Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Drainage Work
Opening Date21 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 12,46,419 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of 250mm dia Sewer connection;Conveyance of 250mm dia SWG pipes from departmental stores of HMWSSB to work site including transportation loading, unloading and stacking etc., all labour incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

270

52

14202

... More
Laying of 250mm dia Sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.

68.6

1081

74156.6

... More
Laying of 250mm dia Sewer connection;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

18

14330

257940

... More
Laying of 250mm dia Sewer connection;Lowering,250mm SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

270

433

116964

... More
Laying of 250mm dia Sewer connection;Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for M/H including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.

7.21

3818

27527.78

... More
Laying of 250mm dia Sewer connection;Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipe lines including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.

27.83

3818

106254.94

... More
Laying of 250mm dia Sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for manhole all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.

72.1

293

21132.51

... More
Laying of 250mm dia Sewer connection;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.

278.33

450

125304.17

... More
Laying of 250mm dia Sewer connection;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.

42.59

2940

125214.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.