Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Opening Date11 Feb 2025
Closing Soon17 Feb 2025
Tender Amount₹ 6,35,922 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Annual Maintenance of Sewerage System;Benching of damaged Sewer manhole frame upto road level CC with 1:2:4 mix using 6mm to 20mm HG metal including cost and conveyance of all materials to site, machine mixing of concrete, laying in position, spreading, levelling, compacting, curing including all labour charges etc complete.as directed by the department officers

6.8

6018

40958.89

... More
Annual Maintenance of Sewerage System;Redoing of 150 mm dia SWG pipes including cost and earth work excavation andd refilling of the trenches including all labour charges etc., complete as directed by the department officers

3

398

1194

... More
Annual Maintenance of Sewerage System;Redoing of 100 mm dia SWG pipes including cost and earth work excavation andd refilling of the trenches including all labour charges etc., complete as directed by the department officers

3

298

894

... More
Annual Maintenance of Sewerage System;Manholes internal plastering 20mm thick in two coats with a bse coat of 16 mm in cm (1:6) prop. and top coat of 4 mm thick in cm(1:4) sqm including cost of all materials complete as directed by the department officers plastering in 20 mm thick (1.2x1.2)

30.66

649

19922.56

... More
Annual Maintenance of Sewerage System;Construction of 1.2M X 1.2M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.

40

2208

88320

... More
Annual Maintenance of Sewerage System;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.

146

1126

164396

... More
Annual Maintenance of Sewerage System;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

2

14944

29888

... More
Annual Maintenance of Sewerage System;Construction of 1.2M X 1.2M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

1

37565

37565

... More
Annual Maintenance of Sewerage System;Labour Charges for fixing of FRC manhole cover its include man & material and exclude the cost of frame and cover as directed by the department officers

25

358

8957.75

... More
Annual Maintenance of Sewerage System;Lowering and Laying in Ready made trenches true to alingment and gradient jointing and testing of stoneware pipes excluding cost of Jointing material such as cement mortar and hemp yarn as directed by the department officers 300 mm dia

20

521

10428

... More
Annual Maintenance of Sewerage System;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

92

234

21592.4

... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For manholes trenches).

21.37

324

6926.02

... More
Annual Maintenance of Sewerage System;Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an intial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For pipeline trenches).

16

497

7964.8

... More
Annual Maintenance of Sewerage System;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.

17.77

2939

52240.25

... More
Annual Maintenance of Sewerage System;Cutting open BT road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.

17.77

1412

25106.34

... More
Annual Maintenance of Sewerage System;Air Compressor 8.5cmm(diesel) Engaged for Earth work excavation hard gravelly soils including all labour charges etc complete.

10

2090

20905

... More
Annual Maintenance of Sewerage System;Shovel 0.85 cum 110 hp (JCB) Engaged Earth work excavation hard gravelly soils including all labour charges etc complete.

10

3557

35577

... More
Annual Maintenance of Sewerage System;Conveyance of 300 mm dia SWG pipes from departmental stores of HMWSSB to work site including transportation loading, unloading and stacking etc., all labour incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

20

20

404



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.