For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
506152Bid Award Id
ViewTender No
EP-151/CGM(E)/RC/2023-24, Dt:04.03.2024Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 300mm dia SWG line for providing sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.10m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
12.5
1081
13512.5
... More
Laying of 300mm dia SWG line for providing sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1.80m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
3
14330
42990
... More
Laying of 300mm dia SWG line for providing sewer connection;Lowering, laying and jointing 300mm SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
80
483
38712
... More
Laying of 300mm dia SWG line for providing sewer connection;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
80
217
17392
... More
Laying of 300mm dia SWG line for providing sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for manhole trenches water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
11.5
293
3370.65
... More
Laying of 300mm dia SWG line for providing sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
88.65
450
39910.23
... More
Laying of 300mm dia SWG line for providing sewer connection;Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
5.76
1412
8137.73
... More
Laying of 300mm dia SWG line for providing sewer connection;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
16.56
2940
48686.4