For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Opening Date24 Feb 2025
Closing Soon28 Feb 2025
Tender Amount₹ 39,32,042 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Electrical AMS Works;Removing of induction motors from the pump base frame, removing cable connections, pulley bolts, base bolts by engaging skilled and semi skilled man power.(75HP)

1

5000

5000

... More
Electrical AMS Works;Removing of induction motors from the pump base frame, removing cable connections, pulley bolts, base bolts by engaging skilled and semi skilled man power.(100HP)

1

6500

6500

... More
Electrical AMS Works;Refixing of induction motor on the pump base frame, alignment, couple the pump and motor, reconnection of cables, testing and trail run by engaging skilled and semi skilled man power.(15HP)

1

1500

1500

... More
Electrical AMS Works;Refixing of induction motor on the pump base frame, alignment, couple the pump and motor, reconnection of cables, testing and trail run by engaging skilled and semi skilled man power.(50HP)

3

3500

10500

... More
Electrical AMS Works;Refixing of induction motor on the pump base frame, alignment, couple the pump and motor, reconnection of cables, testing and trail run by engaging skilled and semi skilled man power.(75HP)

1

5000

5000

... More
Electrical AMS Works;Refixing of induction motor on the pump base frame, alignment, couple the pump and motor, reconnection of cables, testing and trail run by engaging skilled and semi skilled man power.(100HP)

1

6500

6500

... More
Electrical AMS Works;To and fro transportation charges for induction motors from site to work shop and work shop to site including loading and unloading charges (15HP)

1

1500

1500

... More
Electrical AMS Works;To and fro transportation charges for induction motors from site to work shop and work shop to site including loading and unloading charges (50HP)

3

3500

10500

... More
Electrical AMS Works;To and fro transportation charges for induction motors from site to work shop and work shop to site including loading and unloading charges (75HP)

1

5000

5000

... More
Electrical AMS Works;To and fro transportation charges for induction motors from site to work shop and work shop to site including loading and unloading charges (100HP)

1

6500

6500

... More
Electrical AMS Works;Dismantling the bilow HP Centrifugal pump set after removing bolts and nuts with lifting the top cover also lifting the rotating element with help of chain pulley coupling and refixing the top cover, sending to workshop from pump house for repair,supply ,Delivery and fixing of suitable bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end), with necessary bearing puller, Supply, delivery fixing an moulding of neck rings , shaft sleeves (Bushes) ,check nuts with as per sample existing size, moulding the material cost of materials and labour charges, milling charges etc and fixing of all oil seals as per the existing size in place of damaged oil seals and Making of Welding , moulding and Balancing of wornout C.I. Impeller in place of pot holes and rusted area , including materials,moulding ,turning finishing charges, complete without any damage of existing Impeller,Reassembling the existing Centrifugal pump set using new bushes,neck rings bearings with cutting new champion paper as packing paper as per sample aligning the set of impeller shaft bearing housings etc fixing the top cover with new bolts , nuts rubber bushes etc., including cost of materials, transport to and fro charges and labour charges etc., complete as directed by the dept. officers.(15HP)

1

18000

18000

... More
Electrical AMS Works;Dismantling the bilow HP Centrifugal pump set after removing bolts and nuts with lifting the top cover also lifting the rotating element with help of chain pulley coupling and refixing the top cover, sending to workshop from pump house for repair,supply ,Delivery and fixing of suitable bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end), with necessary bearing puller, Supply, delivery fixing an moulding of neck rings , shaft sleeves (Bushes) ,check nuts with as per sample existing size, moulding the material cost of materials and labour charges, milling charges etc and fixing of all oil seals as per the existing size in place of damaged oil seals and Making of Welding , moulding and Balancing of wornout C.I. Impeller in place of pot holes and rusted area , including materials,moulding ,turning finishing charges, complete without any damage of existing Impeller,Reassembling the existing Centrifugal pump set using new bushes,neck rings bearings with cutting new champion paper as packing paper as per sample aligning the set of impeller shaft bearing housings etc fixing the top cover with new bolts , nuts rubber bushes etc., including cost of materials, transport to and fro charges and labour charges etc., complete as directed by the dept. officers.(50HP)

4

65000

260000

... More
Electrical AMS Works;Dismantling the bilow HP Centrifugal pump set after removing bolts and nuts with lifting the top cover also lifting the rotating element with help of chain pulley coupling and refixing the top cover, sending to workshop from pump house for repair,supply ,Delivery and fixing of suitable bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end), with necessary bearing puller, Supply, delivery fixing an moulding of neck rings , shaft sleeves (Bushes) ,check nuts with as per sample existing size, moulding the material cost of materials and labour charges, milling charges etc and fixing of all oil seals as per the existing size in place of damaged oil seals and Making of Welding , moulding and Balancing of wornout C.I. Impeller in place of pot holes and rusted area , including materials,moulding ,turning finishing charges, complete without any damage of existing Impeller,Reassembling the existing Centrifugal pump set using new bushes,neck rings bearings with cutting new champion paper as packing paper as per sample aligning the set of impeller shaft bearing housings etc fixing the top cover with new bolts , nuts rubber bushes etc., including cost of materials, transport to and fro charges and labour charges etc., complete as directed by the dept. officers.(75HP)

1

80000

80000

... More
Electrical AMS Works;Dismantling the bilow HP Centrifugal pump set after removing bolts and nuts with lifting the top cover also lifting the rotating element with help of chain pulley coupling and refixing the top cover, sending to workshop from pump house for repair,supply ,Delivery and fixing of suitable bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end), with necessary bearing puller, Supply, delivery fixing an moulding of neck rings , shaft sleeves (Bushes) ,check nuts with as per sample existing size, moulding the material cost of materials and labour charges, milling charges etc and fixing of all oil seals as per the existing size in place of damaged oil seals and Making of Welding , moulding and Balancing of wornout C.I. Impeller in place of pot holes and rusted area , including materials,moulding ,turning finishing charges, complete without any damage of existing Impeller,Reassembling the existing Centrifugal pump set using new bushes,neck rings bearings with cutting new champion paper as packing paper as per sample aligning the set of impeller shaft bearing housings etc fixing the top cover with new bolts , nuts rubber bushes etc., including cost of materials, transport to and fro charges and labour charges etc., complete as directed by the dept. officers.(100HP)

1

90000

90000

... More
Electrical AMS Works;Dismantling of an existing 15Hp Horizental split case pump set, de-couple the motor & Pump by removing pulley bolts and nuts, open the top cover of pump by de-skrew the bolts and nuts. Lifting the rotating assembly, transportation from site to work shop etc, including loading unloading labour charges etc., complete(15HP)

1

2500

2500

... More
Electrical AMS Works;Dismantling of an existing 50 Hp Horizental split case pump set, de-couple the motor & Pump by removing pulley bolts and nuts, open the top cover of pump by de-skrew the bolts and nuts. Lifting the rotating assembly, transportation from site to work shop etc, including loading unloading labour charges etc., complete(50HP)

4

3500

14000

... More
Electrical AMS Works;Dismantling of an existing75Hp Horizental split case pump set, de-couple the motor & Pump by removing pulley bolts and nuts, open the top cover of pump by de-skrew the bolts and nuts. Lifting the rotating assembly, transportation from site to work shop etc, including loading unloading labour charges etc., complete(75HP)

1

6500

6500

... More
Electrical AMS Works;Dismantling of an existing 100 Hp Horizental split case pump set, de-couple the motor & Pump by removing pulley bolts and nuts, open the top cover of pump by de-skrew the bolts and nuts. Lifting the rotating assembly, transportation from site to work shop etc, including loading unloading labour charges etc., complete(100HP)

1

7500

7500

... More
Electrical AMS Works;Refixing the 15 HP Horizental split case pump set using new champion packing paper & fixing the top cover with bolts and nuts and alignment of pump & motor etc . Including transportation from work shop to site, loading, unloading and labour charge etc., complete (15HP)

1

2500

2500

... More
Electrical AMS Works;Refixing the 50 HP Horizental split case pump set using new champion packing paper & fixing the top cover with bolts and nuts and alignment of pump & motor etc . Including transportation from work shop to site, loading, unloading and labour charge etc., complete (50HP)

4

3500

14000

... More
Electrical AMS Works;Refixing the 75 HP Horizental split case pump set using new champion packing paper & fixing the top cover with bolts and nuts and alignment of pump & motor etc . Including transportation from work shop to site, loading, unloading and labour charge etc., complete (75HP)

1

6500

6500

... More
Electrical AMS Works;Refixing the 100HP Horizental split case pump set using new champion packing paper & fixing the top cover with bolts and nuts and alignment of pump & motor etc . Including transportation from work shop to site, loading, unloading and labour charge etc., complete (100HP)

1

7500

7500

... More
Electrical AMS Works;Conveyance charges for transportation charges for HSC pumps from site to work shop and work shop to site including loading and unloading charges.(15HP)

1

1500

1500

... More
Electrical AMS Works;Conveyance charges for transportation charges for HSC pumps from site to work shop and work shop to site including loading and unloading charges.(50HP)

4

3500

14000

... More
Electrical AMS Works;Conveyance charges for transportation charges for HSC pumps from site to work shop and work shop to site including loading and unloading charges.(75HP)

1

5000

5000

... More
Electrical AMS Works;Conveyance charges for transportation charges for HSC pumps from site to work shop and work shop to site including loading and unloading charges.(100HP)

1

6500

6500

... More
Electrical AMS Works;Supply and delivery of new suitable CI flexible coupling for Pumpset duly boring, drilling, threading and fixing with necessary fasteners, including dismantling the existing damaged flexible couplings from Pump-sets without damaging the pump and motor and Re-fixing the new flexible couplings to Pump-set without damaging the pump and motor including material, machining charges and labour charges etc duly after deducting the old material cost, complete as directed by the departmental officers (50HP)

1

19000

19000

... More
Electrical AMS Works;Supply and delivery of new suitable CI flexible coupling for Pumpset duly boring, drilling, threading and fixing with necessary fasteners, including dismantling the existing damaged flexible couplings from Pump-sets without damaging the pump and motor and Re-fixing the new flexible couplings to Pump-set without damaging the pump and motor including material, machining charges and labour charges etc duly after deducting the old material cost, complete as directed by the departmental officers (75HP)

1

22000

22000

... More
Electrical AMS Works;Supply and delivery of new suitable CI flexible coupling for Pumpset duly boring, drilling, threading and fixing with necessary fasteners, including dismantling the existing damaged flexible couplings from Pump-sets without damaging the pump and motor and Re-fixing the new flexible couplings to Pump-set without damaging the pump and motor including material, machining charges and labour charges etc duly after deducting the old material cost, complete as directed by the departmental officers (100HP)

1

25000

25000

... More
Electrical AMS Works;Supply ,Delivery and fixing of suitable motor bearing as per sample in place of damaged for Bearings - 2 Nos (Drive end and Non-drive end) to motor at Pump house with necessary bearing puller, labour charges,including removing the motor bearings cover and removing the damaged motor bearings & refixing the new bearings and pump and motor coupled with pulley coupling, aligning the motor with all new bolts and nuts etc, complete as directed by the dept. officers.after deducting the cost of old materials including materials and labour charges, transport charges etc. ( Work at Site) as per departmental officers directions.(50HP)

1

25000

25000

... More
Electrical AMS Works;Supply ,Delivery and fixing of suitable motor bearing as per sample in place of damaged for Bearings - 2 Nos (Drive end and Non-drive end) to motor at Pump house with necessary bearing puller, labour charges,including removing the motor bearings cover and removing the damaged motor bearings & refixing the new bearings and pump and motor coupled with pulley coupling, aligning the motor with all new bolts and nuts etc, complete as directed by the dept. officers.after deducting the cost of old materials including materials and labour charges, transport charges etc. ( Work at Site) as per departmental officers directions.(75HP)

1

30000

30000

... More
Electrical AMS Works;Supply ,Delivery and fixing of suitable motor bearing as per sample in place of damaged for Bearings - 2 Nos (Drive end and Non-drive end) to motor at Pump house with necessary bearing puller, labour charges,including removing the motor bearings cover and removing the damaged motor bearings & refixing the new bearings and pump and motor coupled with pulley coupling, aligning the motor with all new bolts and nuts etc, complete as directed by the dept. officers.after deducting the cost of old materials including materials and labour charges, transport charges etc. ( Work at Site) as per departmental officers directions.(100HP)

1

40000

40000

... More
Electrical AMS Works;Supply ,Delivery and fixing of suitable pump bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end) to pump set at Pump house with necessary bearing puller, labour charges,including removing the pumpcover rotating element and removing the damaged bearings & refixing the pumpset ( Work at Site) complete as directed by the dept. officers.after deducting the cost of old materials (50HP)

1

16000

16000

... More
Electrical AMS Works;Supply ,Delivery and fixing of suitable pump bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end) to pump set at Pump house with necessary bearing puller, labour charges,including removing the pumpcover rotating element and removing the damaged bearings & refixing the pumpset ( Work at Site) complete as directed by the dept. officers.after deducting the cost of old materials (50HP)

1

28000

28000

... More
Electrical AMS Works;Supply ,Delivery and fixing of suitable pump bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end) to pump set at Pump house with necessary bearing puller, labour charges,including removing the pumpcover rotating element and removing the damaged bearings & refixing the pumpset ( Work at Site) complete as directed by the dept. officers.after deducting the cost of old materials (50HP)

1

35000

35000

... More
Electrical AMS Works;Supply and fixing of pulley bolts and rubber bushes to suit (as per sample) pumpset pulley coupling as per the existing make and size including materials and labour charges, transport charges etc as per departmental officers directions.

75

250

18750

... More
Electrical AMS Works;Supply and ?xing of new terminal blocks in place of worn/burnout out terminal blocks to 50HP squirrel case induction motors as per old sample including labour, to and from transportation charges complete (50HP)

2

4500

9000

... More
Electrical AMS Works;Supply and ?xing of new terminal blocks in place of worn/burnout out terminal blocks to 75HP squirrel case induction motors as per old sample including labour, to and from transportation charges complete (75HP)

1

5500

5500

... More
Electrical AMS Works;Supply and ?xing of new terminal blocks in place of worn/burnout out terminal blocks to 100 HP squirrel case induction motors as per old sample including labour, to and from transportation charges complete (100HP)

1

6500

6500

... More
Electrical AMS Works;Re winding of existing burnout open well submersible pumpset of tanker filling/Boosters and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset of openwell submersible pumpset along with 3 core cable without damaging any accessories and cables including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc other deducting old meterial , complete after(Up to 7.5 HP)

2

18000

36000

... More
Electrical AMS Works;Re winding of existing burnout open well submersible pumpset of tanker filling/Boosters and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset of openwell submersible pumpset along with 3 core cable without damaging any accessories and cables including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc other deducting old meterial , complete after (10HP to 15HP)

2

35000

70000

... More
Electrical AMS Works;Re winding of existing burnout open well submersible pumpset of tanker filling/Boosters and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset of openwell submersible pumpset along with 3 core cable without damaging any accessories and cables including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc other deducting old meterial , complete after (30HP)

2

48000

96000

... More
Electrical AMS Works;Removing of open well submersible pump sets ---HP from reservoirs/booster chambers by removing power cables, nuts & bolts engaging skilled and semi skilled man power, shifting to work shop complete.(Up to 7.5 HP)

2

3500

7000

... More
Electrical AMS Works;Removing of open well submersible pump sets ---HP from reservoirs/booster chambers by removing power cables, nuts & bolts engaging skilled and semi skilled man power, shifting to work shop complete.(10HP to 15HP)

2

5250

10500

... More
Electrical AMS Works;Removing of open well submersible pump sets ---HP from reservoirs/booster chambers by removing power cables, nuts & bolts engaging skilled and semi skilled man power, shifting to work shop complete.(30HP)

2

7800

15600

... More
Electrical AMS Works;Refixing of open well submersible pump sets ---HP in reservoirs/booster chambers by fixing of nuts, bolts, reconnection of power cables, by engaging skilled and semi skilled man power, shifting to the site testing and trail run complete.(Up to 7.50HP)

2

3500

7000

... More
Electrical AMS Works;Refixing of open well submersible pump sets ---HP in reservoirs/booster chambers by fixing of nuts, bolts, reconnection of power cables, by engaging skilled and semi skilled man power, shifting to the site testing and trail run complete.(Up to 15 HP)

2

5250

10500

... More
Electrical AMS Works;Refixing of open well submersible pump sets ---HP in reservoirs/booster chambers by fixing of nuts, bolts, reconnection of power cables, by engaging skilled and semi skilled man power, shifting to the site testing and trail run complete.(30 HP)

2

7800

15600

... More
Electrical AMS Works;Supply of spare parts, repairing, reconditioning, testing and trail run to up to 5 HP vaccume pump sets which includes supply and ?xing of bearings, shaft sleeves, check nuts, gaskets, gland plates, metal ?lling, machining, and other minor parts if any, labour charges, to & from transportation charges.

1

15000

15000

... More
Electrical AMS Works;Substations (Red hills and Boggulakunta): Routine maintenance of transforms in operation covering insulation resistance oil break down strength Reconditioning/replacement of silica gel, cleaing of transformer and topping up to oil level if required and replacement gascates and arresting of oil lekages etc., complete including cost and conveyence of labour charges etc.,

1

20000

20000

... More
Electrical AMS Works;Filteration of 250 KVA Step down transformer oil to 11 KV /3.3 KV step down transformer at Transformer yard including 120 Ltrs oild back filling of top of the with new oil after filteration as per direction of the Deptl officers.

1

30000

30000

... More
Electrical AMS Works;Filteration of 160 KVA Step down transformer oil to 11 KV /3.3 KV step down transformer at Transformer yard including 80 Ltrs oild back filling of top of the with new oil after filteration as per direction of the Deptl officers.

2

25000

50000

... More
Electrical AMS Works;Display of Danger Boards at 11 KV /3.3 KV step down transformer at Transformer yard as per direction of the Deptl officers.

10

500

5000

... More
Electrical AMS Works;Reparing and replacement of spare parts, contact kits for AB Switches of 400Amps with new one and Greasing of AB Switches to operate fuses by 6 pole structure at Transformer yard transformer yard.complete as directed by the dept. officers

2

15000

30000

... More
Electrical AMS Works;Cleaning of transformer yard/Vegitation removal at 11KV/3.3 KV step down transformer at Transformer yard as per directeion of the deptl Officers.

3

12000

36000

... More
Electrical AMS Works;Supply of Cables :- Supply and laying of 3 Core Flat Copper cable as per IS 694:1990 for Submersible Motors.Makes : Finolex / RR Kabel / Havells / L&T complete as directed by the dept. officers (2.5 Sqmm 3 core)

350

137

48006

... More
Electrical AMS Works;Supply of Cables :- Supply and laying of 3 Core Flat Copper cable as per IS 694:1990 for Submersible Motors.Makes : Finolex / RR Kabel / Havells / L&T complete as directed by the dept. officers (4.0 Sqmm 3 core)

200

205

41000

... More
Electrical AMS Works;Supply delivery of service wire WPTC 2 Core for inline booster/Tanker filling station/borewells as per the instructions of departmental officials to bring into the working condition.(6 Sqmm)

400

49

19912

... More
Electrical AMS Works;Supply delivery of service wire WPTC 2 Core for inline booster/Tanker filling station/borewells as per the instructions of departmental officials to bring into the working condition.(10 Sqmm)

100

59

5973

... More
Electrical AMS Works;Supply delivery of service wire WPTC 2 Core for inline booster/Tanker filling station/borewells as per the instructions of departmental officials to bring into the working condition(16 Sqmm.)

100

107

10730

... More
Electrical AMS Works;Rewinding of 7.5 HP bore well submersible motor with new pvc laminated copper wire existing burnout V4 / 7.5 HP up to 40stage submersible pumpset . Dismantling the rotor from the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the pumpset, Repairs to pump such as replacing the wornout impellors bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes machining charges, labour charges etc complete after deducting the old material as per the instructions of dept officers.

8

29000

232000

... More
Electrical AMS Works;Rewinding of 5 HP bore well submersible motor with new pvc laminated copper wire existing burnout V4 / 5 HP up to 40stage submersible pumpset . Dismantling the rotor from the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the pumpset, Repairs to pump such as replacing the wornout impellors bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes machining charges, labour charges etc complete after deducting the old material as per the instructions of dept officers.

20

17000

340000

... More
Electrical AMS Works;a) Removing of V4 5 HP submersible pump set with HDPE pipe along with flat cable in the bore well with necessary equipment and connected the delivery pipe, giving cable connections, test & trail run the motor satisfactorily including hire charges of chainpully ,triye pad ,man and machinery with labour charges etc., complete

20

5500

110000

... More
Electrical AMS Works;b) Re erection of V4 5 HP submersible pump set with HDPE pipe along with flat cable in the bore well with necessary equipment and connected the delivery pipe, giving cable connections, test & trail run the motor satisfactorily with including hire charges of chainpully ,triye pad ,man and machinery with labour charges etc., complete

20

5500

110000

... More
Electrical AMS Works;Removing of V6 7.5/5 HP submersible pump set with 50mm GI pipe along with flat cable in the bore well with necessary equipment and connected the delivery pipe, giving cable connections, test & trail run the motor satisfactorily withincluding hire charges of chainpully ,triye pad ,man and machinery with labour charges etc., complete

8

8500

68000

... More
Electrical AMS Works;Re erection of V6 7.5/5 HP submersible pump set with pipe along with flat cable in the bore well with necessary equipment and connected the delivery pipe, giving cable connections, test & trail run the motor satisfactorily with including hire charges of chainpully ,triye pad ,man and machinery with labour charges etc., complete

8

8500

68000

... More
Electrical AMS Works;Supply ,Delivery and Fixing of New 32/62.5mm non return wall ,Nippals , couplings and etc in place of old damaged including transport and etc as directed by the deptl. Officers

6

2500

15000

... More
Electrical AMS Works;Supply and fixing of powder coated control panel for three phase submersible motors above 5 HP up to 7.5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 63A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete

4

15000

60000

... More
Electrical AMS Works;Supply,delivery and fixing of MS Clamp heavy duty for protection of pump set ,1 1/4 "GI Nipple,Bends,couplings etc., as per site condition including labour charges and transportation charges ,complete as directed by the departmental Engineers

5

500

2500

... More
Electrical AMS Works;Supply , delivery of 40mm 16 Kg/cm2 HDPE pipe heavy duty for fixing of above motor cost of material,transport,labour charges etc. complete after deduction of damaged HDPE pipe transportation charges ,complete as directed by the departmental Engineers

300

206

61800

... More
Electrical AMS Works;Control Panel Spares :- Supply and fixing of MNX 140 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

3

35000

105000

... More
Electrical AMS Works;supply and fixing of MNX 110 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

28000

112000

... More
Electrical AMS Works;supply and fixing of MNX 95 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

19000

76000

... More
Electrical AMS Works;supply and fixing of Thermal relay for 100 HP starter Suitable in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

1

17500

17500

... More
Electrical AMS Works;Supply and fixing of relay for 75HP starter Suitable in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

1

6500

6500

... More
Electrical AMS Works;supply and fixing of Timer for 100 HP starter Suitableunit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

1

8100

8100

... More
Electrical AMS Works;supply and fixing of Timer for 75 HP starter unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

1

7500

7500

... More
Electrical AMS Works;supply and fixing of Timer 50HP unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

3500

14000

... More
Electrical AMS Works;supply and fixing of Single Phase Preventers minilek make unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

12

2500

30000

... More
Electrical AMS Works;supply and fixing of 5HP DOL Starters unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

6

3000

18000

... More
Electrical AMS Works;supply and fixing of 7.5HP Starters unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

4500

9000

... More
Electrical AMS Works;supply and fixing of 63Amps 3 Pole MCB in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

12

3500

42000

... More
Electrical AMS Works;supply and fixing of 32Amps 3 pole MCB in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

12

2500

30000

... More
Electrical AMS Works;supply and fixing of 16Amps single pole MCB in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

12

1500

18000

... More
Electrical AMS Works;supply and fixing of 100/63Amps Cut outs in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

24

390

9360

... More
Electrical AMS Works;Arresting leakages in pump housess by engaging gas cutter sets, welding transformers, welders, helpers, hire charges for the machinery, to and fro transportation charges of machinery without materials complete.

1

15000

15000

... More
Electrical AMS Works;Supply and delivery of 5/8 hardware like nuts bolts, watchers with different sizes etc.,including materials and labour charges, transport charges etc as per departmental officers directions.

25

150

3750

... More
Electrical AMS Works;Supply and transportation of 22W +/ 10% , >/ 2300 lumens, 1200 mm (+/- 10%) length tube LED light housing made with alluminium anodised body, as per SSR speicifications. complete as directed by the dept. officers

50

773

38660

... More
Electrical AMS Works;Supply and transportation of length tube LED light housing made with alluminium anodised body, as per SSR speicifications. complete as directed by the dept. officers (1400mm ceiling fans as per the specification in SSR)

10

3877

38770.6

... More
Electrical AMS Works;Supply and transportation of length tube LED light housing made with alluminium anodised body, as per SSR speicifications. complete as directed by the dept. officers (Supply of Cotton waste)

20

560

11200

... More
Electrical AMS Works;Supply and delivery of 8mm to 18mm asbestace gland rope for preventive maintanance including materials and labour charges, transport charges etc as per departmental officers directions.

15

1150

17250

... More
Electrical AMS Works;Supply,delivery of star pully sets for vaccum pump sets as per sample complete as directed by the dept. officers

6

1200

7200

... More
Electrical AMS Works;Supply,delivery of star rubbers for vaccum pump sets as per sample complete as directed by the dept. officers

12

150

1800

... More
Electrical AMS Works;Supply,delivery of insulation tapes all colors. complete as directed by the dept. officers

80

20

1600

... More
Electrical AMS Works;Supply of MPP type heavy duty capacitor of operating voltage unit in place of existing damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

50

820

41000

... More
Electrical AMS Works;Supply and transportation of ..... LED Street light Body made of high grade pressure die cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Suitable lens on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F 0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 LUMINAIRE MAKE certificates. PHILIPS/OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM/Goldmedal / Silicon Valmont / Leksa / Orient / HPL / Transrail LED MAKE PHILIPS LUMILEDS / CREE / NICHIA/OSRAM/SAMSUNG/ LG LEDS.(72 Watts)

30

5006

150180

... More
Electrical AMS Works;Supply and transportation of ..... LED Street light Body made of high grade pressure die cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Suitable lens on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F 0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 LUMINAIRE MAKE certificates. PHILIPS/OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM/Goldmedal / Silicon Valmont / Leksa / Orient / HPL / Transrail LED MAKE PHILIPS LUMILEDS / CREE / NICHIA/OSRAM/SAMSUNG/ LG LEDS.(100 Watts)

20

7590

151800

... More
Electrical AMS Works;Supply and delivery of tranformer power oil including materials and labour charges, transport charges etc as per departmental officers directions

100

150

15000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.