Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Opening Date16 Jul 2024
Closing Date20 Jul 2024
Tender Amount₹ 77,09,315 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Hedge planting Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyardmanure at 4:1 ratio, internal transportation ofplants and planting the plants including theapplication of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding thecost of the fertilizers (@ 20 gms/pit/sqmt) andplant material.

3069

756

2321667.81

... More
Item;Digging the pit of size 0.30x0.30x0.30xm m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

6000

129

778740

... More
Item;Planting of individual shrubs: Digging the pit of size 0.60x0.60x0.60m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

3678

344

1268431.86

... More
Item;For 10"X16"and 18"X18 Bag plants 30 Km lead = 10.58 X 30 = 317.40

29034

317

92153.92

... More
Item;For 6"X12" Bags lead 20 Km = 3.02 X 25 = 75.50 =

52500

75

39637.5

... More
Item;Over and above 3km lead add following rates per km per 100 plants

-

-

-

... More
Item;For 18"X18" Bag size

3678

2234

82178.66

... More
Item;For 10"X16" Bag size

6000

734

44095.8

... More
Item;For 6"X12" Bag size

52500

338

177885.75

... More
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided

-

-

-

... More
Item;laying Shabad stone flooring with ran door white 50.80MM thickness over a base of mud motor of 30MM thickness and pointing to Full depth of sttores with red soil and carpet grass including cost and conveyance of all meterial and logout charges

600

4299

257961

... More
Item;Laying of carpet grass and ramming

1500

58

87150

... More
Item;Cost of carpet grass

1500

135

202500

... More
Item;Lawn Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass

1500

333

500625

... More
Item;Formation of earthen mounds by using the available earth at site to the concave/convex land including water ,rolling with hand roller etc complete including the labour charges, watering charges ,hire charges of hand roller etc complete including all taxes etc

1500

49

73875

... More
Item;Spreading of red soil,gravel or sand including watering and rolling with hand roller irrespective of thickness in layer

630

22

14175

... More
Item;Internal transport & application of red earth,gravel,soil mixture plantation areas parks

630

94

59497.2

... More
Item;Supply & stacking of gravel at site for the department gauge for premeasurements and it shall be composed of wellgraded course silicious grains sharp & gritty to touch and free from dirt & other deleterious matter. Further it shall not contain lumps larger than 20 mm and the finer shall not exceed 10% passing through 75 micron is sieve and should have liquid limit and plasticity index not more than 6 as per standard specification no 138 of APSS. the cost including of transportation, loading,unloading,stackinag at the site including all labour charges, taxes & seiniorage chares etc. complete. 1500x0.15=210Cum

630

204

128646

... More
Item;Engaging of back hoe loaders (JCB,s) for clearance of sites.loading of unwanted cleared materials

90

850

76500

... More
Item;DEVELOPMENT OF GREENERY WORK WITH LANDSCAPING AT JALLPALLY LAKE

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.