Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Drainage Work
Opening Date24 Feb 2024
Closing Date2 Mar 2024
Tender Amount₹ 1,06,31,023 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of CRS masonry in CM (1:6) prop., With Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018) in 2nd sort using granite stone including cost and covenyance of all materials to site, labour charges, curing, all leads, lifts and all other incidental and operational charges etc., complete as directed by the departmental officers for finished item of work.

3.24

6292

20386.31

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Plain cement concrete M10 Nominal mix (1:3:6) using 6 to 20mm guage graded metal hard granite machine crushed metal including cost and conveyance of all materials coarse and fine agregate (as per GO Ms No. 37 industries and commerce (mines-I) dept, dated 29.05.2018, the government have directed all the Engineering works departmental to use Manufactured sand (Rock sand) and natural river sand in the ratio of 50:50 in all the mises of cement concrete and in the items of works) to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges etc., complete up to plinth level.

67.5

5267

355548.15

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel,stacking, levelling,watering,tamping rolling,all leads,labour charges and other incidental and operatinal charges etc. complete as directed by departmental officers.

1441.77

678

978904.16

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Redoing domestic sewer line connection including EWE in all avialable soils and including supply delivery of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:5:1) prop. Etc. complete.upto 3' diepth abd refilling with water and tampering150 mm dia

20

366

7320

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Redoing domestic sewer line connection including EWE in all avialable soils and including supply delivery of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:5:1) prop. Etc. complete.upto 3' diepth abd refilling with water and tampering100 mm dia

20

272

5458

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Redoing of PPC connections for domestic water supply connection including earth work excavation cost of pipes & fittings such as gate valve, adaptors, couplings, boring and refilling of trench etc., complete as directed by the deptl. Officers 1/2" dia (GI / MDPE)MDPE 3/4" PPC

20

248

4978

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Redoing of PPC connections for domestic water supply connection including earth work excavation cost of pipes & fittings such as gate valve, adaptors, couplings, boring and refilling of trench etc., complete as directed by the deptl. Officers 1/2" dia (GI / MDPE)MDPE 1/2" PPC

20

237

4746

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Supply delivery and filling of quarry dust (50% Rubbish 50% HBG stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking levelling watering tampering rolling all leads labour charges and other incidential and operational charges etc., complete.

216

614

132667.2

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 0.90 mtrs internol diameter sewer manhole for additional depth of 0.10 M with cement bricks in CM 1:4 prop. Internal plastering 20mm think in and external plastering 12mm thick using CM 1:3 prop.

10

1081

10810

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 0.90 mtrs internol diameter sewer manhole minimum depth 1.00 mtrs with cement bricks in CM 1:4 prop. With CC bed 1:4 prop with CC bed 1:3:6 prop. Benching and channel finished with cc 1:2:4 prop. Internal plastering 20mm thick in and external plastering 12mm thick using CM 1:3 prop.

5

14330

71650

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 1.50 M diameter sewer manhole for additional depth of 0.1M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames. for 0.1m additional depth for 3M-4M MH depth

13

2839

36911.42

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 1.50 M diameter sewer manhole for additional depth of 0.1M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames. for 0.1m additional depth for 3M-4M MH depth

10

2552

25525.8

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 1.50 M diameter sewer manhole for additional depth of 0.1M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames. for 4.0m depth

5

102103

510517

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 1.50 M diameter sewer manhole upto 1.80 M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames.for 3.0m depth

2

53460

106921.86

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 1.20 M diameter sewer manhole for additional depth of 0.1M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames. for 0.1m additional depth for 2M-3M MH depth

7

1782

12474.21

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 1.20 M diameter sewer manhole for additional depth of 0.1M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames. for 2.0m depth

2

30580

61161.1

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Construction of 1.20 M diameter sewer manhole upto 1.80 M depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plastering 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames.for 1.5m depth

2

22935

45870.9

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Manufacturing supply & delivery, lowering, laying and jointing of 450mm dial RCC NP4 pipe confirming IS 458-2003 confirming IS 122330-1988 with inner 12mm thick high almina cement confirming to IS 6452 in stsandard laying with socket and spigot ends suitable rubber rings including cost of materials rubber rings, all taxes and duties and delivery to site unloading, lowering carefully in the ready made trenches, laying true to alignment and gradient by using cranes, jointing rubber rings and testing as per speicfications including cost and conveynance of all materials to site, labour charges and other incidental charges etc. complete.450mm dia RCC NP4

300

3140

942000

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete, as directed by the H.M.W.S.&.S. Board Engineers (90DaysX 8 hrs/day X 5 Hp)

720

392

282888

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Barricading hoarding lighting and watching etc. for water supply and sewerge works for trenches including cost of material labour etc. complete as directed by the departmental officers

600

217

130440

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Earth work excavation and depositing on bank in hard rock and boulders more than 3 cum in size requiring control blasting excluding stacking complete as directed by the deptl. Officers including all leads and lifts, all incidential and operational charges etc., and depositing the same on bank with an initial lead of 10Mts lift of 2M etc., complete but excluding dewatering for pipe line trenches (Where the depth is less than 1.5 times width)

1441.77

3818

5504677.86

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;RBR -FNDN-1 Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for GLSR/ pipeline trenches for laying sewer/ Water supply lines including all incidental and operational charges etc., complete. 3.00 Mts to 6.00 Mts depth below GL Where depth is less than 1½ times width With Mechanical Means For Manhole Trenches

136.82

293

40101.94

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;RBR -FNDN-1 Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for GLSR/ pipeline trenches for laying sewer/ Water supply lines including all incidental and operational charges etc., complete. 3.00 Mts to 6.00 Mts depth below GL Where depth is less than 1½ times width With Mechanical Means for pipe line trenches

1042.81

215

225142.68

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Cutting of CC Road surface including labour charges, all leads and other incidential and operational charges tool and plants etc. complete as directed by the deptl. Officers

116.64

2940

342921.6

... More
Shifting of sewerage main line for construction of link road from BRS Bhavan Road No.10;Cutting of BT Road surface including labour charges, all leads and other incidential and operational charges tool and plants etc. complete as directed by the deptl. Officers

116.64

1412

164788.99



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.