Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 13,459Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
575215Tender No
EP.No.262/CGM(E)/O&M C-V/O&M Divn-XI/AME Works-WS/2024-25, Dt: 11.02.2025Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550MPA, Paint coating: Regular Modified Polyster painting. Painting thickness(Top): 18 to 20 Microns, (Bottom):5 to 7Microns, sheet width:1.020, Length Maximum 12meters with regular range colours
72
450
32400
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;PCC Grade M15 - Nominal mix (1:2.5:5) (Hand mixing) using 40mm down graded HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., including all operational operational, incidental and labour charges such as, hand mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APSS 402).
16
5985
95766.24
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Plastering to brick masonry wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding seigniorage charges and taxes like GST etc., complete for for finished item of work. (APSS 901 & 904) (CSSR) for Even Surface/ Internal Walls.
75
643
48270
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Brick Masonry in CM (1:4) with Bricks traditional size 23 x 11 x 7 cms 2nd class as per Table - I of IS:1077-1992 Non-Modular or traditional size 23x11x7cm, having compressive strength not less than 35kg/cm2, including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete. But excluding seignorage chages and taxes like GST. (APSS No.501 & 504) for Super structure.
17.25
8684
149799.17
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Fixing of FRC frames and covers including conveyance of materials benching with CC and labour charges etc.,
50
317
15896.5
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Transportation of FRC frames and covers from deptl. Store work site using tractor Hire charges of plant and machinery SSR for the year 2018-19
2
3720
7440
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Cleaning of Drinking water tanks, sumps and reservoir by removing of water from dead storage and letout through necessary dewatering pumpsets and removing of slurry/slurry/algea from the surface of side walls internal columns and bottom floor with pressure pump which disloges the layer of dirt and algea and dirty water and removed by sludge pumpsets collecting and removing of slurry/slurry/debris by lifting and carting away from the site and applying of bleacing powder inside the reservoir of water contact area inc. cost and conveyacne of all materilas and all necesary accessioes like bruches, brooms, spades, buckets, baskets, gloves,masks, helmets, ladder etc.,
2
35000
70000
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Carting the excavated earth which is not useful to refilling the pipe line trenches including 10KM loading,unloading ,incidental and operational labour charges etc.,complete as directed by the H.M.W.S.&.S. Board Engineers.
15.67
186
2929.35
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;CC road restoration(1:2:4) mix with 6mm to 20mm guage hard granite machine crushed metal incl. cost and conveyance of all materials site machine mixing of concrete, lifts, leads, from work laying in position, vibratig compacting, curing all labour charges etc.,
13.92
6018
83783.64
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply delivery and filling quarry dust (in trenches of foundations & basement and the pipeline trenches) with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work .
13.92
644
8972.83
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Making dummy arrangement to following dia on main DI and CI including cost of CI socket tail piece with MS dummy plate and of pig lead spun yarn and cost of jointing material and all labour charges etc. complete For 150mm dia
5
6082
30414.15
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Making dummy arrangement to following dia on main DI and CI including cost of CI socket tail piece with MS dummy plate and of pig lead spun yarn and cost of jointing material and all labour charges etc. complete For 100mm dia
6
3585
21512.16
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Drilling and tapping on CI/DI pipes and fixing of brass crew etc., complete as directed by the deptl. Officers. For 20mm
6
152
913.8
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Drilling and tapping on CI/DI pipes and fixing of brass crew etc., complete as directed by the deptl. Officers. For 15mm
6
132
792
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Redoing of 15/20 mm dia PPC Connections for domestic water supply connection including Earth Work Excavation Cost of MDPE pipes refilling etc complete as directed by the departmental officers For 20mm dia
12
266
3192
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Redoing of 20 mm dia PPC Connections for domestic water supply connection including Earth Work Excavation Cost of MDPE pipes refilling etc complete as directed by the departmental officers For 15mm dia
48
254
12211.2
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Raising, benching and fixing of RCC precast manhole chamber size 36x21? dia at bottom and top with FRC frame and cover and fixing in CC1:4:8 prop along with FRC cover and frame laying CC 1:2:4 prop incl. cost of materilas etc.,
15
6752
101286
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Raising, benching and fixing of RCC precast manhole chamber size 36x21? dia at bottom and top with FRC frame and cover and fixing in CC bed of 1:2:4 prop. etc. complete.
18
6131
110368.8
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply, delivery and fixing of spindle rods with check nut to suit the SV incl. cost of all materilas casting turning, threading and incl. deduction of the weight of old spindle rod etc., complete as directed by the deptl. OfficersFor 300mm dia Joints
3
4910
14731.2
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply, delivery and fixing of spindle rods with check nut to suit the SV incl. cost of all materilas casting turning, threading and incl. deduction of the weight of old spindle rod etc., complete as directed by the deptl. Officers For 200mm dia Joints
5
3273
16368
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply, delivery and fixing of spindle rods with check nut to suit the SV incl. cost of all materilas casting turning, threading and incl. deduction of the weight of old spindle rod etc., complete as directed by the deptl. Officers For 150mm dia Joints
5
2455
12276
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply, delivery and fixing of spindle rods with check nut to suit the SV incl. cost of all materilas casting turning, threading and incl. deduction of the weight of old spindle rod etc., complete as directed by the deptl. Officers. For 100mm dia
3
1636
4910.4
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers For 300mm dia Joints
2
790
1580.4
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board EngineersFor 200mm dia Joints
4
539
2158.8
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers For 150mm dia Joints
6
493
2959.8
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dia Joints
8
334
2674.4
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Manufacture supply delivery and MS pipes fabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office.For 300mm dia 8 mm thick
3
4286
12858.09
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Manufacture supply delivery and MS pipes fabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office. For 200mm dia 8 mm thick
2
3514
7029.12
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Manufacture supply delivery and MS pipes fabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office. For 150mm dia 8 mm thick
2
2617
5235.6
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Manufacture supply delivery and MS pipesfabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office. For 100mm dia 6 mm thick
2
1290
2581.34
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing C.I Pipes and specials LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete For 300mm dia
6
493
2960.4
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing C.I Pipes and specials LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete For 200mm dia
10
385
3855
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing C.I Pipes and specials LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete For 150mm dia
12
349
4196.4
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Jointing C.I Pipes and specials LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete. For 100mm dia
45
280
12618
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply and delivery of Spun Yarn including cost and conveyance etc complete.
16.38
130
2129.4
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply and delivery of Cement including cost and conveyance etc complete
233
5
1165
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board EngineersFor 300mm dia
1
1444
1444.3
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board EngineersFor 200mm dia
2
713
1427.6
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers For 150mm dia
3
432
1298.1
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dia
4
255
1021.2
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Supply and delivery of cast Iron fitting specials confirming to IS:7181/1986, 5531/1988, 3950/1979 & 8794/1988 at site work including all taxes and duties inspection charges etc. complete (The taxes and duties will be paid as per actual on documentary evidence ) For 100/150/200/250/300mm dia Collar
716
77
55153.48
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Bailing of water from the pipeline trenches with oil engine driven pumpset incl. hire charges, fuel charges and wages for pump driver and helper etc., cpmplete as directed by the deptl. Officers.5HP
75
417
6255.3
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Cutting of CI/DI pipes without water in mains including labour charges and all incidental and operational charges etc.,complete as directed by the departmental officers For 300mm dia
2
552
1105.8
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Cutting of CI/DI pipes without water in mains including labour charges and all incidental and operational charges etc.,complete as directed by the departmental officers For 200mm dia
8
368
2948.8
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Cutting of CI/DI pipes without water in mains including labour charges and all incidental and operational charges etc.,complete as directed by the departmental officers For 150mm dia
14
276
3869.6
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Cutting of CI/DI pipes without water in mains including labour charges and all incidental and operational charges etc.,complete as directed by the departmental officers. For 100mm dia
34
147
5011.6
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Barricading,boarding,lighting and watching etc., for water supply pipe line trenches etc.,complete as directed by the departmental officers.
264
234
61960.8
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Hire charges of Air Compressor incl. cost of fuel charges lubricants and wages for operator and helper for CC road cutting and BT road cutting and all operational and incidental charges etc.,8.5cumm disel
25
2090
52262.5
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Engaging of Shovel 0.85 Cum 75Hp (JCB) for earth work excavation hard graveely siols including all labour chargres, wages of driver etc complete as directed by the departmental officers.
18
2165
38982.6
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete.. for Manually
81.36
497
40501.01
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Cutting of CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches.
13.92
2939
40922.02
... More
Annual Maintenance works (Pollution, leakage, Chowkages) for water supply lines;Cutting open B.T. Road surface (as well s ashphalt/concrete upto 75mm thick) including water bound macadam for sewer pipe line trenches and stacking the excavated materials including cost of labour charges etc. complete as directed by the deptl. Officers.
1.74
1412
2458.36
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%