Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date18 Feb 2025
Closing Date19 Feb 2025
Tender Amount₹ 4,87,881
Costs
EMD
₹ 4,879Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
576401Tender No
EP.No.295/CGM(E)/O&M C-V/O&M Div-X/2024-25, Dt: 18.02.2025Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Supply delivery and filling quarry dust (in trenches of foundations & basement and the pipeline trenches) with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work .
6.83
644
4402.62
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Construction of 1.50Mx1.50M dia meter sewer manhole upto 3.00 M to 4.00M depth with cement bricks in CM 1:3 prop,and fixing of CI steps and only fixing charges FRC covers and frames as directed by the HMWS&SB Engineers
1
99090
99090
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.for 10HP
720
570
41040
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.for 5HP
360
417
30025.44
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Lowering of 300mm dia SWG Sewer pipes including and conveyacne and all labour charges etc.,For 300mm dia
12
521
6256.8
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Supply and delivery of 300mm dia SWG sewer pipes including cost and conveyacne and all labour charges etc.,For 300mm dia
12
1951
23417.88
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Uprooting of existing 600mm dia RCC UGD SWG sewer pipes including cost and conveyacne and all labour charges etc.,For 600mm dia
12.5
495
6187.5
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Supply, delivery lowering of 600mm dia RCC UGD SWG sewer pipes including cost and conveyacne and all labour charges etc.,For 600mm dia
12.5
4838
60485
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers .
68
234
15959.6
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Engaging hydualic excavator for EWE IN ORDINARY Marshy Soil and incl. refilling incl. hire charges of Hydrualic Excavator, fuels, lebricants, wages of operator other incidental charges etc., (Shovel 0.5 Cum 75HP)
48
2165
103953.6
... More
Construction of Intermediate sewerage manhole on 600mm dia RCC UGD SWG line;Cutting open BT Road with including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.
13.65
1412
19285.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements