Hyderabad Metropolitan Water Supply And Sewerage Board Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Opening Date5 Sep 2019
Closing Date13 Sep 2019
Tender Amount₹ 56,99,475 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation and depositing on banks for manhole 1.2mm dia trenches with an initial lead of 10 m. and lift of 2 m in all available soils including labour charges, all operational and incidental charges etc., complete as directed by the H.M.W.S.& S. Board for manhole trenches.

440.57

108380

246

... More
Provision for cutting of hard sheet rock in blasting probihited area with hammer, chisels etc., including stacking and excavated materials on the bank of trenches with all leads and lifts etc., complete as directed by the H.M.W.S.& S. Board for manhole trenches.

340.3

1063097

3124

... More
Bailing out of water including hire charges of diesel pump set, fuel and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

4800

1267200

264

... More
Barricading, hoarding, lighting and Watching etc., for water supply pipe (WS pipe) line trenches etc., complete as directed by the HMWS&SB Engineers.

1400

180166

128.69

... More
Dismantling and re-construction of CRS masonry in CM (1:6) prop: with available stones including cost and conveyance of all materials, labour charges, curing etc., complete as directed by the H.M.W.S.&.S. Board engineers.

7.56

31774

4203

... More
Lowering, laying of 500mm dia RCC NP3 pipes in readymade trenches true to alignment and gradient, jointing of sewerage pipes with air tight cement joints in cement mortor (1:1) prop, and testing the stone wave glazed pipes for the sewer line including cost of jointing material and labour charges excluding cost of SWG pipes etc., complete as directed by the H.M.W.S.&.S. Board engineers.

150

51150

341

... More
Lowering, laying of 300mm dia RCC NP3 pipes in readymade trenches true to alignment and gradient, jointing of sewerage pipes with air tight cement joints in cement mortor (1:1) prop, and testing the stone wave glazed pipes for the sewer line including cost of jointing material and labour charges excluding cost of SWG pipes etc., complete as directed by the H.M.W.S.&.S. Board engineers.

350

147350

421

... More
Lowering, laying of 250mm dia RCC NP3 pipes in readymade trenches true to alignment and gradient, jointing of sewerage pipes with air tight cement joints in cement mortor (1:1) prop, and testing the stone wave glazed pipes for the sewer line including cost of jointing material and labour charges excluding cost of SWG pipes etc., complete as directed by the H.M.W.S.&.S. Board engineers.

200

75200

376

... More
Construction of 1.2m x 1.2m sewer man-hole upto 1.0m depth with corbelling with cement bricks in CM (1:6) prop: inclusive of CC (1:4:8) prop: using 40mm size hard granite metal with internal plastering 20mm thick in CM (1:3) prop: and external plastering in CM 1:3 Prop: 12mm thick including fine rendering, curing and labour charges, cost of materials and fixing CI steps and fixing charges of FRC covers and frames as per design etc., complete as directed by the H.M.W.S.&.S.Board Engineers.

35

986615

28189

... More
Construction of 0.9m x 0.9m sewer man-hole upto 1.0m depth with corbelling with cement bricks in CM (1:6) prop: inclusive of CC (1:4:8) prop: using 40mm size hard granite metal with internal plastering 20mm thick in CM (1:3) prop: and external plastering in CM 1:3 Prop: 12mm thick including fine rendering, curing and labour charges, cost of materials and fixing CI steps and fixing charges of FRC covers and frames as per design etc., complete as directed by the H.M.W.S.&.S.Board Engineers.

11

138468

12588

... More
Construction of additional 1.2m x 1.2m sewer man-hole upto 0.10m depth with corbelling with cement bricks in CM (1:6) prop: inclusive of CC (1:2:4) prop: using 40mm size hard granite metal with internal plastering 20mm thick in CM (1:6) prop: and external plastering in CM 1:3 Prop: 12mm thick including fine rendering, curing and labour charges, cost of materials and fixing CI steps and fixing charges of FRC covers and frames as per design etc., complete as directed by the H.M.W.S.&.S.Board Engineers.

245

418950

1710

... More
Construction of additional 0.9m x 0.9m sewer man-hole upto 0.10m depth with corbelling with cement bricks in CM (1:6) prop: inclusive of CC (1:2:4) prop: using 40mm size hard granite metal with internal plastering 20mm thick in CM (1:6) prop: and external plastering in CM 1:3 Prop: 12mm thick including fine rendering, curing and labour charges, cost of materials and fixing CI steps and fixing charges of FRC covers and frames as per design etc., complete as directed by the H.M.W.S.&.S.Board Engineers.

165

144045

873

... More
Conveyance of SWG pipes, FRC frames and covers from departmental stores to work site etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

550

25300

46

... More
Manufacture, supply and delivery of 500mm dia Rubber rings to suit RCC socket and spigot pipes confirming o BIS 5382/1985 including cost and conveyance etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

60

14400

240

... More
Conveyance charges of 500mm dia RCC NP3 class spigot and socket pipes form the factory loading, unloading and transportation charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

150

13380

89.2

... More
Supply, laying jointing and testing 100mm SWG 1st class pipes with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) upto 3’ depth and refilling with watering and tamping etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

60

25380

423

... More
Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.

60

12060

201

... More
Supply, delivery and filling quarry dust wherever required as directed by the Deptl officers including cost and conveyance of quarry dust stacking levelling, watering and tamping, rolling all leads labour charges and other incidental and operational charges etc., complete as directed by the HMWS&SB Engineer.

835.39

771064

923

... More
Refilling the pipe line trenches with using excavated soils other than sand with standard specification including watering and tamping in layers of 225mm etc., complete to the finished item as directed by the H.M.W.S.&.S. Board Engineers.

1868.83

65222

34.9

... More
Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers

1028.19

136132

132.4

... More
Manufacture, supply and delivery of 500mm dia RCC NP3 class pipes confirming to BIS 458/2003 at ex-factory , including all taxes and duties and cost excluding conveyance charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

150

321000

2140



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.