Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Road Construction
Opening Date16 Mar 2024
Closing Date3 Apr 2024
Tender Amount₹ 2,37,93,461 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Carting of debris transport upto a lead of 10 kms Hedge/Shrub area in development works effective area central median 2700 X 0.30 = 810

810

191

155358

... More
Item;Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth. 7 months

18000

216

467778.24

... More
Item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each avenue plants each watering in alternate day (48 Waterings) =18000x20x48/25000=691

691.2

3352

2317109.76

... More
Item;2nd soil working 10 cms deep using crowbars to a radious of 50 cms around the plant

18000

482

86907.24

... More
Item;2nd circular weeding without application of fertilizers to radious of 50 cms around the plant

18000

160

28969.92

... More
Item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant

18000

482

86907.24

... More
Item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant

18000

160

28969.92

... More
Item;Replacement of causalities to a maximum of 20% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)

2000

2261

45220

... More
Item;Application of fertilizers (2 doses)

18000

114

20558.16

... More
Item;Cost of chemicals and fertilizers 20 grams per pit (2 doses)

18000

-

9000

... More
Item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")

18000

12

226800

... More
Item;Planting of bag plants after refilling the pits/support sticks10"x16" bags

18000

2139

385056

... More
Item;Internal transport of bag plants to planting site 10X16 bags

18000

608

109519.2

... More
Item;10"x16"Bags(10.58x47+734.93)

18000

1232

221794.2

... More
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 50Km

-

-

-

... More
Item;Application of Folidol dust (10%) @20gms/pit/dose

18000

57

10279.08

... More
Item;Application of Red soil and FYM including internal distribution 45cmt cube pit

18000

514

92541.96

... More
Item;Cost of Folidol dust (10%) @20grms/pit

18000

-

9000

... More
Item;Cost and conveyance of well decomposed FYM (0.45 mt pits)

18000

1079

194297.4

... More
Item;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60mt pits (0.45X0.45X0.45=0.092x20000 =1840*20%

331

1228

406633.5

... More
Item;Digging of pits of size0.45x0.45x0.45 mts

18000

2845

512101.8

... More
Item;Alignment and Stacking including cost of stacks(45%)

8100

97

7864.29

... More
Item;Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary)

36000

65

23672.88

... More
Item;Watering the plants through tankers of 5000 litres each trip capacity ( 5 trips per day - 25000 ltrs ) Lawn area: 200x 10 ltrs x 28days/ 25000 ltrs x 12 months = 26.88Days Hedge and shrubbery: 1500 x 5 ltrs x 28 days x 12 months / 25000 ltrs = 100.80 nos Individual shrubs: 280x 5 ltrs x 15 days x 12 months / 25000 ltrs =0.84 nosx12Days=10.08Days Rings=250x20x15/25000=3x12months=36

173.76

3352

582495.65

... More
Item;Maintenance of Lawns: Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) Lawn mowing and edging of the lawns in the following frequency Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Keeping the lawns always in lush green & weed-free condition Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)

200

924

11089.32

... More
Item;Maintenance of Individual shrubs: Trimming of shrubs once in 15 days Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months) 42 + 514 + 3437 + 46 = 4039 Nos Lanco pots 30 Rectangle pots 12

280

444

14923.1

... More
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)

1000

2930

351694.8

... More
Item;Cost of Topiry/Plams

280

4000

1120000

... More
Item;cost of Hedge plants

10000

40

400000

... More
Item;cost of Bouganvillea Balls

2500

500

1250000

... More
Item;Planting of 10"x16" bag plants

250

1528

3820

... More
Item;Mixing charges of soil mixture

25.99

175

4548.25

... More
Item;Cost of thimmet

5

120

600

... More
Item;Cost of DAP 45-50 Kgs bag

2

1450

2900

... More
Item;Cost and conveyance of well decomposed FYM

5.2

1340

6968.91

... More
Item;Importation of good quality red earth

15.6

1228

19159.69

... More
Item;Preparation of soil mixture like red earth, FYM, DAP, thimmet in 4:1 ratio cement ring dia 2 feet 22/7x0.3x0.3x334x0.3 = 28.33 cumt Deductions ball of earth 18"x18"bag size : 2x22/7xD = 20 r = 3.18 22/7x3.18x3.18x14 = 444.82/1728 = 0.257 cft or 0.007 cumt 334 x 0.007 = 2.338 cumt 28.33 (-) 2.338 = 25.994 cumt in 4:1 ratio

-

-

-

... More
Item;Cost of 2 Feet dia cement rings and fixing at site Total:250 Nos

250

650

162500

... More
Item;Internal transport of bag plants to planting site 6"x12"

10000

150

15055

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt)) i.Toll Buliding Plams=200Nos ii.Trumpet Foxtail Plams=80Nos

280

746

209048

... More
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material i.Toll Buliding=300Sqmts ii.Triangle Bit=800Sqmts iii.Trumpet=400SQmts

1000

756

756490

... More
Item;Laying of carpet grass and ramming

200

58

11620

... More
Item;Cost of carpet grass

200

135

27000

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass toll Building=200Sqmts

200

333

66750

... More
Item;Spreading of red soil,gravel or sand including watering and rolling with hand roller irrespective of thickness in layer

400

22

9000

... More
Item;Internal transport & application of red earth,gravel,soil mixture plantation areas parks

400

94

37776

... More
Item;Supply & stacking of gravel at site to the department gauge for premeasurements and it shall be composed of wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleterious matter.. the cost including of transportation, loading,unloading, stackinag at the site including all labour charges, taxes & seiniorage chares Internal transportation & application of gravel including spreading etc. complete. 1000x0.50Mtrs=

400

432

173016

... More
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete = 4200 Sqmt X 0.30 = 600 Cum

1000

174

174800

... More
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation, plastic materials Basic rate: 520/- + 20% Municipal limits on labour component

50

520

26000

... More
Item;Engaging of JCB on hire charges including fuel and driver batha as per the direction of the departmental authority

50

850

42500

... More
Item;Watering the plants through tankers of 5000 litres each trip capacity ( 5 trips per day - 25000 ltrs ) Lawn area: 600x 10 ltrs x 28days/ 25000 ltrs x 12 months = 80.64Days Hedge and shrubbery: 4630 x 5 ltrs x 28 days x 12 months / 25000 ltrs = 311.13 nos Individual shrubs: 180x 5 ltrs x 15 days x 12 months / 25000 ltrs = 6.48 nos

398.25

3352

1335053.48

... More
Item;Maintenance of Lawns: Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) Lawn mowing and edging of the lawns in the following frequency Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Keeping the lawns always in lush green & weed-free condition Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)

450

924

24950.97

... More
Item;Maintenance of Individual shrubs: Trimming of shrubs once in 15 days Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months) 42 + 514 + 3437 + 46 = 4039 Nos Lanco pots 30 Rectangle pots 12

180

444

9593.42

... More
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)

3000

2930

1055084.4

... More
Item;Railing & painting & sign bords

-

-

500000

... More
Item;Laying of steping stone

600

743

446052

... More
Item;Cost of sculptures

4

250000

1000000

... More
Item;Cost of Topiry/Plams

180

4000

720000

... More
Item;cost of Hedge plants

30000

40

1200000

... More
Item;Internal transport of bag plants to planting site 6"x12"

30000

150

45165

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt)) Plams=20Nos Topiry=20

180

746

134388

... More
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material

3000

756

2269470

... More
Item;Laying of carpet grass and ramming

450

58

26145

... More
Item;Cost of carpet grass

450

135

60750

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass

450

333

150187.5

... More
Item;Formation of earthen mounds for using the soil available at site 1000Sqmtsx2.15=

1612.5

49

79415.62

... More
Item;Spreading of red soil,gravel or sand including watering and rolling with hand roller irrespective of thickness in layer

750

22

16875

... More
Item;Internal transport & application of red earth,gravel,soil mixture plantation areas parks

750

94

70830

... More
Item;Supply & stacking of gravel at site to the department gauge for premeasurements and it shall be composed of wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleterious matter.. the cost including of transportation, loading,unloading, stackinag at the site including all labour charges, taxes & seiniorage chares Internal transportation & application of gravel including spreading etc. complete. 2000x0.5Mtrs=

750

432

324405

... More
Item;Supply and fixing of pre cast ACC curb with size 600mm X 375mm X 110 mm semi bated at the top in M30 grade including cost and conveyence to site and labour charges for complete for laying true to aalingment and

500

227

113500

... More
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete = 2000 Sqmt X 0.30 = 600 Cum

450

174

78660

... More
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation, plastic materials Basic rate: 520/- + 20% Municipal limits on labour component

80

520

41600

... More
Item;Engaging of JCB on hire charges including fuel and driver batha as per the direction of the departmental authority

25

850

21250

... More
Item;Estimate for Replacement of Greenery, Soft landscape work at Dundial & Narsapur Rotaries, In between Central Median during the year 2023-24., Estimate for Development of Greenery Soft landscape work at Dundial Interchange Trumpet-I , Triagle Bit & TAB Building during the year 2023-24 Estimate for Raising of Avenue Plantation at ORR Railway corridor From 31km to 37Km During the year 2023-24(18000Nos), Estimate for Refurbishment of of Hedge Plantation in ORR Central Median from Patancheru(23km) To Dundigal (43km) during the year 2023-24

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.