Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Agriculture or Forestry Works
Opening Date13 Jul 2024
Closing Date18 Jul 2024
Tender Amount₹ 9,94,85,595 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Maintanance of Hedge/Shrub planting Trimming hedges/Shrubs once in 15days watering hedges/shrubs once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) only during non - rainy days Formation of basins 1ft away from the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.,

3632.44

2930

1277510.26

... More
Item;-

-

-

-

... More
Item;Hedge & Tab Buliding and Rotaries:

-

-

-

... More
Item;Maintenance of Avenue and shrub Plantations,TAB Bulidings on ORR Interchanges Kandalakoya

-

-

-

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.

17597

216

457296.76

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant (December)

17597

482

84960.08

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant(November)

17597

160

28320.61

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (August)

17597

482

84960.08

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(July)

17597

160

28320.61

... More
Item;Cost of water to Plants through tankers for waterings 5000 Ltrs each trip capacity 5 trips per day 20 Ltrs per plant in each watering from

450.48

3352

1010154.83

... More
Item;2nd Year Maintenance of Avene Plants on Service Roads, Foot Paths & Railway Corridior on ORR (2022 Planting) service road =17597Nos

-

-

-

... More
Item;Maintenance of Avenue Plantations on ORR Service roads, Railway corridor & Foot Paths from (43 km to52 km)

-

-

-

... More
Item;Cost of Chemicals

-

-

108000

... More
Item;Tractor provision for lift the Trimming material

1

32000

384000

... More
Item;ORR Main Carriage way (4 times) Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total MCW area=2.5widthx2sidesx18700 =93500sqmts MCW shrubs =51467x(22/7)x0.30x0.30=14557 Sqmt. MCWAvenue =21195x(22/7)x0.50x0.50=16653 Sqmt. Total area=93500-14557-16653=62290 sqmts

31145

66

83157.15

... More
Item;Central Median Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total Cenral median area=4.50widthx18700 =84150 sqmts Individual shrubs=11257x(22/7)x0.30x0.30=3184 Sqmt. Hedge=14130sqmts. Empty area=18700x0.30x2=11220sqmts Total area=84150-3184-14130-11220=55616 sqmts(4 times)

27808

65

73135.04

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant (December)

4285

482

20688.41

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant(November)

4285

160

6896.28

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (August)

4285

482

20688.41

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(July)

4285

160

6896.28

... More
Item;Cost of water to plants through tankers for watering 5000 ltrs wach trip capacity 5 trips per day 20 liters per plant in each watering ( 48 watering) 4285x20x12/25000=82.27 days

109.7

3352

367733.9

... More
Item;43 Km -52KM = 4285 Nos

-

-

-

... More
Item;2nd year Maintenane of MCW Avenue Plantation from Dundigal to kandalakoya(43 Km to 52km)

-

-

-

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from Trimming hedges/Shrubs once in 15days watering hedges/shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)Formation of basins 1ft away from the hedge

23228

201

561931.78

... More
Item;43-52 =11377+8000+3851=23228 Nos

-

-

-

... More
Item;MCW Shrubs Miantenance Dudigal to kandalakoya(43 Km to 52km)

-

-

-

... More
Item;Maintanance of Hedge/Shrub planting Trimming hedges/Shrubs once in 15days watering hedges/shrubs once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)APRIL-2024 TO June-2024 only during non - rainy day sFormation of basins 1ft away fro m the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.,

8100

1318

1281931.92

... More
Item;43-52 =8100 Sqmt,

-

-

-

... More
Item;Cost of water to plants through tankers for watering 5000 ltrs each trip capacity 5 trips per day 15 ltrs per plant in each watering 12393x5x15/25000=74.35 x 3 months = 223.07 days

446.15

3352

1095622

... More
Item;With Manual Watering Old Palnts 5270 Nos New Plants = 19516

12393

444

660507

... More
Item;Individual shrubs: Trimming shrubs once in 15days watering shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) Formation of basins 1ft away from the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc .With manual Watering

6548

201

158409

... More
Item;43-52 =6548 Nos 1st year Maintenance of Individual Shrubs with Manual watering - 5270 Nos

-

-

-

... More
Item;ORR Central Median from Dudigal to kandalakoya(43 Km to 52km)

-

-

-

... More
Item;Maintanance of ORR Central Median & MCW from Dundigal to Kandalakoya (43 Km to 52 km)

-

-

-

... More
Item;Providing supervisory assistance for technical works on contract basis Malampet Interchange

1

9320

111840

... More
Item;Malampet Interchange Lamco pats & Rectangle pots=108Nosx10x15/25000=0.64x12months =7.68days

-

-

-

... More
Item;Shrubs=20826x5x15/25000=62.47x12 =749.64Days

-

-

-

... More
Item;Gound cover=997x10x28/25000=11.16x12 =133.92Days

-

-

-

... More
Item;Hedge=5890.99x5x28/25000=32.98x12 =395.76Days

-

-

-

... More
Item;Lawn=4710.83x10x28/25000=52.76x12 =633.13Days

-

-

-

... More
Item;Cost & Supply of Water through water tanker for watering (6Moths)(Bacto CFS,VUP's,Ramki oppt main road Bit,1Km Bit at Patancheru interchange)Malampet Interchange

1920.13

3352

5436852

... More
Item;G.TOTAL(A+B+C)=2707+5675+15578Nos =23960Nos

19982

-

-

... More
Item;Total(C) =15578Nos

-

-

-

... More
Item;Sulthapur=20 Nos

-

-

-

... More
Item;Ramp-IV=4131Nos(Tanker watreing)

-

-

-

... More
Item;Ramp-III=3643Nos(Tanker watreing)

-

-

-

... More
Item;Ramp-II=3703Nos(Tanker watreing)

-

-

-

... More
Item;Ramp-I=4081Nos (Tanker watreing)

-

-

-

... More
Item;C.Malampet Interchange(2023)

-

-

-

... More
Item;Total=109+61+444+5061=5675Nos

5675

-

-

... More
Item;iv,VUP's=5061 Nos

-

-

-

... More
Item;iii.Sump room Back side=444Nos(Tanker watreing)

-

-

-

... More
Item;ii.Namaste Symbol=61Nos(Tanker watreing)

-

-

-

... More
Item;i.Bacto CFS =109Nos

-

-

-

... More
Item;B.New Development at Patancheru interchange

-

-

-

... More
Item;Total(i+ii+iii)=466+1411+830=2707nos

-

-

-

... More
Item;Sulthapur interchange : i. Sulthanpur Interchange (VUP1 & VUP2) =830 Nos

830

-

-

... More
Item;Dundigal: i. (Bit-I Towards Medchal road to Patancheru road 43km )-(Bit-II Towards Dundigal to Medchal road Ramp)=2Nos ii.(Towards Dundigal to Medak Road Triangle BIT)=3Nos iii.(Towards Patancheru road to Medchal Road Down Ramp)=6Nos iv. ( Towards Dundigal to Patancheru VUP1,VUP 2 and VUP 3 Central median =100Nos v.Dundigal TAB = 1300 nos vi.Dundigal interchange Shrubs=11600nos Total(ii)=2+3+6+100+1300=1411Nos

13011

-

-

... More
Item;Patancheru: i.ORR Patancheru Interchange Trainagle bit=33Nos ii.Down Ramp of Patancheru Interchange =57Nos iii.ORR Exit No.-3 Towards Patancheru=14Nos v.Central Median from Muthangi to Patancheru Road=264Nos iv. 1Km Bit=98 Nos Total(i)=33+57+14+264+98=466Nos

466

-

-

... More
Item;A.Old Development:

-

-

-

... More
Item;Maintenance of Individual shrus : a) Trimming once in 15 days b) Watering once in alternate day 5 lts per plant per day sub soil moistue shall be maintened conenuesly the watering shall be carried out daily during non-rainy days c) Formation of basins each and every plant upto 1 feet away from the plant d) Application of fertilizers and pesticides etc. with mannual watering

23960

444

1276991

... More
Item;G.TOTAL(A+B)=1352+616=1968Sqmts

-

-

-

... More
Item;Total(ii)=195+378+43=616Sqmts

-

-

-

... More
Item;iii.Sump room Back side=43Sqmts(Tanker watreing)

-

-

-

... More
Item;ii.Namaste Symbol=378Sqmts(Tanker watreing)

-

-

-

... More
Item;i.Bacto CFS =195 Sqmts

-

-

-

... More
Item;B.New Development at Patancheru interchange

-

-

-

... More
Item;A.Old Development: : Patancheru Interchange=550Sqmts 1KM Bit=802Sqmts Total(i)=550+802=1352Sqmts

-

-

-

... More
Item;Maintenance of ground covers: Watering @ 10 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously) The watering shall be carried out DAILY during non rainy days, weeding, trimming and keeping the ground cover in healthy condition With Manual watering

1968

924

218238

... More
Item;G.TOTAL(A+B+C)=7061.18+5328+2284.14= 14673.32Sqmts

-

-

-

... More
Item;Total(C) =2284.14Sqmts

-

-

-

... More
Item;Sulthapur 290.15 Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-IV=296.74Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-III=908.89Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-II=345.12Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-I=443.24Sqmts (Tanker watreing)

-

-

-

... More
Item;C.Malampet Interchange(2023)

-

-

-

... More
Item;Total=1507+1375+691+1162+593=5328 Sqmts

-

-

-

... More
Item;v,VUP's=593 sqmts

-

-

-

... More
Item;iv. Romki oppt.main road=1162SQmts

-

-

-

... More
Item;iii.Sump room Back side=691Sqmts(Tanker watreing)

-

-

-

... More
Item;ii.Namaste Symbol=1375Sqmts(Tanker watreing)

-

-

-

... More
Item;i.Bacto CFS =1507 Sqmts

-

-

-

... More
Item;B.New Development at Patancheru interchange (2022)

-

-

-

... More
Item;Total(i+ii+iii)=2385.27+4045.91+630 =7061.18Sqmts

-

-

-

... More
Item;Sulthapur interchange i. Sulthanpur Interchange(VUP1 & VUP2) =630Sqmts

630

-

-

... More
Item;Dundigal Interchange: i. (Bit-I Towards Medchal road to Patancheru road 43km )-(Bit-II Towards Dundigal to Medchal road Ramp)=31Sqmts ii.(Towards Dundigal to Medak Road Triangle BIT)=975Sqmts iii.(Towards Patancheru road to Medchal Road Down Ramp)=45 Sqmts iv. ( Towards Dundigal to Patancheru VUP1,VUP 2 and VUP 3 Central median =590Sqmts V.Dundigal TAB = 100 sqmts Vi.Gandimaisamma Rotary=1345.50sqmts Vii.Narsapur Rotary=959.41 Total(ii)=31+975+45+590+100+1345.50+959.41 =4045.91Sqmts

4045.91

-

-

... More
Item;Patancheru Interchange: i.ORR Patancheru Interchange Trainagle bit=315Sqmts ii.Down Ramp of Patancheru Interchange =119Sqmt iii.Patancheru Interchange under bridge of VUPs=195 iv.ORR Exit No.-3 Towards Patancheru=90Sqmts v.Central Median from Muthangi to Patancheru Road=770Sqmts vi. 1Km Bit=635Sqmts vii. Patancheru TAB=261.27Sqmts Total(i)=315+119+195+90+770+635+261.27 =2385.27Sqmts

2385.27

-

-

... More
Item;A.Old Development:

-

-

-

... More
Item;Maintenance of hedge: i)Trimming of hedges / shrubs once in 15 days. ii)Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii)Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,

14673.32

2930

5160530

... More
Item;G.TOTAL(A+B+C)=6046.14+2243+2011.47=10300.61SQmts

-

-

-

... More
Item;Total(C) =2011.47Sqmts

-

-

-

... More
Item;Sulthapur 45.64 Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-IV=364.42Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-III=760.47Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-II=394.88Sqmts(Tanker watreing)

-

-

-

... More
Item;Ramp-I=446.06Sqmts(Tanker watreing)

-

-

-

... More
Item;C.Malampet Interchange(2023)

-

-

-

... More
Item;Total=465+1023+755=2243 Sqmts

-

-

-

... More
Item;iii.Sump room Back side=755Sqmts(Tanker watreing)

-

-

-

... More
Item;ii.Namaste Symbol=1023Sqmts(Tanker watreing)

-

-

-

... More
Item;i.Bacto CFS =465 Sqmts

-

-

-

... More
Item;B. Development at Patancheru interchange(2022)

-

-

-

... More
Item;Dundigal interchange: i. (Bit-I Towards Medchal road to Patancheru road 43km )-(Bit-II Towards Dundigal to Medchal road Ramp)=315Sqmts ii.(Towards Dundigal to Medak Road Triangle BIT)=235Sqmts iii.(Towards Patancheru road to Medchal Road Down Ramp)=109Sqmts iv. ( Towards Dundigal to Patancheru VUP1,VUP 2 and VUP 3 Central median =140Sqmts V.Dundigal TAB = 125 sqmts ViGandimaisamma Rotary=511.27sqmts Vii.Narsapur Rotary=513.10 Total-II= 315+235+109+140+125+511.27+513.10 =1948.37Sqmts TOTAL(i+II)=(4097.77+1948.37)=6046.14SQmts

-

-

-

... More
Item;Patancheru Interchange: i.ORR Patancheru Interchange Trainagle bit=770Sqmts ii.Down Ramp of Patancheru Interchange =650Sqmt iii.ORR Exit No.-3 Towards Patancheru=230Sqmts iv. 1Km Bit=2280Sqmts V.Patancheru TAB=167.77 Sqmts Total-I =770+650+230+2280+167.77 =4097.77 Sqmts

-

-

-

... More
Item;A. Old Development :

-

-

-

... More
Item;Maintenance of lawns: (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers with Manual watering

10300.61

924

1142268

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.

21180

360

617365.1

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant (December)

21180

482

102259.16

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant(November)

21180

160

34087.09

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (August)

21180

482

102259.16

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(July)

21180

160

34087.09

... More
Item;Cost & Supply of Water through water tanker for Watering the plants for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) =21180x20x48/25000=813.31

813.31

3352

2026459.11

... More
Item;1st year Maintenance of Avenue Plantaion on ORR (2023planting) ORR Inner Side patancheruvu Interchange(Oppt Ramky One Symphony Constructions) total=21180Nos

-

-

-

... More
Item;Maintenance of Avenue and shrub Plantations,TAB Bulidings on ORR Patancheru,Sulthapur & Dundigal Interchanges

-

-

-

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth. 2 months Rate =721.88X50%=360.94

90599

360

3524096.37

... More
Item;Application of fertilizers (2 doses)

90599

114

103473.12

... More
Item;Cost of chemicals and fertilizers 20 grams per pit (2 doses)

90599

-

90599

... More
Item;Protection 1styear+2nd year =153780+36879=190659Nos

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant (December)

53720

482

259365.53

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant(November)

53720

160

86456.97

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (August)

53720

482

259365.53

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(July)

53720

160

86456.97

... More
Item;Cost & Supply of Water through water tanker for Watering the plants for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering)

1375.23

3352

5010190.23

... More
Item;2ndyear Maintenance of Avenue Plantaion on ORR (2022planting) SR,22 km to 31Km =43260Nos, SR,31km to 43KM=10460Nos, Total= 43260+10460=53720Nos

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant (December)

36879

482

178055.5

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant(November)

36879

160

59353.06

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (August)

36879

482

178055.5

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(July)

36879

160

59353.06

... More
Item;Cost & Supply of Water through water tanker for Watering the plants for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) =36879x48/25000=1416.15

1416.15

3352

3747371.71

... More
Item;1st year Maintenance of Avenue Plantaion on ORR (2022planting) In SR,26km to 38Km =3180Nos, RC 22km to 31Km =21320 Nos 36km to 38 KM=12379 nos =33699Nos total=36879Nos

-

-

-

... More
Item;Maintenance of Avenue Plantations on ORR Service roads, Railway corridor from Patancheru to Dundigal (22 km to 43 km)

-

-

-

... More
Item;Cost of Chemicals

-

-

252000

... More
Item;Tractor provision for lift the Trimming material

1

32000

384000

... More
Item;ORR Main Carriage way (2times) Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total MCW area=2.5widthx2sidesx21000 =105000sqmts MCW shrubs =59069x(22/7)x0.30x0.30=16713.75Sqmt. MCWAvenue = 42101x(22/7)x0.50x0.50=33079.36Sqmt. Total area=105000-16713.75-19521.56 =55206.90Sqmts

55206.9

65

145194

... More
Item;Central Median(2times) Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total Cenral median area=4.50widthx21000 =94500 sqmts Individual shrubs=59228x(22/7)x0.30x0.30=16753.06Sqmt. Hedge=18240sqmts. Empty area=21000x0.30x2=12600sqmts Total area=94500-5271.61-18240-12600 =46906.94sqmts

46906.94

65

123365

... More
Item;Maintenance of Individual shrus: i.Patancheru=300nos ii.Dundigal=450+150+1305+121=2026Nos iii. Ptancheru interhange Up & down Ramps Crash Guard side 2021-22 Planting=1140 Nos Sub Total=3466nos a) Trimming once in 15 days b) Watering once in a day 5 lts per plant per day sub soil moistue shall be maintened conenuesly the watering shall be carried out daily during non-rainy days . c) Formation of basins each and every plant upto 1 feet away from the plant d) Application of fertilizers and pesticides etc. with Manual watering (2 Months)

3466

201

83849

... More
Item;Maintenance of hedge planting i.Patancheru=508sqmts i)Trimming of hedges / shrubs once in 15 days. ii)Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii)Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., With Drip system (2 Months)

508

1318

80400

... More
Item;Maintenance of lawns: i.Patancheru=523+345=868Sqmts ii.Dundigal=355+350=705 sqmts (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (i) June to November -once in 15 days (ii) December to may once in -30 days (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers with Manual watering (2Months)

1573

302

57081

... More
Item;Miaintenanace of Up and down Ramps from Patancheru to Dundigal ( 22km to 43 km)

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant (December)

31641

482

152765.91

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant(November)

31641

160

50923.03

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (August)

31641

482

152765.91

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(July)

31641

160

50923.03

... More
Item;Cost & Supply of Water through water tanker for Watering the plants for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) 31641x20x32/25000=810Days

810

3352

3515363

... More
Item;22-43=14386+17255Nos =31641Nos

-

-

-

... More
Item;2nd year(2022-23Plantaing) Maintenane of MCW slops Avenue Plantation from Patancheru(22km) to Dudigal (43km)

-

-

-

... More
Item;Individual shrubs: Trimming shrubs once in 15days watering shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) Formation of basins 1ft away from the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc With Drip

59069

201

1428997.25

... More
Item;22 to 31 =14464Nos, 31-43 = 33154Nos Total=47618Nos Raising (2022--23)22km to43km=9451 Nos, ORR 33km to 34Km inner side(Creepers)=2000Nos Total=11451Nos, G.Total= 47618+11451

-

-

-

... More
Item;MCW Shrubs Miantenance from Patancheru to Dundigal (22 Km to 43 km)

-

-

-

... More
Item;Maintanance of ORR MCW from Patancheru to Dundigal (22 Km to 43 km)

-

-

-

... More
Item;Maintanance of Hedge planting Trimming shrubs once in 15days watering shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) Formation of basins 1ft away from the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc With Drip

18240

1318

2886720.77

... More
Item;22-31 = 7440Sqmts , 31 to-43 = 10800 Sqmts Total=18240 Sqmts

-

-

-

... More
Item;Cost & Supply of Water through water tanker for watering one in Alternate Day /per plants 43141x5x15/25000=129.42x12Months= 1553.04Days

1553.04

3352

5206256

... More
Item;Maintanance of Individual shrubs: (Plumeria pudica) Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from Trimming shrubs once in 15days watering shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) Formation of basins 1ft away from the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc .With manual Watering

43141

444

1899277

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from Trimming shrubs once in 15days watering shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) Formation of basins 1ft away from the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc. I.With Dirp

16087

201

389177

... More
Item;Maintanance of Individual shrubs:(Pagada ,Ganeru)

-

-

-

... More
Item;22 to31 =6345 Nos, 31-43 = 8071 Nos Total=14416Nos (2022-23 Plantsing) 22 to 43=1671(Pogada)+2550(Plumeria pudica)=4221Nos (2023-24 Plumeria pudica ) 22 to 31=16834Nos, 31 to43Km =23757Nos,Total =40591Nos

-

-

-

... More
Item;ORR Central Median from Patancheru to Dundigal (22 Km to 43 km)

-

-

-

... More
Item;Maintanance of ORR from Patancheru to Dundigal (22 Km to 43 km) from April-2024 to March-2025 (12 Months)

-

-

-

... More
Item;Maintenance of Hedge/Shrub Planting: i) Trimming of hedges once in 15 days ii) Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) iii) Formation of basins for each and every plant upto 1 ft away from the plant iv) Application of fertilizers, insecticides, fungicides etc a) with manual watering i) 0 K to 2 Km = 2419.97 Sq.Mtrs ii) 2 Km to 4 Km = 2988.12 Sq.Mtrs iii) 4 Km to 6 Km = 2915.82 Sq.Mtrs iv) 6 Km to 8 Km = 2645.12 Sq.Mtrs v) 8 Km to 9 Km= 1392 Sq.Mtrs vi) 9 Km to 10 Km = 1394.81 Sq.Mtrs vii) 10 Km to 11 Km = 1474.98 Sq.Mtrs viii) 11 Km to 12 Km = 1454 Sq.Mtrs ix) 12 Km to 13.5 Km = 2334.14 Sq.Mtrs

19018.96

2930

6688869.33

... More
Item;Estimate for Maintenance of Greenery and Landscape work on Cycle Track from 0 Km to 14 Km Service Road on ORR During the year 2024-25 of Forest Manager-IV

-

-

-

... More
Item;Cost of water through tankers in alternate days for shrubs of 25000 Ltrs each trip capacity 5 trips per day (Cycle Track Shrubs at Kokapet Interchange) 50x5x15/25000= 0.15x12 Months= 0.45 days

1.8

3352

6034.14

... More
Item;Maintenance of Individual shrus : a) Trimming once in 15 days b) Watering once in a day 5 lts per plant per day sub soil moistue shall be maintened conenuesly the watering shall be carried out daily during non-rainy days c) Formation of basins each and every plant upto 1 feet away from the plant d) Application of fertilizers and pesticides etc. with mannual watering => Kokapet: i.TAB=84nos ii.Interchange=466Nos total=550Nos => Kollur: i.Interchange=20Nos Cycle Track at Kokapet interchange= 50 Nos Total=550+20+50=620Nos

620

444

33044.02

... More
Item;Maintenance of ground covers: Watering @ 10 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously) The watering shall be carried out DAILY during non rainy days, weeding, trimming and keeping the ground cover in healthy condition With Manual watering Kokapet TAB Building =84 sqmts Kollur New =550Sqmts Total=84+550=634Sqmts

634

924

70306.29

... More
Item;Cost and supplu of water through water tankers once in a day @ 5 Ltrs / per Sq.Mtrs / Per day (sub soil moisture maintained) Cycle Track Hedge area only at Kokapet Interchange 700x5x28/25000= 3.92x12 months

47.04

3352

157692.19

... More
Item;Maintenance of hedge: i)Trimming of hedges once in 15 days. ii)Watering hedges once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii)Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., =>Kokapet: i.Kokapt Interchange =1100+1911=3011Sqmts ii.Kokapt 1Km =3761Sqmts iii.Kokapet TAB=33Sqmts Kokapet Total=6805 sqmts =>Kollur: i.ORR Kollur Interchange=300 Sqmts ii.ORR Kollur VUP-I & VUP-II=580Sqmts iii.ORR Kollur New devlopmnet=1230 Sqmts iv.TAB=96.8sqmts KollurTotal=2206.8 sqmts Cycle Track hedge at Kokapet interchanhe= 700 Sq.Mtrs Total=6805+2206.8+ 700=9711.8Sqmts

9711.8

2930

3415589.56

... More
Item;Cost and supply of water through tankers ince in a day @ 10 Ltrs / per sqmt per day(Sub soil moisture shall be maintained) Kokapet Interchange Cycle track Lawn area 1400x10x28/25000= 15.68x12 months

188.16

3352

630768.77

... More
Item;Maintenance of lawns: (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers with Manual watering =>Kokapet: Kokapt Interchange =310+494=804Sqmts Kokapet Total=804 sqmts =>Kollur: i.ORR Kollur Interchange=818 Sqmts ii.ORR Kollur New devlopmnet=570 Sqmts iii.TAB =227.33Sqmts kollur Total=1615.33 sqmts Cycle Track at Kokapet Interchange: 1400 Sq.Mtrs Total=804+1615.33+1400=3819.33 Sqmts

3819.33

924

423537.73

... More
Item;Estimate for Maintenance of Avenue and shrub Plantations,TAB Bulidings & Interchanges on ORR Kokapet & Kollur Interchanges

-

-

-

... More
Item;Protection, Maintenance, watering tending the plants upkeep of fencing and removal of unwanted growth for 4 Months from April-2024 to June -2024

29919

360

995875.66

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

29919

482

144451.92

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant

29919

160

48151.64

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant

29919

482

144451.92

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant

29919

160

48151.64

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (32 waterings) 29919*20*32/25000=406.89 Days

765.93

3352

1767615.07

... More
Item;2nd year Maintenance of Avenue Plantaion on ORR (2022 planting) 0 Km to 14 Km RC along the ORR 23484+6435= 29919 Nos

-

-

-

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth. Rate =721.88X30%=216.56

68805

360

1280137.2

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

68804

482

332192.59

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant

68804

160

110733.16

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant

68804

482

332192.59

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant

68804

160

110733.16

... More
Item;Protection 1st Year + 2nd year =63809+ 4995=68804 Nos

-

-

-

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (12 waterings) 4995*32*20/25000=47.95 Days avenue plants

12.67

3352

42480.35

... More
Item;2nd year Maintenance of Avenue Plantaion on ORR (2021planting) 12 to 22 SR-4995 Nos

-

-

-

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants ( 17 waterings) 63809x20x48x/25000

2450.26

3352

7214006.6

... More
Item;1st Year Maintenance of Service Roads & Foot Paths- 20000+ 18173= 38173 Nos Inner & Outer 0 Km to 14 Km = 17506Nos Inner & Outer 14 Km to 22 Km =8130 Nos Total = 38173+17506+8130= 63809 Nos

-

-

-

... More
Item;Maintenance of Avenue Plantations on ORR Service roads, Foot Paths & Inner & Outer (0 km to 22 km) During the year 2024-25 Forest Manager- IV

-

-

-

... More
Item;Cost of Chemicals

-

-

264000

... More
Item;Tractor provision for lift the Trimming material

1

32000

384000

... More
Item;ORR Main Carriage way (1 times) Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total MCW area=2.5widthx2sidesx22000 =110000sqmts MCW shrubs =55595x(22/7)x0.30x0.30=15725.44 Sqmt. MCWAvenue =57029x(22/7)x0.50x0.50=44808.50Sqmt. Total area=110000-15725.44-44808.50=49466.06 sqmts

49466.06

66

132074.38

... More
Item;Central Median Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total Cenral median area=4.50widthx22000 =99000 sqmts Individual shrubs=59542x(22/7)x0.30x0.30=16841.88Sqmt. Hedge=18920sqmts. Empty area=23000x0.30x2=13800sqmts Total area=99000-16841.88-18920-13800=49798.12sqmts(1 times)

49798.12

65

130969.06

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

43759

482

211272.83

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant

43759

160

70425.73

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant

43759

482

211272.83

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant

43759

160

70425.73

... More
Item;Cost of water to plants through tankers for watering 5000 Ltrs each trip capacity 5 trips per day 20 ltrs per plant in each watering (17 waterings ) 43759x20x32/25000=420.08days

1120

3352

3754576

... More
Item;a. MCW Avenue Plants 0 Kmto 14 Km (Left & Right) = 12934+21122 = 34056 Nos b. MCW Slopes 17 Km to 19 KM (Left & Right) = 9703 Nos

-

-

-

... More
Item;2nd year Maintenance of MCW Avenue Plantations and Slopes from Kokapet to Patancheru (0 KM to 22 KM)

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

13270

482

64068.89

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant

13270

160

21356.74

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant

13270

482

64068.89

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant

13270

160

21356.74

... More
Item;Cost of water to plants through tankers for watering 5000 Ltrs each trip capacity 5 trips per day 20 ltrs per plant in each watering (17 waterings ) 13270x20x48/25000

509.56

3352

1708197.99

... More
Item;1st year Maintenance of MCW Avenue Plantations and Slopes from Kollur to Patancheru (14 KM to 22 KM)

-

-

-

... More
Item;Cost of water to plants through tankers for watering 5000 Ltrs each trip capacity 5 trips per Plant in alternate day 9105x5x15/25000=27.31daysx12months = 327.72 days

327.72

3352

1098615.76

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from April-2023 to June-2023 (4 Months) (i) Trimming Shrubs once in 15days. (ii) watering shrubs once in a alternate day @5litres/per plant (sub soil moisture shall be maintained continuously). (iii) Formation of basins upto 1ft away from the Plannt. (iv) Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc. With Manual Watering (4 Months) 9105 Nos ( Millingtonia, Gadichoudi, Cicilpinia)

9105

444

485267.36

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from Trimming Shrubs once in 15days watering shrubs once in a alternate day @5litres/per plant (sub soil moisture shall be maintained continuously) Formation of basins upto 1ft away from the Plannt Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc. with drip (Gadichodi, Cicilpinia, Devaganneru)

46490

201

1124686.08

... More
Item;0-14 =(24416+9662)=34078Nos,14-22=12412Nos Total=46490Nos

-

-

-

... More
Item;MCW Shrubs Miantenance from Kokapet to Patancheru (0 Km to 22 km)

-

-

-

... More
Item;Maintanance of Hedge planting: Trimming hedges once in 15days watering hedges once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)April-2022 to March-2023 only during non - rainy days Formation of basins 1ft away from the hedge Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc., With Drip (3 months)

18920

1318

2994339.74

... More
Item;0-14 = 12040 Sqmts , 14-22 =6880 Sqmts Total=18920 Sqmts

-

-

-

... More
Item;Cost of water to plants through tankers for watering 5000 ltrs each trip capacity 5 trips per day 15 ltrs per plant ini each watering 43009x5x15/25000=129.02 x 12 months = 387.08 days

1548.24

3352

5190164.95

... More
Item;(i) Trimming Shrubs once in 15days. (ii) watering shrubs once in alternate day @5litres/per plant (sub soil moisture shall be maintained continuously). (iii) Formation of basins upto 1ft away from the Plant. (iv) Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc. (Pudica Plants) Old Plantas - 8242 Nos New Plants (2023-24 Raising) - 34767 Nos

43009

444

2292242.07

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering Trimming Shrubs once in 15days watering shrubs once in alternate day @5litres/per plant (sub soil moisture shall be maintained continuously) Formation of basins upto 1ft away from the Plant Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc. With drip (Pogada Plants)

16533

201

399966.34

... More
Item;0-14 =10706 Nos, 14-22 =5785Nos & 2-11 Km = 42 Nos= Total=16533 Nos With Manual watering( 0 Km to 22 KM) = 8242 Nos & 34767 Nos

-

-

-

... More
Item;ORR Central Median from Kokapet to Patancheru (0 Km to 22 km)

-

-

-

... More
Item;ORR Kokapet to Kandlakoya (0 Km to 52 km)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.