Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
497054Bid Award Id
ViewTender No
EP-143/CGM(E)/RC/2023-24, Dt:12.02.2024Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying of 150mm dia water supply;Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
6.04
5772
34868.74
Laying of 150mm dia water supply;Supply,delivery of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel, stacking, leveling, watering, tamping rolling, all leads, labour charges and other incidental and operational charges as directed by the H.M.W.S.&.S. Board Engineers.
9.26
678
6287.17
Laying of 150mm dia water supply;Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
5.25
614
3224.55
Laying of 150mm dia water supply;Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
6
272
1637.4
Laying of 150mm dia water supply;Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
10
237
2373
Laying of 150mm dia water supply;Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
1
6680
6680
Laying of 150mm dia water supply;Jointing of 150 mm dia DI pipes and specials with s/s ends excluding cost of jointing materials such as lead, cement or lead wool and hump yarn but including sundries such as cowst of fuel for melting lead, filling with water and testing to required pressure including labour charges and all other incidental and operational charges to work site etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
4
324
1296.8
Laying of 150mm dia water supply;Cutting of 150mm dia DI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
4
248
994.4
Laying of 150mm dia water supply;Jointing of 150mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
2
455
910.6
Laying of 150mm dia water supply;Labour charges for lowering and keeping in positio 150mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
388
388.5
Laying of 150mm dia water supply;Jointing 150mm dia DI pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
19
200
3800
Laying of 150mm dia water supply;Lowering the 150mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
50
94
4740
Laying of 150mm dia water supply;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
100
217
21740
Laying of 150mm dia water supply;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for Sluice valve all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
5.25
293
1538.78
Laying of 150mm dia water supply;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
35
450
15757
Laying of 150mm dia water supply;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
9.26
2940
27224.4