Hyderabad Metropolitan Development Authority Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Road Construction
Opening Date27 Jan 2025
Closing Date10 Feb 2025
Tender Amount₹ 1,32,97,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BOQ;Earth work Excavation for foundations and depositing on sides with all lifts and initial lead of 10.0 Mts dressing of sides and bottom and backfilling in trenches with excavated suitable material including all operational incidentals, labour charges like shoring, sheeting planking, shuttering etc., complete by manual means upto 3Mts depth in all soils including overhead charges & Contractor's profit & Seignorage charges (APSS 308)BLD-CSTN-2-1

54

321

17362.08

... More
BOQ;Groove Cutting of 2-4 mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond studded saw within 24 hours of casting of CC pavement

3700

60

222000

... More
BOQ;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.70-0.80 atmospheres as per the standard procedure floting with powerfloater, mechanical trawelling, finishing with sound edges and camers including hire and operational charges of machinery, etc,including,Loading , Unloading, Contarctor's profit and overhead charges but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.

4200

75

315000

... More
BOQ;Construction of un-reinforced, dowel jointed, plain cement concrete pavement of M 30 Grade over a prepared sub base with 43 grade cement @ 350 kg per cum, coarse and (Robo: sand,50%:50%) fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and Technical Specification 602 MORTH.

840

5127

4307478

... More
BOQ;Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS (HIImpact Polysterene) or ABS or ASA ( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H. Complete for finished items of work and as directed by Engineers-in-charge.

200

401

80325.81

... More
BOQ;Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes as per Specification 803 MORTH, including Contractors profit and overhead charges but excluding Seigniorage Charges complete for fiished item of work and as directed by the Engineer-in-charge

127.05

380

48350.15

... More
BOQ;Engaging Labour for clearing of debris, solid waste & trimming of bushes along the road etc., complete for finished item of work and as directed by Engineer in Charge.

100

805

80500

... More
BOQ;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

900

294

265302

... More
BOQ;Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified Grading II (13 mm nominal size), premixed with bituminous binder VG 30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic big paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects with all leads (MORTH 5.8) including lead and lift charges, Contractors profit and overhead charges but excluding Seigniorage Charges and taxes complete for fiished item of work and as directed by the Engineer-in-charge MoRT&H 509/5.8

205.51

10741

2207576.09

... More
BOQ;Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH (5th Rev)specification clause No. 507 complete in all respects.

342.51

9429

3229845.32

... More
BOQ;Providing and applying tack coat with Bitumen emulsion (RS-1) (Rapid Setting) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom including conveyance of bitumen emulsion round the trip as per Technical Specification Clause 503 MoRT&H ,/5.2 including lead and lift charges, all labour and material charges, Contractors profit and overhead charges but excluding Seigniorage Charges complete for finished item of work and as directed by the Engineer-in-charge.

13700

12

175223

... More
BOQ;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM)

3597

36

129671.85

... More
BOQ;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.13 and Technical Specification Clause 406 MORD / MORTH. including Contractors profit and overhead charges but excluding Seigniorage Charges complete for fiished item of work and as directed by the Engineer-in-charge RBR-SBBS-11 A

359.7

2079

747834.29

... More
BOQ;Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead beyond 50 m & upto 1000 m as per Technical Specification Clause 301 MORTH

1350

106

143289

... More
BOQ;Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. MORD

3597

20

73954.32

... More
BOQ;Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201 MORTH.

15000

4

68895



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.