Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date10 Feb 2025
Closing Soon17 Feb 2025
Tender Amount₹ 20,58,175
Costs
EMD
₹ 20,582Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574957Tender No
EP.No.243/CGM(E)/O&M C-V/O&M Div-XIII/AME Works - Sewerage/2024-25, Dt: 10.02.2025 (Reserved for SC Category)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Redoing domestic sewer line connection including EWE in all available soils and including supply and delivery of 100/ 150 mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc complete.as directed by the department officers. For 150mm dia
45
398
17910
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Redoing domestic sewer line connection including EWE in all available soils and including supply and delivery of 100/ 150 mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc complete.as directed by the department officers. For 100mm dia
45
298
13410
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Redoing of 20 mm dia PPC Connections for domestic water supply connection including Earth Work Excavation Cost of MDPE pipes refilling etc complete as directed by the departmental officers For 20mm dia
12
266
3192
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Redoing of 15 mm dia PPC Connections for domestic water supply connection including Earth Work Excavation Cost of MDPE pipes refilling etc complete as directed by the departmental officers For 15mm dia
18
254
4579.2
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Construction of 1.20m internal diameter sewer manhole for additional depth of 0.10 M with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:4) Internal Plastering 20 mm thick in and external plastering 12 mm thick using CM 1:3 Prop.
18
2208
39744
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Construction of 1.20m internal diameter sewer manhole minimum depth 1.80m with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:4) with CC bed (1:4:8) Prop with CC Bed (1:3:6) Prop. Benching and channel finished with CC(1:2:4) Prop. Internal Plastering 20 mm thickin And external plastering 12 mm Thick using CM 1:3 Prop.
3
37565
112695
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Plastering with CM(1:3) prop., 12 mm thick, using natural river sand with sponge finishing including cost and conveyance of all materials to site, tools and plants, labour charges, leads, lifts, curing, scaffolding and all other incidental and operational charges etc., complete.
52.75
234
12343.5
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Plastering with CM(1:4) prop., 20 mm thick, using natural river sand with sponge finishing including cost and conveyance of all materials to site, tools and plants, labour charges, leads, lifts, curing, scaffolding and all other incidental and operational charges etc., complete.
57.14
341
19484.74
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Construction of 0.90m internal diameter sewer manhole for additional depth of 0.10 M with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM 1:4 Prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM 1:3 Prop.
515
1126
579890
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Construction of 0.90 mts internal diameter sewer manhole minimum depth 1.00 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:4) Prop. with CC Bed (1:3:6) Prop. Benching and channel finished with CC(1:2:4) Prop. Internal Plastering 20 mm thick in CM(1:4) and external plastering 12 mm Thick using CM (1:3) Prop. Excluding Manhole cover & frame
41
14944
612704
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Carting away surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidental and operational charges etc. complete.
33.32
186
6228.84
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Plain Cement Concrete (1:2:4) Nominal Mix using 20mm HG Machine Crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site including all operational operational, incidental and labour charges, such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APSS No.402), as directed by HMWS&SB Engineers
26.33
6018
158478.69
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Supply delivery and filling quarry dust (in trenches of foundations & basement and the pipeline trenches) with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work .
17.33
644
11170.92
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Lowering the SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers For 200mm dia
44.4
375
16676.64
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Lowering the SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers For 250mm dia
15.6
467
7297.68
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Lowering the SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers For 300mm dia
18
521
9385.2
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete, as directed by the H.M.W.S.&.S. Board Engineers.For 5 HP
240
417
20016.96
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Barricading, Hoarding, lighting and wathcing etc. for water supply pipe line trenches etc. complete as directed by the HMWS&SB officers.
803.6
234
188604.92
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means
94.22
324
30536.7
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. ( by Manual Means)
65.76
497
32735.33
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Cutting open CC Road with including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.
26.6
2939
78198.68
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Cutting open BT Road with including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.
6.72
1412
9494.35
... More
Maintenance of existing sewerage network i.e., reconstruction of damaged sewer manholes;Conveyance of SWG pipes from departmental stores to work site, including loading, unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
78
20
1575.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%