Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date6 Feb 2025
Closing Date12 Feb 2025
Tender Amount₹ 12,69,846
Costs
EMD
₹ 12,698Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574463Tender No
EP- 166/CGM(E)/O and M Circle-IV/2024-25,Dtd: 06.02.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 200mm dia SWG line;Conveyance of SWG pipes from departmental stores to work site including loading unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.(250mm dia SWG pipes)
220
20
4444
... More
Laying of 200mm dia SWG line;Construction of 0.90 M X 0.90 M sewer manhole for additional depth of 0.10m with cement bricks in CM 1:6 Prop. Benching with CC 1:2:4 Prop. Internal plastering 20mm thick in CM 1:3 Prop. and external plastering 12mm thick in CM 1:6 Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and Frames as directed by the HMWSSB Engineers.
63
1126
70938
... More
Laying of 200mm dia SWG line;Construction of 0.90 M X 0.90 M sewer manhole upto 1 M depth with cement bricks in CM 1:6 Prop. With CC bed 1:6 Prop with CC Bed 1:4:8 Prop. Benching with CC 1:2:4 Prop. Internal plastering 20mm thick in CM 1:3 Prop. and external plastering 12mm thick in CM 1:6 Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and Frames as directed by the HMWSSB Engineers.
21
14944
313824
... More
Laying of 200mm dia SWG line;Lowering the 200mm dia SWG pipes carefully into the Ready made trenches true to alingment and gradient jointing with cementr (1:1) prop; excluding cost of SWG pipes but including curing , testing and Jointing of material such as hemp yarn and cement mortar with all other operatioanl and incidental charges etc complete as directed by the HMWSSB Engineers.(200mm dia SWG Pipes)
220
375
82632
... More
Laying of 200mm dia SWG line;Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock as directed by the dept officers, including all leads and lifts all incidental and operational charges etc and depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering etc., complete as directed by the HMWSSB Engineers (for pipe line trenches where depth is less than 1.5 times the width) ( for M/H depth)
109.2
324
35391.72
... More
Laying of 200mm dia SWG line;Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock as directed by the dept officers, including all leads and lifts all incidental and operational charges etc and depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering etc., complete as directed by the HMWSSB Engineers (for pipe line trenches where depth is less than 1.5 times the width) ( for pipeline depth)
344.19
497
171337.78
... More
Laying of 200mm dia SWG line;Cutting open CC road with including labour charges, all leads and other incidental and operational charges tools and plants etc complete to the finished item of work as directed by the HMWS&SB Engineers.( for pipeline , depth , for M/H, Depth)
52.08
2939
153104.78
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements