Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 2,154Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
561983Bid Award Id
ViewTender No
EP.No.152/CGM(E)/O&M C-V/O&M Div-II/2024-25, Dt: 11.12.2024Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Lowering the CI/DI(K7) Pipes and specials S/S ends LA class excluding cost of CI pipes specials and carefully into the pipeline trenches and laying them true to alignment and gradient including labour charges and all incidental and operational charges to work site etc., as directed by departmental officers. For 100mm dia DI K7 Pipes
100
64
6460
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. For Pipelines by manual means
82.04
497
40839.51
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Cutting C.I. / D.I. pipes without water in mains without water in the main but including cost of implement and all labour charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers For 100mm dia
2
147
294.8
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dia Svs
2
255
510.6
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Plain Cement Concrete (1:2:4) Nominal Mix using 20mm HG Machine Crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., to site including all operational operational, incidental and labour charges, such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APSS No.402), as directed by HMWS&SB Engineers
10.5
6018
63198.87
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Redoing of 15 mm dia PPC Connections for domestic water supply connection including Earth Work Excavation Cost of MDPE pipes refilling etc complete as directed by the departmental officers For 15mm dia
43.2
254
10990.08
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Supply and fixing of precasted RCC manhole chamber having the size of 36" at bottom 21" dia at top with tappers exluding cost of FRC cover and frame and inlcuding laying in CC (1:2:4) prop. Incuding cost of materials, labour charges, curing coveyance etc., complete as directed by the H.M.W.S.&. S. Board Engineers.
2
6752
13504.8
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Supply and delivery of Spun Yarn including cost and conveyance of all materials and all laobur chares, all incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1.08
130
140.4
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Barricading, Hoarding, lighting and wathcing etc. for water supply pipe line trenches etc. complete as directed by the HMWS&SB officers.
100
234
23470
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Jointing the CI/DI (K7) pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jointing materials such as rubber gasket and filling with water and testing to required field pressure of 8kg/Sqcm, including labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 150mm dia Joints
23
178
4103.2
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Jointing the CI/DI (K7) pipes and specials with S/S ends excluding cost of jointing materials such as cement and hump yarn leed wool, lead etc., but including sundries such as cost of fuel for field test meting lead, filling with water and testing to required pressure including labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dia
6
280
1682.4
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dias Svs
4
334
1337.2
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Carting away surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidental and operational charges etc. complete.
11.29
186
2110.55
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Cutting open CC Road with including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.
10.5
2939
30867.9
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Supply and delivery of Cement of best quality including cost and conveyance, all incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers
13.2
6
79.2
... More
Extension laying of 100mm dia DI WS pipes with 100mm dia DI WS pipes from Syeed Mobile shop;Conveyance of DI pipes from departmental stores to work site, including loading, unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
1.73
1677
2902.07
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements