Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
528944Bid Award Id
ViewTender No
627/CM/2/UF/H/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;2nd circular weeding without application of fertilizers to a radius of 50cms around the plant
24000
114
27590.4
Item;1st soil working 10cms deep using crowbars to a radius of 50cms around the plant
24000
344
82768.8
Item;1st circular weeding without application of fertilizers to a radius of 50cms around the plant
24000
114
27590.4
Item;Replacement of casualties to a maximum of 30% of the planted including reopening of pits, transport of plants internal transport and planting
7200
3751
270095.04
Item;Application of folidal dust 10% 20gms/pit/dose
24000
40
9789.6
Item;Cost of folidal dust 10% 20gms/pit
480
35
16800
Item;Planting of bag plants after refilling the pits / support sticks
24000
132
31682.4
Item;Internal transport of bag plants to planting site
24000
81
19579.2
Item;Over and above 3km lead add following rates per km per 100 nos an average 70 kms additional lead 3.39 x 70 km lead = 237.30
24000
237
56952
Item;Transportation of bag plants from nursery site to planting site upto a lead of 3 km including loading and unloading wherever departmental vehicles are not provided
24000
270
65001.6
Item;Application of FYM
24000
216
51974.4
Item;Cost and transport of well decomposed FYM at 10 cft/100 pits
24000
532
127862.4
Item;Alignment and staking including cost of stakes
24000
69
16644
Item;Digging of 0.3x0.3x0.3 cube pits 6000 Rmt x both sides = 12000 Rmt / 0.5 = 24000 nos
24000
919
220716
Item;Carting of debris including loading and unloading and transportation upto 10kms lead
1000
137
137000
Item;Cleaning dense unwanted Jungle growth in planting area bushes, shrubs etc wherever necessary 6000 Rmt x 4m = 24000 sqmt x both sides = 48000 sqmt / 10000 sqmt= 4.8 hect
4.8
7246
34780.9
Item;Clearing unwanted light Jungle growth (bushes, shrubs) etc wherever necessary 6000 Rmt x 4m = 24000 sqmt x both sides = 48000 sqmt / 10000 sqmt= 4.8 hect
4.8
5795
27817.54
Item;Over and above 3km lead add following rates per km per 100 nos an average 70 kms additional lead 10.58 x 40 km lead = 423.20
70000
423
296240
Item;Transportation of bag plants from nursery site to planting site upto a lead of 3 km including loading and unloading wherever departmental vehicles are not provided 8"x12"
70000
542
379533
Item;Engaging of Men and Women mazdoor for pruning of lower branches of conocarpus plant 510 plants x 3 Mandays per day = 1530 nos
1530
595
910350
Item;Laying of carpet grass and ramming
81
58
4706.1
Item;Cost of carpet grass
81
135
10935
Item;Lawn : Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass
81
333
27033.75
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material.
5110
756
3865663.9
Item;Carting of debris including loading and unloading and transportation upto 10kms lead
1575
137
215775
Item;Watering the plants through tankers of 5000 ltrs each trip capacity ( 5 trips per day - 25000 ltrs ) 10000 plants x 20 ltrs x 50 waterings / 25000 ltrs = 400 nos
400
3352
1340920
Item;Protection, maintenance, watering, tending the plants upkeep of fencing and removal of unwanted growth for 12 months
10000
866
1039500
Item;2nd soil working 10cms deep using crowbars to a radius of 50cms around the plant
10000
344
34487
Item;2nd circular weeding without application of fertilizers to a radius of 50cms around the plant
10000
114
11496
Item;1st soil working 10cms deep using crowbars to a radius of 50cms around the plant
10000
344
34487
Item;1st circular weeding without application of fertilizers to a radius of 50cms around the plant
10000
114
11496
Item;Replacement of casualties to a maximum of 20% of the planted including reopening of pits, transport of plants internal transport and planting
2000
1615
32300
Item;Application of chemicals and fertilizers
10000
209
20995
Item;Cost of chemicals and fertilizers 20gms/pit/2 doses
400
50
20000
Item;Application of folidal dust 10% 20gms/pit/dose
10000
40
4079
Item;Cost of folidal dust 10% 20gms/pit x 160 plants / 1000
200
35
7000
Item;Cost, transport and fixing of support sticks for tall plants
10000
28
280000
Item;Planting of bag plants after refilling the pits / support sticks
10000
1528
152800
Item;Internal transport of bag plants to planting site
10000
594
59456
Item;Over and above 3km lead add following rates per km per 100 nos an average 50 kms additional lead 10.58 x 50 km lead = 529.0
10000
529
52900
Item;Transportation of bag plants from nursery site to planting site upto a lead of 3 km including loading and unloading wherever departmental vehicles are not provided
10000
1399
139907
Item;Importation of good quality red earth 0.6x0.6x0.6 x 40% = 0.0864 x 10000 = 864 cumt
864
1228
1061424
Item;Cost and conveyance of well decomposed FYM to planting site
10000
2558
255873
Item;Application of red soil and FYM including internal distribution
10000
881
88134
Item;Digging of 0.6x0.6x0.6 cumt pits
10000
5795
579532
Item;Alignment and staking including cost of stakes
10000
69
6935
Item;Carting of debris including loading and unloading and transportation upto 10kms lead
400
137
54800
Item;Engaging of JCB on hire charges including fuel and driver batha 8 days x 8 hrs = 64 hrs
64
850
54400
Item;Raising of Avenue Plantation & Cental Median plantation and Tecoma gadiwhowdi planting 0.5m espacement along the Avenue plantation from Maheshwaram gate to Maheshwaram Shivalayam temple both sides in Tukkuguda Municipality
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements