Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Building Construction
Opening Date27 Jan 2025
Closing Date31 Jan 2025
Tender Amount₹ 24,42,652 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Office building at 4.0ML GLSR;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

22.5

685

15427.57

... More
Construction of Office building at 4.0ML GLSR;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes

704.11

78

55075.48

... More
Construction of Office building at 4.0ML GLSR;Providing concrete for reinforced concrete of Grade M 20 in open foundations using 20 mm and 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Slab

0.97

7590

7362.79

... More
Construction of Office building at 4.0ML GLSR;Providing concrete for reinforced concrete of Grade M 20 in open foundations using 20 mm and 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Wall

3.92

8083

31687.16

... More
Construction of Office building at 4.0ML GLSR;Providing concrete for reinforced concrete of Grade M 20 in open foundations using 20 mm and 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Raft

1.51

5374

8115.57

... More
Construction of Office building at 4.0ML GLSR;Plain Cement Concrete 1:5:10 prop using 40mm Hard Granite Machine Crushed metal including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site , all taxes and Labour Charges for mixing , laying Concrete for foundation tamping, vibrating, lifting, curing, finishing top surface for benching, Kerbing, lintel & table drain, But Excluding Centering Shuttering Charges cost of steel and fabrication charges Etc., Complete for finished item of Work. Excluding Cost of Seigniorage Charges on all materials Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. All work upto plinth level. (50% sand and 50% Rocksand)

1.13

4958

5603.53

... More
Construction of Office building at 4.0ML GLSR;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

47.86

497

23824.71

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of Racks

2

7000

14000

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of computer table

2

10000

20000

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of 3 seat alluminium chair

2

8500

17000

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of chairs

5

2500

12500

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of 3 chair 3 table

1

15000

15000

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of Office table big

1

35000

35000

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of Almariah Godrej make

2

10500

21000

... More
Construction of Office building at 4.0ML GLSR;Supply and delivery of Officer rolling chairs

1

3500

3500

... More
Construction of Office building at 4.0ML GLSR;Supply and transportation of 20W +/- 10%, 1900 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage, double side connection, with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc.complete with 5 years warranty. LUMINAIRE MAKE: Fortune Arrt / Capart / Kashyap BLU / Million / Trinic / Sieger / Stanjo / Promptec / Lighting Technologies / Renesola / C&S / Luker / RR Electric / Rhino ELEC-3.5.11

15

435

6525

... More
Construction of Office building at 4.0ML GLSR;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient ELEC- 5.1.1

6

3085

18510

... More
Construction of Office building at 4.0ML GLSR;Supply of 6A 3/2 pin flush type Socket with shutter. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL. ELEC-1.7.1d

4

29

116

... More
Construction of Office building at 4.0ML GLSR;Supply of 23 / 0060 , 3 core (0.15 mm dia of each lead) twisted / flat heavy Copper wire. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal / Suncab ELEC-1.5.5

200

140

28000

... More
Construction of Office building at 4.0ML GLSR;Supply of 2.5sq mm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. Makes : Finolex / RR kabel / Havells / Beljin (HFFR) /Ollivin(HFFR) / Finecab Gold (HFFR)/GM(HFFR) / Gold Medal(HFFR) / Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC (HFFR) / Bonton (HFFR) and Avocab (HFFR) / Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) / Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) ELEC-1.5.1b

200

39

7800

... More
Construction of Office building at 4.0ML GLSR;Wiring for light points for RX1.00 Sq.mm Wiring of finolex make with PVC pipe concelaed with manufacturing GI switch box of suitable boxes. With Light controlles switches.

100

538

53820

... More
Construction of Office building at 4.0ML GLSR;Supply of ISI 20mm outer dia heavy grade with IS:9537 part 3 rigid PVC pipe. ELEC-1.2.1 Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro

150

35

5250

... More
Construction of Office building at 4.0ML GLSR;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks TBSP-H.II-01

2000

10

20000

... More
Construction of Office building at 4.0ML GLSR;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indianmakeheavytype-32mmNBSize---TBSP-G.III-04

2

2057

4114

... More
Construction of Office building at 4.0ML GLSR;S&F of 15 mm brass body CP finish self closing tap push type conforming to IS 1711 -TBSP-F.III-01

6

302

1812

... More
Construction of Office building at 4.0ML GLSR;S&F premium make CPVC Pipes of 28.60mm OD Pipe-SDR 13.5 TBSP-J.III-03

30

235

7050

... More
Construction of Office building at 4.0ML GLSR;S&F premium make CPVC Pipes of 15.90mm OD Pipe-SDR 13.5 TBSP-J.III-01

30

155

4650

... More
Construction of Office building at 4.0ML GLSR;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm--TBSP-J.I-35

4

564

2256

... More
Construction of Office building at 4.0ML GLSR;Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc. With solvent jointing as per standard practice TBSP-H.IV-01

18

104

1872

... More
Construction of Office building at 4.0ML GLSR;110 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 BSP-H.I-06

4

661

2644

... More
Construction of Office building at 4.0ML GLSR;75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm BSP-H.I-01

4

301

1204

... More
Construction of Office building at 4.0ML GLSR;S&F Stainless steel 4" dia round Grating for nahany or floor trap cover with cockroach trap with or without hole TBSP-F.VII-28

10

183

1830

... More
Construction of Office building at 4.0ML GLSR;Supply of4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings TBSP-H.II-69

4

134

536

... More
Construction of Office building at 4.0ML GLSR;Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995--TBSP-E.VII-01

4

1100

4400

... More
Construction of Office building at 4.0ML GLSR;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm Single C.P. Pillar cock TBSP-E.VI-04

2

2340

4680

... More
Construction of Office building at 4.0ML GLSR;Supply, Installation and commissioning approved make floor mounted Anglo Indian wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour TBSP-E.II-03

2

6216

12432

... More
Construction of Office building at 4.0ML GLSR;Providing and fixing false ceiling at all heights with GRG (Glass Fibre Reinforced Gypsum) false ceiling tiles of stat 595 x 595 nun of approved texture, design and patterns having moisture consent less than 2% humidity resistance of 99%, NRC 0.50 10 0.75 as per 15 8225 1987, Non combustible as per BS 476 part 4 1970 and light reflectance of 85% minimum to be faid in true horizontal level suspended on inter locking metal T grid of hot dipped galvanized iron section of 0.33 mm thick galvanized @ 120 gms per sqm including both sides, comprising of main T runners of size 15x32mm of length 3000mm, cross T of size 15x32mum of length 1200 mm and secondary imermediate cross T of size 15x32mm of length 600mm to form grid module of size 600 600mm suspended from ceiling wing galvanized mild steel Hems galvanizing 80 grams per sqm ie 50mm long, 8mm outer diameter, M-6 dash Fasteners, 6mm dia fully threaded hanger rod up to 1000mm length and L. shape level adjuster of size 85x25x2 mm Galvanized iron permitter wall angle of size 24x24x0.40mm of length 3000mm to fixed on periphery wall/parution with help of plastic rawl plugs at 450mm centre to centre and 40mm long dry wall SS screws. The work shall be carried out as per specifications, drawing and as per directions of Engineer-in-ChargeTBSE-C-1-35,flooring bed-nurse room,hall,store room,ward,toilet,Lab,toilet

70.32

1811

127349.52

... More
Construction of Office building at 4.0ML GLSR;Supply and fixing of doors with shutters of sal wood including cost and conveyance of all materials and labour charges est complete, Deduct doon D1, D2,D3

7

13925

97475

... More
Construction of Office building at 4.0ML GLSR;Supply of ISI 20mm outer dia heavy grade with 15:9537 part 3 rigid PVC pipe. ELEC-1.2.1 Makes Sudhakar/Finolex/ Modi/VIP/Precision/Universal/Million Plast/Gold/Polycab/DEC/Beljin Champion/Austro

150

31

4650

... More
Construction of Office building at 4.0ML GLSR;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track-2 Panel Sliding windows duly manufactured using UPVC reinforced profiles of 60 mm x 49 mm x 2.20 mm for outer frames, 62 mm x 41 mm x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with 30 mm 15 min x 1.5 mm with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mum prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co- extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site completeforfinisheditemofwork. TBSC M.II-14

16.2

7013

113610.6

... More
Construction of Office building at 4.0ML GLSR;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912,Internal,nurse room,hall,store room,ward,Toilet, D1,D2,D3, Windows,Ceiling, Flooring bed- nurse room,Chajjas, External

427.35

297

127004.15

... More
Construction of Office building at 4.0ML GLSR;Flooring with vitrified tiles of Ist quality, set over base coat of cement mortar (1.8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread ( 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including scigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.flooring bed- nurse rooms, hall, store room, ward, toilet, Lab, toilet

70.32

952

67012.15

... More
Construction of Office building at 4.0ML GLSR;Providing impervious coat to exposed RCC roof slab surface with CM(1.3), 20mm thick with 1kg of water proof compound per bag of cement buid over roof when it is green including cost of all materials, seigniorage charges. excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item of work BLD-CSTN-8-25

84.93

685

58233.95

... More
Construction of Office building at 4.0ML GLSR;Plastering 20mm thick two coats with base coat of 16mm thick in CM (1.6) and top coat of 4mm thick in CM. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand, Water, etc., to site cost of seigniorage charges on all materials, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, caring, including cutting grooves where ever necessary etc, complete for finished item of work of uneven surfaces of walls. (As per S.S. 904) per 10 Sqm,Internal,Nurse room, Hall, Store room, Ward, toilet, Lab,toilet,Deduct,D1,D2,D3, Window, Ceiling, Flooring -bed-nurse rooms,Portico, Chajjas, External

340.35

649

221156.03

... More
Construction of Office building at 4.0ML GLSR;Plastering 12mm thick single coun Plastering with CM (1.3), 12 mm thick with duhura sponge finishing including com A conveyance of all matcrisis läs cement, Sand, Water, etc., o site cod of seignorage charges on all materials all operational, including charpes, labour charges for mixing mortar, finishing, caffolding, lift charges, curing, including cutting grooves where eves necessary es complete for finished item of work of uneven surfaces of walls (As per 5.5. 904) per 10 Sqm,Ceiling, Hall, Store room, Ward, toilet, Lab,toilet,Portico,

77.28

234

18149.98

... More
Construction of Office building at 4.0ML GLSR;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop havi minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bric 6 Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mis Cement Mortor Scaffoding Charges lift charges, Curing charges Ete, Complete for finished item of work (55 504), per 1 Cum. BLD-CSTN-5-4, cross walls, long walls,Deduct doors D1, D2,D3,Windows

31.07

8781

272838.1

... More
Construction of Office building at 4.0ML GLSR;Randum Rubble Stones in Cement Mortor 1:6 Prop using hard granite stone including Cost & Conveyance of all materials like Cement, Sand, Water, Granite Stones, Etc., including on all Materials, all taxes including Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding charges Curing. Etc. complete for finished item of work Excluding cost of Seigniorage Charges (As per SS 615), per 1 Cum, Below Ground level,long walls,cross walls,deduct,Above Ground levellong walls,crots walls,deduct

26.75

5405

144599.53

... More
Construction of Office building at 4.0ML GLSR;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT)/ Mild steel (MS) steel bars (Fe 415/ Pe 500 grade as per 15. 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved 4 materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes, footings, pedestals, coloumns, plinth beams, roof beams, slab

3317.5

78

259494.85

... More
Construction of Office building at 4.0ML GLSR;RCC M-20 Nominal mix (Cement fine aggregate coane aggregate) corresponding to Table 9 of 15 duding con conveyance of all materials become fine (and) course aggregate, water cho, to site and including Seigniorage charges, sales & thing all operational, incidental and labour charges such as machine mixing, fayling concrete, curing es complete bat excluding cost of sweet and its fabrication charges for finished item of work, but excluding comering, shattering BLD-CSTN-2-13, Lintels, Over doors D1,D2,D3, WV

2.25

14909

33546.26

... More
Construction of Office building at 4.0ML GLSR;RCC M-20 Nominal mix (Cement fine aggregate coane aggregate) corresponding to Table 9 of 15 duding con conveyance of all materials become fine (and) course aggregate, water cho, to site and including Seigniorage charges, sales & thing all operational, incidental and labour charges such as machine mixing, fayling concrete, curing es complete bat excluding cost of sweet and its fabrication charges for finished item of work, but excluding comering, shattering BLD-CSTN-2-13,Slab

10.13

7160

72533.94

... More
Construction of Office building at 4.0ML GLSR;RCC M-20 Nominal mix (Cement fine aggregate coane aggregate) corresponding to Table 9 of 15 duding con conveyance of all materials become fine (and) course aggregate, water cho, to site and including Seigniorage charges, sales & thing all operational, incidental and labour charges such as machine mixing, fayling concrete, curing es complete bat excluding cost of sweet and its fabrication charges for finished item of work, but excluding comering, shattering BLD-CSTN-2-13,Roof beams, portico beam

6.61

13861

91624.38

... More
Construction of Office building at 4.0ML GLSR;RCC M-20 Nominal mix (Cement fine aggregate coane aggregate) corresponding to Table 9 of 15 duding con conveyance of all materials become fine (and) course aggregate, water cho, to site and including Seigniorage charges, sales & thing all operational, incidental and labour charges such as machine mixing, fayling concrete, curing es complete bat excluding cost of sweet and its fabrication charges for finished item of work, but excluding comering, shattering BLD-CSTN-2-13,Plinth beams

2.58

14094

36364.51

... More
Construction of Office building at 4.0ML GLSR;RCC M-20 Nominal mix (Cement fine aggregate coane aggregate) corresponding to Table 9 of 15 duding con conveyance of all materials become fine (and) course aggregate, water cho, to site and including Seigniorage charges, sales & thing all operational, incidental and labour charges such as machine mixing, fayling concrete, curing es complete bat excluding cost of sweet and its fabrication charges for finished item of work, but excluding comering, shattering BLD-CSTN-2-13,Coloumas,coloumma F1,coloumna F2,coloumna F3

3.39

15085

51139.27

... More
Construction of Office building at 4.0ML GLSR;RCC M-20 Nominal mix (Cement fine aggregate coane aggregate) corresponding to Table 9 of 15 duding con conveyance of all materials become fine (and) course aggregate, water cho, to site and including Seigniorage charges, sales & thing all operational, incidental and labour charges such as machine mixing, fayling concrete, curing es complete bat excluding cost of sweet and its fabrication charges for finished item of work, but excluding comering, shattering BLD-CSTN-2-13, pedestals, coloumma F1,coloumna F2,coloumna F3

1.39

11501

15987.72

... More
Construction of Office building at 4.0ML GLSR;RCC M-20 Nominal mix (Cement fine aggregate coane aggregate) corresponding to Table 9 of 15 duding con conveyance of all materials become fine (and) course aggregate, water cho, to site and including Seigniorage charges, sales & thing all operational, incidental and labour charges such as machine mixing, fayling concrete, curing es complete bat excluding cost of sweet and its fabrication charges for finished item of work, but excluding comering, shattering BLD-CSTN-2-13,Footings,coloumma F1,coloumna F2,coloumna F3

4.01

10671

42791.67

... More
Construction of Office building at 4.0ML GLSR;Plain Cement Concrete 1:5:10 prop using 40mm Hard Granite Machine Crushed metal including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, all taxes and Labour Charges for mixing, laying Concrete for foundation tamping, vibrating, lifting, curing, finishing top surface for benching, Kerbing. lintel & table drain, But Excluding Centering Shuttering Charges cost of steel and fabrication charges Etc., Complete for finished item of Work. Excluding Cost of Seigniorage Charges on all materials Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. All work upto plinth level. (50% sand and 50% Rocksand),coloumns F1,coloumns F2,coloumns F3,long walls,cross walls,flooring bed-nurse room,hall, store room,ward,toilet,Lab,toilet,

12.84

4958

63672.02

... More
Construction of Office building at 4.0ML GLSR;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out. construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m. dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/304 MORTH,coloumns FI,coloumns F2,coloumns F3,long walls,cross walls,

41.69

497

20753.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.