Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Civil Works Others
Opening Date24 Apr 2024
Closing Date29 Apr 2024
Tender Amount₹ 83,87,558 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of compound wall, operators room, inspection pathways;Plastering to brick masonry wall with 20mm thick single coat in CM (1:5) with dubara sponge finish including cost and conveyance of all materials and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, over heads & contractor profit, but excluding seignorage charges and taxes like GST, etc., complete for for finished item of work. (APSS 901 & 903 )

363.6

357

129957.91

... More
Construction of compound wall, operators room, inspection pathways;Raised and cut pointing on coursed or Ashlar stone masonry or concrete block walling in white cement mortar (1 : 3) (1 white cement : 3 marble dust). (APDSS NO.906) excluding seigniorage charges and taxes like GST.

545.4

328

178913.02

... More
Construction of compound wall, operators room, inspection pathways;Plain Cement concrete (M 20) Nominal Mix using 20mm graded metal using concrete mixer - using 20mm HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., including all operational, incidental and labour charges such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & taxes like GST etc. (APSS 402)

9.25

6036

55837.44

... More
Construction of compound wall, operators room, inspection pathways;Providing and fixing 1.2m hight GI Barbed wire fencing with MS Angle post 50x50x6 mm over Brick Masonary and making MS Angle with 45degree bend with holes for fixing of barbed wire and placed MS Angle poles every 3.0m Center to Center in M15 Graded cement concrete 0.3m depth provided 5 ply barbed GI wire horizantal 5 rows and digonal 2 rows with GI staples and painting to MS Angle post etc.,and including cost and conveyance of all material, labour charges and all incedental charges complete.

151.5

943

142994.79

... More
Construction of compound wall, operators room, inspection pathways;Masonry work in CM(1:6) prop with flyash cement solid blocks of size 290x225x140mm with 50kg/sqcm compressive strength for manufacturing of flyash solid blocks using flyash of 80kg, cement of 15kg, Gypsum of 5kg and stone dust including cost and conveyance of all materials, labour charges, seigniorage charges, scaffolding and curing etc., complete with a compressive strength not less than 50kg/sqm for walls for super structure walls. But excluding seigniorage charges and taxes like GST. (APDSS No.508)

63.63

8247

524807.51

... More
Construction of compound wall, operators room, inspection pathways;CRS Masonry - Coursed rubble stone masonry in CM (1:6) 2nd Sort, including cost and conveyance of all matreials to site, all labour charges, curing etc., complete but excluding seigniorage charges & taxes like GST. (APDSS NO.612)

37.8

5552

209899.62

... More
Construction of compound wall, operators room, inspection pathways;PART - D - RAISING OF COMPOUND WALL: Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock, hard disintegrated rock, Conglomerated rock, stoney earth and earth mixed with fair size boulders except Hard rock for foundation of Buildings, Compond Wall as per specifications and drawings and as directed by the departmental officers, including protecting the existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas, with an initial lead of 10 M and with different lifts trenches foundation of Buildings, Compond Wall including all incidental and operational charges etc., complete. Including Back filling

12.6

293

3693.31

... More
Construction of compound wall, operators room, inspection pathways;Carting of surplus excavated materials from site including labour charges for loading and transportation etc, complete. As directed by departmental officers.

579.15

182

105445.84

... More
Construction of compound wall, operators room, inspection pathways;Supply , delivery, placing and fixing of CC kerbing 15 cm thick 0.6 m long, 0.3m depth on formation of road side including cost & conveyance all material labour charges etc., complete

70

300

21000

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403)

26.25

6135

161047.69

... More
Construction of compound wall, operators room, inspection pathways;Supply and filling with gravel in pipe line trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. including cost and conveyance of all materials and labour charges, and contractors profit & over heads but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO. 309 & 310) as directed by the H.M.W.S.&.S. Board Engineers.

81.56

678

55375.98

... More
Construction of compound wall, operators room, inspection pathways;Supply and filling of Crushed stone sand/Rock sand 4.75mm to 2.36 mm as per IS 383 (1970) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost of sand, all operational, incidental, labour charges, complete for finished item of work, including cost and conveyance of all materials and labour charges, and contractors profit & over heads, but excluding seigniorage charges & taxes like GST etc. , complete. (APSS NO. 309 & 310)

26.25

1179

30959.25

... More
Construction of compound wall, operators room, inspection pathways;Earth work excavation in rock for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads etc., but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS 308)

348

1654

575696.4

... More
Construction of compound wall, operators room, inspection pathways;PART-C Leveling of Ground and Road Formation: Earth work excavation in all types of soils for foundations and depositing on bank for all lifts and with an initial lead of 10m, including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc., including cost and conveyance of all material and labour charges, contractors profit & over heads etc., but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO.308) Infornt of 3 ML GLSR site leveling of ground

232

293

68003.84

... More
Construction of compound wall, operators room, inspection pathways;Carting of surplus excavated materials from site including labour charges for loading, unloading and transportation etc ,complete. As directed by departmental officers.

122.1

198

24249.06

... More
Construction of compound wall, operators room, inspection pathways;Manufacutures,supply and delivery of MS chequed plate cover 7mm thick on sluice val chamber size2.9x2.9M using 75x75x6 MS Angle frame,50x50x6mm MS Angle for Support sheet,25x25x3mm MS Angle for cover frame including cost and conveyance of all material, MS Plate,Angles and epoxy paint, labour charges,transportation charges fixing charges etc,complete.

5

75124

375620

... More
Construction of compound wall, operators room, inspection pathways;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG-40/ SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the dept.Including MS flang tapper,cost of nuts,bolts ,rubbering and lowering laying jointing charges etc.complete. b)300mm dia sluice valve

3

101357

304071.81

... More
Construction of compound wall, operators room, inspection pathways;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG-40/ SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the dept.Including MS flang tapper,cost of nuts,bolts ,rubbering and lowering laying jointing charges etc.complete. a)450mm dia sluice valve

3

492116

1476350.34

... More
Construction of compound wall, operators room, inspection pathways;Providing HYSD / TMT steel bars (Fe 500 / Fe550 Grade as per IS 1786 to 1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in positions with cover blocks of approved materials and size and tying and lapse splicings with binding wire of 18 guage forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as over lapse, coupling, chairs, spacer bars, including cost and conveyance of binding wires, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding taxes like GST on all materials etc., complete foer finished item of work in all floors (APDSS No.126). For bars < 36mm dia for reinforcement (APDSS No.126)

3.6

88819

319749.91

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) For sluice val chamber a) For side wall

19.04

10270

195551.65

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) For sluice val chamber a) For floor slab

18.38

10053

184785.54

... More
Construction of compound wall, operators room, inspection pathways;Plain Cement concrete Grade M10 - Nominal Mix upto Plinth level using 40mm HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., including all operational operational, incidental and labour charges such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APSS No.402).

12.25

5311

65064.4

... More
Construction of compound wall, operators room, inspection pathways;Manufacture and Supply of the following dia Mild Steel specials using MS plates conforming to IS 2062- 1992 grade A, manufactured as per IS-3589- 2001 in suitable lengths to suit the site conditions, as directed by the departmental officers including testing at factory for a test pressure of 15 Kg/sqcm., including two coats of epoxy painting of approved make including cost of mild steel plates, epoxy paint, welding rods and other required materials and inclusive of all taxes, and duties and delivery of fabricated pipes to site, loading, unloading and hoisting carefully, lowering the pipes in to ready made trenches or keeping in position on ready built pedestals or supports and laying them true to alingment and gradient and perfect lining by jacking and jointing with three run arc welding and inlining and outcoating of field welded joints with cement mortar as per the above specification inclusive of cost of the jointing materials inclusive of the cost of the necessary testing equipment and other incidental and operational charges etc., complete.ii)300mm dia MS Bend(46-60)

4

5747

22989.28

... More
Construction of compound wall, operators room, inspection pathways;Manufacture and Supply of the following dia Mild Steel specials using MS plates conforming to IS 2062- 1992 grade A, manufactured as per IS-3589- 2001 in suitable lengths to suit the site conditions, as directed by the departmental officers including testing at factory for a test pressure of 15 Kg/sqcm., including two coats of epoxy painting of approved make including cost of mild steel plates, epoxy paint, welding rods and other required materials and inclusive of all taxes, and duties and delivery of fabricated pipes to site, loading, unloading and hoisting carefully, lowering the pipes in to ready made trenches or keeping in position on ready built pedestals or supports and laying them true to alingment and gradient and perfect lining by jacking and jointing with three run arc welding and inlining and outcoating of field welded joints with cement mortar as per the above specification inclusive of cost of the jointing materials inclusive of the cost of the necessary testing equipment and other incidental and operational charges etc., complete. i)300mm dia MS Bend(61-90)

4

8620

34483.92

... More
Construction of compound wall, operators room, inspection pathways;Manufacture, supply and delivery of M.S special conforming to is 3589/2001 including in lining with cement mortar (1:2) 15mm thick using 4 numbers of 6mm dia M.S.Rings at each end of the pipe and out coating with cement mortar (1:3) 30mm thick by shortcreting or gunetting duly providing wire mesh of size 50x50x3mm including cost of all materials, labour charges, transportation to anywhere in Telangana State, Cost of Laying, Jointing, hydrostatic Field Test Pressure -- and factory test presure--, Including Cost of Site Welding, Jointing Materials And Cost of Transportation of Water Including Emptying Pipe Line After Completion Of Field Testing, but excluding all taxes , etc. finished item rate ii)600mm dia MS Tee

1

33555

33555.84

... More
Construction of compound wall, operators room, inspection pathways;Manufacture, supply and delivery of M.S special conforming to is 3589/2001 including in lining with cement mortar (1:2) 15mm thick using 4 numbers of 6mm dia M.S.Rings at each end of the pipe and out coating with cement mortar (1:3) 30mm thick by shortcreting or gunetting duly providing wire mesh of size 50x50x3mm including cost of all materials, labour charges, transportation to anywhere in Telangana State, Cost of Laying, Jointing, hydrostatic Field Test Pressure -- and factory test presure--, Including Cost of Site Welding, Jointing Materials And Cost of Transportation of Water Including Emptying Pipe Line After Completion Of Field Testing, but excluding all taxes , etc. finished item rate i)600mm dia MS Bend (61 -90)

4

41227

164911.4

... More
Construction of compound wall, operators room, inspection pathways;Manufacture and Supply of the following dia Mild Steel pipes using MS plates conforming to IS 2062- 1992 grade A, manufactured as per IS-3589- 2001 in suitable lengths to suit the site conditions, as directed by the departmental officers including testing at factory for a test pressure of 15 Kg/sqcm., including two coats of epoxy painting of approved make including cost of mild steel plates, epoxy paint, welding rods and other required materials and inclusive of all taxes, and duties and delivery of fabricated pipes to site, loading, unloading and hoisting carefully, lowering the pipes in to ready made trenches or keeping in position on ready built pedestals or supports and laying them true to alingment and gradient and perfect lining by jacking and jointing with three run arc welding and inlining and outcoating of field welded joints with cement mortar as per the above specification inclusive of cost of the jointing materials inclusive of the cost of the necessary testing equipment and other incidental and operational charges etc., complete. a) For 300mm dia MS pipe (scour)

45

6247

281119.05

... More
Construction of compound wall, operators room, inspection pathways;Manufacture, supply and delivery of M.S Pipes conforming to is 3589/2001 including in lining with cement mortar (1:2) 15mm thick using 4 numbers of 6mm dia M.S.Rings at each end of the pipe and out coating with cement mortar (1:3) 30mm thick by shortcreting or gunetting duly providing wire mesh of size 50x50x3mm including cost of all materials, labour charges, transportation to anywhere in Telangana State, Cost of Laying, Jointing, hydrostatic Field Test Pressure -- and factory test presure--, Including Cost of Site Welding, Jointing Materials And Cost of Transportation of Water Including Emptying Pipe Line After Completion Of Field Testing, but excluding all taxes , etc. finished item rate i)600 mm dia MS pipe(for over flow)

20

20847

416948

... More
Construction of compound wall, operators room, inspection pathways;Drilling of 25mm dia holes upto a dep th of 900mm for fixing of dowel bars of 20mm dia and filling the holes with cement slurry for fixing of dowel bars in position including cost and conveyance of all materials and hire charges of drilling equipment and labour charges etc., complete including cost of dowel bars.

40

136

5460

... More
Construction of compound wall, operators room, inspection pathways;RBR -FNDN-1 Excavation in Hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting can not be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/ Water supply lines / Foundations including all incidental and operational charges etc., complete, as directed by the HMWS&SB Engineers.

110

3818

419980

... More
Construction of compound wall, operators room, inspection pathways;PART-B SPR HILLS 3 ML Reservoir SV : RBR -FNDN-1 Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete.

12.3

215

2655.57

... More
Construction of compound wall, operators room, inspection pathways;15% Electrifician Charges

1

171671

171671.51

... More
Construction of compound wall, operators room, inspection pathways;110 mm dia - Vent Cowl - UPVC/SWR Pipe fittings

1

24

24.34

... More
Construction of compound wall, operators room, inspection pathways;110 mm dia - Door Bend 87.5 Degree - UPVC/SWR

2

136

272.12

... More
Construction of compound wall, operators room, inspection pathways;110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings

2

106

212.38

... More
Construction of compound wall, operators room, inspection pathways;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C.1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

9520

28561.89

... More
Construction of compound wall, operators room, inspection pathways;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

1

798

798.64

... More
Construction of compound wall, operators room, inspection pathways;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5: prop.including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping.

30

547

16426.2

... More
Construction of compound wall, operators room, inspection pathways;S&F premium make CPVC Pipes of 28.60mm OD Pipe- SDR 11

30

266

7997.4

... More
Construction of compound wall, operators room, inspection pathways;S&F premium make CPVC Pipes of 22.20mm OD Pipe- SDR 11

25

222

5558.5

... More
Construction of compound wall, operators room, inspection pathways;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

1000

9

9960

... More
Construction of compound wall, operators room, inspection pathways;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 660 x 460 mm -Single C.P. Pillar cock

2

4221

8442.14

... More
Construction of compound wall, operators room, inspection pathways;90 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4

1

576

576.3

... More
Construction of compound wall, operators room, inspection pathways;90 mm dia 3 M single Socket PVC/SWR pipe - 4 Kg/sq.cm

2

508

1017.66

... More
Construction of compound wall, operators room, inspection pathways;110 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4

1

704

704.62

... More
Construction of compound wall, operators room, inspection pathways;110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm

3

607

1821.84

... More
Construction of compound wall, operators room, inspection pathways;4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings

2

142

285.38

... More
Construction of compound wall, operators room, inspection pathways;Floor Trap (Bell Mouth ) 110 mm - UPVC/SWR Pipe fittings

3

286

859.47

... More
Construction of compound wall, operators room, inspection pathways;SANITARY ITEMS: Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' ' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern,ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour

2

12750

25501.18

... More
Construction of compound wall, operators room, inspection pathways;Painting with Ready mixed oil paint (all colours) synthetic enamal paint grade 1 for new wood work including cost & conveyance of all meterial etc., complete.

4.2

198

832.15

... More
Construction of compound wall, operators room, inspection pathways;Painting to new walls with 2 coats of plastic / acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. or Equivalent and shade over Priming Coat with Cement Primer Waterbase exterior Gr- 2 (making three coats) on New Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding taxes like GST etc., complete for finished item of work as per SS 912 for external walls.

128.14

292

37524.52

... More
Construction of compound wall, operators room, inspection pathways;Painting to new walls with 2 coats of plastic emulsion/ Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 (making three coats) on New Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., but excluding taxes like GST etc, complete for finished item of work as per SS 911 for internal walls

155.31

211

32775.07

... More
Construction of compound wall, operators room, inspection pathways;Supplying and fixing of Unplasticized Poly Vinyl Chloride(UPVC) Fixed Glazing - 48 series duly manufactured using UPVC reinforced profiles of 60 mm x 48 mm x 2.25 mm for outer frames and the mullion sections are of 60 mm x76 mm x 2.25 mm frames are structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm the sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with EPDM weathering seal resistant including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

0.36

3476

1251.59

... More
Construction of compound wall, operators room, inspection pathways;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows with mesh duly manufactured using UPVC reinforced profiles of 91 mm x49 mm x 2.20 mm for outer frames, 62 mm x 41 mm x2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with 30 mm 15 mm x1.5 mm with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm and the shutter of fly screen with fibre mesh shall be made of size 21mm x 58mm extruded uPVC window profile section of white colour having outer wall thickness of 2.2mm (± 0.3mm) provided with reinforcement of minimum 1.5mm thick G/J/ U/ S/O type GI section duly mitred cut and thermal welded at all corners and prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make & Glazing bead shall be coextruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc.,including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

5.4

8979

48490.54

... More
Construction of compound wall, operators room, inspection pathways;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding Doors duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVCresin) of 60 mm x 45 mm x 2.20 mm with reinforcement of 1.2 mm thickness, super sash with overall size of 39mm x 75 mm x 2.20 mm with for sliding door shutterframes capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50microns of minimum thickness of 1.5 mm prefabricated& welded through fusion welding the door sash shall befitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash &Glazing bead shall be co-extruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of bent handle espagulate.the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation,erection at site complete for finished item of work.

3.15

6706

21125.76

... More
Construction of compound wall, operators room, inspection pathways;Supply and fixing 1000x2100mm MT wood frame and Flush type Doors with 35mm Thick Flush Shutters with Bondwood solid Block Board Type Faced on Both the sides with Commercial Type Plywood (Schedule Item No. 301.)and including hinges,Tower bolts etc.,complete. Doors size 1000x2100 mm

2

23894

47789.8

... More
Construction of compound wall, operators room, inspection pathways;Flooring with Supply of Non-Skid red or white full body Ceramic floor tiles of size 300x 300mm and thickness between 7-8mm 1st quality confirming to IS 3711, IS 13712, IS:13630 (Part 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost conveyance of all materials seigniorage charges, taxes like GST etc. APDSS NO.707

23.04

988

22772.04

... More
Construction of compound wall, operators room, inspection pathways;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600x 600mm and thickness between 8 - 10mm 1st quality confirming to IS 3711, IS 13712, IS:13630 (Part 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost & conveyance of all materials like cement, sand water and tiles etc., complete, for finished item of work, but excluding seigniorage charges, taxes like GST etc. APDSS NO.707

27.9

1316

36723.65

... More
Construction of compound wall, operators room, inspection pathways;Supply and filling with gravel in pipe line trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. including cost and conveyance of all materials and labour charges, and contractors profit & over heads but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO. 309 & 310) as directed by the H.M.W.S.&.S. Board Engineers.

9.45

678

6416.17

... More
Construction of compound wall, operators room, inspection pathways;Plastering to brick masonry wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding seigniorage charges and taxes like GST etc., complete for for finished item of work. (APSS 901 & 904) for uneven surface / outer Walls.

296.56

609

180608.01

... More
Construction of compound wall, operators room, inspection pathways;Plain Cement concrete Grade M20 - Nominal Mix using 20mm HG Machine Crushed graded metal (Coarse aggregate) using 20mm size HG M/c (SS5) metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site including all operational operational, incidental and labour charges, such as, hand mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APSS No.402).

0.2

6135

1227.03

... More
Construction of compound wall, operators room, inspection pathways;Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms as per Table - I of IS:1077-1992 Non-Modular or traditional size 23x11x7cm, having compressive strength not less than 35kg/cm2, including cost & conveyance of all materials and labour charges, centering & scafolding charges, constructing masnory, lift charges, curing, overhead charges & Contractors profit etc., complete. But excluding seignorage chages and taxes like GST. (APSS No.501 & 504) for Super structure.

23.24

9216

214194.95

... More
Construction of compound wall, operators room, inspection pathways;CRS Masonry - Coursed rubble stone masonry in CM (1:6) 2nd Sort, including cost and conveyance of all matreials to site, all labour charges, curing etc., complete but excluding seigniorage charges & taxes like GST. (APDSS NO.612)

6.27

5552

34816.68

... More
Construction of compound wall, operators room, inspection pathways;Providing HYSD / TMT steel bars (Fe 500 / Fe550 Grade as per IS 1786 to 1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in positions with cover blocks of approved materials and size and tying and lapse splicings with binding wire of 18 guage forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as over lapse, coupling, chairs, spacer bars, including cost and conveyance of binding wires, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding taxes like GST on all materials etc., complete foer finished item of work in all floors (APDSS No.126). For bars < 36mm dia for reinforcement (APDSS No.126)

1.9

88819

168756.9

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) vii) Lentes

0.37

13765

5093.26

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) vi) Loft in room

4.28

700

2997.8

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) v) Roof Slab

6.75

6817

46014.89

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) iv) Roof Beam

1.65

12760

21055.45

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) iiii)Plinth Beam

1.44

13022

18751.69

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) ii) Columns

1.05

13955

14653.38

... More
Construction of compound wall, operators room, inspection pathways;Supply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (As per GO Ms No 37 Industries and Commerce (Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403) i)Colum bottom footing

3.89

9987

38851.84

... More
Construction of compound wall, operators room, inspection pathways;Plain Cement concrete Grade M10 - Nominal Mix upto Plinth level using 40mm HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., including all operational operational, incidental and labour charges such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APSS No.402).

4.18

5267

22017.65

... More
Construction of compound wall, operators room, inspection pathways;Earth work excavation in rock for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads etc., but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS 308)

3.8

1654

6286.34

... More
Construction of compound wall, operators room, inspection pathways;Part A - CONSTRUCTION OF OPERATOR ROOM: Earth work excavation in all types of soils for foundations and depositing on bank for all lifts and with an initial lead of 10m, including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc., including cost and conveyance of all material and labour charges, contractors profit & over heads etc., but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO.308)

15.18

293

4449.56



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.