ( For 100mm dia)
6
307
1846.2
... More
Water Supply;Loweing, Keeping in position and fixing CI sluice valves ( with cap/ with hand wheel & reflex valves) excluding cost of bolts, nuts , rubber insetion, sluice valve and tail pieces.(150mm dia sluice valves)
3
388
1165.5
... More
Water Supply;Loweing, Keeping in position and fixing CI sluice valves ( with cap/ with hand wheel & reflex valves) excluding cost of bolts, nuts , rubber insetion, sluice valve and tail pieces.(100mm dia sluice valves)
3
229
687.6
... More
Water Supply;Jointing 150mm dia CI pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
42
200
8400
... More
Water Supply;Jointing 100mm dia CI pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
10
163
1635
... More
Water Supply;Lowering the 150mm dia DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
121
94
11470.8
... More
Water Supply;Lowering the 100mm dia DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
66
58
3841.2
... More
Water Supply;Cutting of 200mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
4
248
994.4
... More
Water Supply;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers. (100mm dia SWG)
374
217
81307.6
... More
Water Supply;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Junction portion and pipeline trenches).
146.47
450
65940.79
... More
Water Supply;Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
40.79
2940
119922.6
... More
Water Supply;Description of Item
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements