Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
515424Bid Award Id
ViewTender No
EP-25/CGM(E)/RC/2024-25, Dt:25.05.2024Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying of 200mm dia Sewer connection;Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
27
614
16583.4
Laying of 200mm dia Sewer connection;Constructing 904.0 mm (3'0") dia brick masonry inspection chamber as per 15 - 4111 Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½" thick both inside and outside fitted with 20" dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete ((1/4) / 8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1 * 2 * 4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand,bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
5
8607
43035
Laying of 200mm dia Sewer connection;Supply, laying jointing and testing 152.4mm SWG 1st class pipes with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) upto 5? depth and refilling with watering and tamping etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
30
828
24840
Laying of 200mm dia Sewer connection;Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
9
237
2135.7
Laying of 200mm dia Sewer connection;Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
27
272
7368.3
Laying of 200mm dia Sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
27.2
1081
29403.2
Laying of 200mm dia Sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
6
14330
85980
Laying of 200mm dia Sewer connection;Lowering 200mm SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
150
347
52170
Laying of 200mm dia Sewer connection;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
300
217
65220
Laying of 200mm dia Sewer connection;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
16
392
6286.4
Laying of 200mm dia Sewer connection;Conveyance of SWG pipes from departmental stores of HMWSSB to work site including transportation loading, unloading and stacking etc., all labour incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
150
52
7890
Laying of 200mm dia Sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for manhole all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
22.44
293
6577.16
Laying of 200mm dia Sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
162.44
450
73130.49
Laying of 200mm dia Sewer connection;Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
46.33
1412
65455.02
Laying of 200mm dia Sewer connection;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
46.33
2940
136210.2