Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date22 Feb 2025
Closing Soon25 Feb 2025
Tender Amount₹ 16,68,184
Costs
EMD
₹ 16,682Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
577392Tender No
EP- 195 (2nd call)/CGM(E)/O and M Circle-IV/2024-25,Dtd: 22.02.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Annual Maintenance of Sewerage System;Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means, For Man holes
128.14
324
41530.17
... More
Annual Maintenance of Sewerage System;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
250
234
58675
... More
Annual Maintenance of Sewerage System;Dewatering pipeline trenches duly bailing out water with 5 hp engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete.
80
417
33361.6
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 300mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
20
521
10428
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 250mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
15
467
7017
... More
Annual Maintenance of Sewerage System;Lowering and laying in ready made trench true to its alignment and gradient, jointing and testing of 200mm dia Stone Ware (SWG) Pipes including cost of jointing material such as cement motar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe (Reference to specifications of BIS No.6530/72)
15
375
5634
... More
Annual Maintenance of Sewerage System;Construction of 1.20x1.20 mts internal diameter sewer manhole minimum depth 1.80 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers
3
37565
112695
... More
Annual Maintenance of Sewerage System;Construction of 0.90x0.90 mts internal diameter sewer manhole minimum depth 1.00 mts with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers
20
14944
298880
... More
Annual Maintenance of Sewerage System;Construction of additional 0.1m depth of 0.90x0.90M diameter sewer with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers.
316
1126
355816
... More
Annual Maintenance of Sewerage System;Construction of additional 0.1m depth of 1.20x1.20M diameter sewer with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 225 x 100 x 60 mm in CM (1:6) Prop. with CC Bed (1:4:8) Prop. Benching with CC 1:2:4 prop. Internal Plastering 20 mm thick in CM(1:3) and external plastering 12 mm Thick using CM (1:6) Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the departmental officers.
80
2208
176640
... More
Annual Maintenance of Sewerage System;Manholes Internal plastering 20mm thick in two coats with a bse coat of 16 mm in CM (1:6) prop. And top coat of 4 mm thick in CM(1:4) sqm including cost of all materials complete as directed by the department officers.
95.04
649
61756.04
... More
Annual Maintenance of Sewerage System;Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:5:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
54
298
16092
... More
Annual Maintenance of Sewerage System;Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 150 mm dia SWG pipes and including lowering laying and jointing in CM (1:5:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
27
398
10746
... More
Annual Maintenance of Sewerage System;Conveyance of 300 mm dia SWG pipes from stores to site
20
20
404
... More
Annual Maintenance of Sewerage System;Conveyance of 250 mm dia SWG pipes from stores to site
15
20
303
... More
Annual Maintenance of Sewerage System;Conveyance of 200 mm dia SWG pipes from stores to site
15
20
303
... More
Annual Maintenance of Sewerage System;Benching of damaged Sewer manhole frame upto road level CC with 1:2:4 mix using 6mm to 20mm HG metal including cost and conveyance of all materials to site, machine mixing of concrete, laying in position, spreading, levelling, compacting, curing including all labour charges etc complete.as directed by the department officers.
23.44
6018
141083.95
... More
Annual Maintenance of Sewerage System;Supply delivery and filling of quarry dust (50% Rubbish 50% HBG stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking levelling watering tampering rolling all leads labour charges and other incidential and operational charges etc., complete.
18.08
644
11654.37
... More
Annual Maintenance of Sewerage System;Transportation of FRC Frames and Covers from departmental store to work site using tractor
5
3720
18600
... More
Annual Maintenance of Sewerage System;Engaging labour for loading, unloading of FRC Frame and covers at store and complete as directed by the departmental officers.
96
805
77280
... More
Annual Maintenance of Sewerage System;Carting surplus excavated Earth/ rock from the site to a distance of about10/ 8/5 kms including loading, unloading, conveyance and dumping,labour charges, all leads and lifts,all other incidental and operational charges etc complete.
150.83
186
28196.16
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%