Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
528038Bid Award Id
ViewTender No
627/1R/UF/UF/H/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance of Lawns From December-2023 to March-2024(Months)
-
-
-
Item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 200x5x15/25000=0.60 Daysx4 Months=2.40
2.4
3352
8045.52
Item;Maintenance of Individual plants and shrubs trimming once in 15 days and watering once in a day @ 5 ltrs per plant with manual watering
200
444
3553.12
Item;Maintenance From December-2023 to March-2024(4Months)
-
-
-
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(8"x12")Bags Total lead 25Km =22km x10.58=232.76+542.19
100
774
774.95
Item;Cost of Shub Plants
100
50
5000
Item;Shrub planting: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
200
194
38814
Item;Engaging of JCB for Clening and leveling of sites including the fuel charges and driver batta etc complete 3days X 8 Hours = 24 Hours
24
850
20400
Item;Individual Shrub Plantation
-
-
-
Item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 1700x5x28/25000=9.52 Daysx4Months=38.08
38.08
3352
127655.58
Item;Maintenance of hedge planting trimming once in 15 days watering once in a day @ 5ltrs per plant with manual watering
1700
2930
199293.72
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(6"x12")Bags Total lead 25Km =22km x3.02=66.44+338.83
17000
405
68895.9
Item;Cost of Hedge Plants
17000
35
595000
Item;Hedge planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material
1700
756
1286033
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete =1000 Sqmt X 0.45x2 = 900 Cum
900
174
157320
Item;Hedge Plantation along the Walking Track (1000 RMT @ 45 cm width Both sides = 450 Sq.Mtrs
-
-
-
Item;Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.From December-2023 to March-2024 (4 months)
200
360
2887.52
Item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each avenue plants each watering (16 Waterings) From December-2023 to March-2024 =200x20x16/25000=2.56
2.56
3352
8581.89
Item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
200
482
965.64
Item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant
200
160
321.89
Item;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)
20
2261
452.2
Item;Application of fertilizers (2 doses)
200
293
587.86
Item;Cost of chemicals and fertilizers 20 grams per pit (2 doses)
200
-
200
Item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")
200
28
5600
Item;Planting of bag plants after refilling the pits/support sticks10"x16" bags
200
2139
4278.4
Item;Internal transport of bag plants to planting site 10X16 bags
200
608
1216.88
Item;10"x16"Bags(10.58x22+735.93)
100
968
968.69
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 53Km
-
-
-
Item;Cost of Avnue Plants
100
250
25000
Item;Application of Folidol dust (10%) @20gms/pit/dose
200
57
114.21
Item;Application of Red soil and FYM including internal distribution 75cmt cube pit
200
1233
2467.75
Item;Cost of Folidol dust (10%) @20grms/pit
200
-
100
Item;Cost and conveyance of well decomposed FYM (0.60 mt pits)
200
2558
5117.46
Item;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60mt pits (0.60X0.60X0.60=0.216x200=43.208 cum x 20%=8.64 cum
8.64
1228
10614.24
Item;Digging of pits of size0.60x0.60x0.60 mts
200
6761
13522.43
Item;Alignment and Stacking including cost of stacks(45%)
90
97
87.38
Item;Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary)
400
65
263.03
Item;Avenue Plantation
-
-
-
Item;Supply and fixing of Granite stone benches of minimum length of 5 feet with flammed finish of approved design and colour including the cost of earth work excavation laying of PCC 1:2:4 in required dimensions fixing chagre labour charges making charges incidental and operation charges contractor profit etc complete for finished item of work and as directed by the engineer
10
11000
110000
Item;Signboards
-
-
150000
Item;Cost of sculptures (3 Nos)
1
-
500000
Item;Internal Transportation spereading of gravel
600
71
43164
Item;Lawn Mounds, Gravel filling
600
204
122520
Item;Laying of shabad stone flooring with ran door white 50.80 mm thickness over a base of mud motor of 30mm thickness and pointing of full depth stores with red soil and carpet grass including cost and conveyance of all material and labour chagres 2 feetx2 feet x 150 Rmt= 600
600
4299
257961
Item;Laying of carpet grass and ramming
2500
58
145250
Item;Cost of carpet grass
2500
135
337500
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass ( 4? thickness after rolling )
2500
333
834375
Item;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide 50 mm thicj ibn PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid using concrete batching and mixing plant including contracotrs profit and overhead charges but excluding seinorage charges all complete as per clause 408 MORTH, complete for finished item of work and as directed by the Engineer-in-charge (Morth 408 8.2 B)
1470
575
846249.6
Item;Internal Transportation & application of gravel including spreading
1470
99
146176.8
Item;Supply & stacking of gravel at site to the department guage for permeasurements and it shall be composed for wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleteriious matter the cost including of transportation, loading, unloading charges taxes & seiniorage charges etc complete = 735 Sqm x2 M Height =1470 Cum
1470
204
300174
Item;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 kms
1850
137
253450
Item;ESTIMATE FOR DEVELOPEMNT OF LANDSCAPING WORK AT SHAMBUNIKUNTA LAKE, AMEENPUR DURING THE YEAR 2023-24
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements