Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Excavation
Opening Date4 Oct 2023
Closing Date12 Oct 2023
Tender Amount₹ 1,77,14,981 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Maintenance of Ground Covers: Watering @ 10-15 litres/sqmt/day basing on the season and weather condition (sub-soil moisture shall be maintained continuously) weeding, trimming and keeping the ground in healthy condition Application of fertilizers, insecticides, fungicides etc

3080

924

170775.9

... More
Item;Maintenance of Hedge/shrub planting: 1. Trimming of hedges once in 15 days2.Watering to hedges once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously)3.Formation of basins from 1 ft away to Hedge 4.Application of fertilizers, insecticides, fungicides etc

2044

4103

503204.92

... More
Item;Maintenance of lawns:Watering of the lawns @ 10-15 liters/sqmt / day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) II ) Lawn mowing and edging of the lawns in the following frequenty June to November - once in 15 days December to May - once in 30 days III) Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Application of fertilizers, insecticides, fungicides etc with manual watering

2400

924

133072.13

... More
Item;Maitenance for 6 Months

-

-

-

... More
Item;Cost of Topiary plants

600

1000

600000

... More
Item;Cost of Shurb plants

20000

130

2600000

... More
Item;Cost of Ground cover plants

46200

45

2079000

... More
Item;Cost of Hedge plants

30660

65

1992900

... More
Item;Ground Cover Bed preparation: Dressing the surface to the desired shape, laying 4? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (2.5? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass.

3080

203

628196.8

... More
Item;Individual Shrubs Planting:Topiary / Palms / Garden tree planting ? Digging of 0.75x0.75x0.75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))

600

746

447960

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 30x30x30 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 grm per pit)

20000

129

2595800

... More
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyardmanure at 4:1 ratio, internal transportation ofplants and planting the plants including theapplication of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding thecost of the fertilizers (@ 20 gms/pit/sqmt) and plant material

2044

756

1546265.56

... More
Item;Laying / Tarfing of coarpet and shade grass

2400

58

139440

... More
Item;Cost of carpet grass

2400

135

324000

... More
Item;LAWN :Bed preparation : Dressing the surface to the desired shape, laying 6 ? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (2.5? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals & grass.

2400

222

534000

... More
Item;Spreading of Gravel and application & rollingwith land rolar

300

22

6750

... More
Item;Internal transport & application of Gravel in plantation areas and parks

300

71

21582

... More
Item;Supply and stacking of gravel at site for the departmental guage for premeasurement and it shall be composed of well graded course silicous grains sharp & gritty to touch and free from dirt & othe deleterious matter. Further it shall not contain lumps larger than 20 mm and the finer shall not exceed 10% passing through 75 microns is sieve and should have liquid limit and plasticity index not more than 6 as per standard specificaion no 138 of APSS, the cost including of transport, loading, unloading, stacking at the site including all labour charges, taxes & seiniorage charges etc complete

300

204

61260

... More
Item;Estimate for Development of Rock Garden at Mayuri Nagar, Miyapur under Forest Manager-III during the year 2023-24

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.