Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
505269Bid Award Id
ViewTender No
1821/1/UF/HMDA/2023Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Cost and supply of water to the hedge plants 5Litre/sqmt/once in a day 28 times/month through the tankers 1500x5x28/25000=8.4 Days X 12=100.8
100.8
3352
337911.84
Item;Maintenance of Hedge/shrub plantingTrimming of hedges once in 15 days ii)Watering to hedges once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously)Formation of basins for each and every plant upto 1 ft away from the plant iii)Application of fertilizers, insecticides, fungicides etc
1500
2930
527526
Item;Transportation of plants from Nursery site to planting site up to lead 10 km Complete including loading and unloading from Shamshabad 60 KMs lead = 3.02 per K. M = 3.02X58 = 175.16 +338.83 = 513.99 for 6"X12" Bag size
1500
513
770985
Item;Hedge / shrubs: planting : Digging the trenches of size 30 cms depth refilling the trench with red soil, FYM at 4:1 ratio internal transport of plants & planting the plants including the applicatuion of fertilises and pesticides etc.' complete , but excl the cost of fertilizes and plant material.
1500
756
1134735
Item;Digging of 45X45X45cm pit ,filling with soil mixture of red soil, farmyard manure and sand in the ratio 3:1:1 ratio including internal transport application of fertilizers and chemicals @20 gms /pit/sqmt/,internal transportation of plants and planting the plants (excluding cost of plant material fertilizers and chemicals @20 gms/pit/sqmt) Excluding digging
1000
194
194070
Item;Digging of 60X60X60cm pit ,filling with soil mixture of red soil, farmyard manure and sand in the ratio 3:1:1 ratio including internal transport application of fertilizers and chemicals @20 gms /pit/sqmt/,internal transportation of plants and planting the plants (excluding cost of plant material fertilizers and chemicals @20 gms/pit/sqmt)
500
344
172435
Item;CENTRAL MEDIAN
-
-
-
Item;Protectio, maintenance, watering, tending the plants upkeep of fencing & removal of unwanted growth,
32000
360
1386009.6
Item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each watering (24 waterings) 10"x16" plants. ( From August - 2022 to March-2023) 32000x24x20/25000=614.4 Days
614.4
3352
2059653.12
Item;2nd soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
32000
482
154499.2
Item;2nd circular weeding without application of fertilizers to radious of 50 cms around the plant
32000
160
51500.8
Item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
32000
482
154499.2
Item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant
32000
160
51500.8
Item;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)
3200
2261
72352
Item;Application of fertilizers (2 dose)
32000
114
36547.2
Item;Cost of chemicals and fertilizers 20 grms per pit (2 doses)
32000
-
15000
Item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")
32000
17
555520
Item;Planting of bag plants after refilling the pits/support sticks 10"x16" bags
32000
2139
684544
Item;Internal transport of bag plants to planting site 10x16 bags
32000
608
194700.8
Item;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided from Shamshabad 60 KM (58*10.58)=613.64+542.19=1155.83
32000
1155
369865.6
Item;Application of Foildol Dust (10%) @ 20 gms / pit / dose
32000
48
15663.36
Item;Cost of Foildol dust (10%) @20 gms / pit
32000
-
5087
Item;Cost and conveyance of well decomposed FYM (0.60 mt pits)
32000
1079
345417.6
Item;Application of Red soil and FYM including internal distribution 45 cmt cube pit
32000
445
142617.6
Item;Cost and Conveyance of well red soil for planting area of 60 Cum pits each pit red soil pet (0.45x0.45x0.45=0.091 x28000 =2548 cum x 20%=509.6 cum
582
1228
714987
Item;Digging of pits of size0.45x0.45x0.45 mts
32000
2438
780345.6
Item;Alignment and Stacking including cost of stacks(45%)
14400
97
13980.96
Item;BLOCK PLANTATION
-
-
-
Item;Protectio, maintenance, watering, tending the plants upkeep of fencing & removal of unwanted growth,
10000
216
129936
Item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each watering (22 waterings) 10"x16" plants. From September to March 10000x20x24/25000=192
192
3352
643641.6
Item;2nd soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
10000
413
41384.4
Item;2nd circular weeding without application of fertilizers to radious of 50 cms around the plant
10000
137
13795.2
Item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
10000
413
41384.4
Item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant
10000
137
13795.2
Item;Application of fertilizers (1 dose)
10000
97
9789.6
Item;Cost of chemicals and fertilizers 20 grms per pit (2 doses)
10000
-
10448
Item;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)
1000
1938
19380
Item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")
10000
28
280000
Item;Planting of bag plants after refilling the pits/support sticks 10"x16" bags
10000
1833
183360
Item;Internal transport of bag plants to planting site 10x16 bags
10000
521
52152
Item;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided from Shamshbad to s 60 KM (58*10.58)=613.64+734.93=1348.57
10000
1348
134857
Item;Application of Foildol Dust (10%) @20 gms / pit / dose
10000
48
4894.8
Item;Cost and conveyance of well decomposed FYM (0.60 mt pits)
10000
2558
255873
Item;Application of Red soil and FYM including internal distribution 60cmt cube pit
10000
1057
105760.8
Item;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60mt pits (0.60x0.60x0.60=0.216 x9000=1944 cum x 20%=388.8 cum
432
1228
530712
Item;Digging of pits of size0.60x0.60x0.60 mts
10000
5795
579532.8
Item;Alignment and Stacking including cost of stacks(45%)
4500
97
4369.05
Item;AVENUE PLANTATION
-
-
-
Item;ESTIMATE FOR DEVELOPMENT OF AVENUE PLANTATION AT ENUMULA NARVA HMDA LAYOUT IN ENUMULA NARVA (V) KOTHUR (M) RR (DIST
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements