Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Excavation
Opening Date21 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 6,24,09,827 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BOQ;Providing and applying tack coat with Bitumen emulsion (RS-1) (Rapid Setting) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom including conveyance of bitumen emulsion round the trip as per Technical Specification Clause 503 MoRT&H ,/5.2 including Contractors profit and overhead charges but excluding Seigniorage Charges complete for fiished item of work and as directed by the Engineer-in-charge. for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

11550

11

137791.5

... More
BOQ;Providing and laying of Dense Graded Bituminous Macadam with 100 - 120 TPH batch type hot mix plant producing an average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-10 of MoRT&H Specification 507 (5th revision) premixed with bituminous binder of VG-30 grade @ (4%-4.5%) of weight of total mixture and , transporting to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges all T&P and all other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc.including contractors profit and overheads complete for finished item of work and as directed by engineer in charge as per MoRT&H 507/5.6 for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

288.75

8611

2486426.25

... More
BOQ;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MoRTH/5.1 (for use on Wet mix macadam & WBM) etc. finished items of work and as directed by Engineers-in-charge. for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

5775

34

201201

... More
BOQ;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting withVibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.13 and Technical Specification Clause 406 MORD / MORTH. including Contractors profit and overhead charges but excluding Seigniorage Charges complete for fiished item of work and as directed by the Engineer-in-charge for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

1328.25

2103

2793309.75

... More
BOQ;Construction of granular sub-base by providing well graded /closed graded material,mixing in a mechanical mix plant at OMC, carriage of mixed material to site upto lead of 1000m spreading in uniform layers with motor grader on prepared surface,, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401. for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

1100

1821

2003100

... More
BOQ;Forming embankment /subgrade with borrowed useful earth from outside road boundary by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and excluding seigniorage charges, as per MoRT&H specification 305 (4th revision) - with a lead charges , including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge Morth -305. for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

2677.5

300

803250

... More
BOQ;Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD / 305 MORTH). for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

630

110

69300

... More
BOQ;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading , trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

7140

127

911706.6

... More
BOQ;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm by mechanical means in areas of thorny jungle, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH.including Contractors profit and Overhead charges but excluding Seignorage charges for finished items of work and as directed by Engineers-in-charge. for Laying of BT Road Connecting the Village to the Bund - 850 Rmt.

0.89

32034

28590.35

... More
BOQ;Supply and fixing of 250x200x120 mm size thermo plastic pole boxes IP 65 protection. Make : Hensel / Sintex / Sadhrish / EPP including labour charges for fixing etc complete item of work. For Lighting along Bund Road and & Other Electrification Works.

52

1227

63804

... More
BOQ;Supply and Transportation of 90 mm double walled corrugated HDPE duct made asper specification BSEN - 500 86/IS 16205 Part- 24 : 2017 with all accessories like couplers, bends, end caps, Ts etc., complete. Makes: Bajaj / CPE For Lighting along Bund Road and & Other Electrification Works.

800

199

159200

... More
BOQ;Supply and Laying of under ground XLPE Armoured cable of the following sizes. Makes: Polycab /Havells / Finolex. Fo50 Sqmm 3.5 Core Alluminium Cable For Lighting along Bund Road and & Other Electrification Works.

75

648

48600

... More
BOQ;Supply and Laying of under ground XLPE Armoured cable of the following sizes. Makes: Polycab /Havells / Finolex. For 16 Sqmm 4 Core Alluminium Cable For Lighting along Bund Road and & Other Electrification Works.

825

318

262350

... More
BOQ;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 70 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete. (Data 15.6.1) For Lighting along Bund Road and & Other Electrification Works.

775

375

290625

... More
BOQ;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5 Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II). For Lighting along Bund Road and & Other Electrification Works.

1

18940

18940

... More
BOQ;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) For Lighting along Bund Road and & Other Electrification Works.

3

6635

19905

... More
BOQ;Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete. (Data 5.2.5) For Lighting along Bund Road and & Other Electrification Works.

45

181

8145

... More
BOQ;Fabrication, supply, transportation and erection of outdoor type 16SWG CRCA sheet steel enclosure for power control cubicle/panel board etc including cutting, bending drilling, welding and reveting etc complete with 7 tank process and painting with powder coating including cost and conveyance of all materials i.e., Digital Ammeter(0-600A)-1no, Digital Voltmeter(0-500V)-1no, indicator lamps-3nos, 125 A MCCB 4 Pole as incommer and outgoings as 63 A MCCB 4 Pole- 4nos and labour charges for fixing complete finished item of work. Metring equipment makes:HPL/MECO/CONZERVE. SWITCHGEAR Makes:Legrand/Schneider. For Lighting along Bund Road and & Other Electrification Works.

1

150971

150971

... More
BOQ;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 9 Nos 6- 32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch. For Lighting along Bund Road and & Other Electrification Works.

3

29256

87768

... More
BOQ;Fabrication, Transportation and supply of 1.5 Mtr decorative galvanized Single arm bracket with PU paint complete with all accessories with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL For Lighting along Bund Road and & Other Electrification Works.

52

6056

314912

... More
BOQ;Fabrication, Transportation and supply of hotdip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door openingarrangement, including chain for anti theft mechanism, supply of suitable boards withbakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 7.50 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template or equivalent Makes: BAJAJ / VALMONT / TRANSRAIL /SKIPPER / UTKARSH / LAASMA / CONSOUL. For Lighting along Bund Road and & Other Electrification Works.

52

15031

781612

... More
BOQ;Erection charges for 7.50 Mts long Octagonal pole on bridge kerb portion (R.C.C). dulyprovided 4 Nos 8" Anchor bolts/ M20xsuitable "J" type bolts etc duly drilling holes to RCC slab and with V.C.C. M.15 concrete for base concreting up to a height of 8" with necessary Reinforcement work etc. including cost and con veyance of all material and all labour charges etc. complete as directed by the department officers. For Lighting along Bund Road and & Other Electrification Works.

52

5340

277680

... More
BOQ;Supply and transportation of 60/65W LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Driver surge protection more than 4KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with 5 years warranty. LUMINAIRE MAKE :PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM / Goldmedal / Silicon / Leksa / Orient / HPL. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. (Data 7.9.8) For Lighting along Bund Road and & Other Electrification Works.

52

6004

312208

... More
BOQ;Supply, transportation and fixing of 22W, 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 50,000 burning hours with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. For Lighting along Bund Road and & Other Electrification Works.

10

771

7710

... More
BOQ;Supply and fixing of 10W LED mirror light of 600mm length with all standard accessories diffuser etc and including labour charges for fixing etc., complete. Makes: Philips/Crompton/GE (Data 8.1.1) For Lighting along Bund Road and & Other Electrification Works.

6

510

3060

... More
BOQ;Supply and fixing of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections etc., completeof makes Crompton / Havells Ventil Air-DB / Orient hill air. For Lighting along Bund Road and & Other Electrification Works.

6

2030

12180

... More
BOQ;Supply and fixing SPN Distribution board 8 Way with IP-43 protection suitable for single phase 40 A Double Pole (DP) Isolator as incomer and 6 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand DX3/Schneider Acti9/Siemens.( Data 4.4.1) For Lighting along Bund Road and & Other Electrification Works.

2

8059

16118

... More
BOQ;Supply and fixing of 20A 3 pin 2 module socket with 20A switch control (with indicator) on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Legrand Arteor / Schneider Zen celo Blenge / Crabtree Murano. (Data 2.1.6) For Lighting along Bund Road and & Other Electrification Works.

2

1029

2058

... More
BOQ;Supply and fixing of 10A 3/2pin 2 module socket with 10A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Legrand Arteor / Schneider Zen celo Blenge / Crabtree Murano. (Data 2.1.4) For Lighting along Bund Road and & Other Electrification Works.

6

734

4404

... More
BOQ;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable IS:694/1990, IS 17048 with one run of 56/0.3mm (4 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab For Lighting along Bund Road and & Other Electrification Works.

55

221

12155

... More
BOQ;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable IS:694/1990, IS 17048 with one run of 36/0.3mm (2.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab For Lighting along Bund Road and & Other Electrification Works.

75

176

13200

... More
BOQ;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS/HFFR P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for light points in Buildings. Makes: Legrand Arteor/Honeywell Blenge Plus/L & T Englaze For Lighting along Bund Road and & Other Electrification Works.

22

1045

22990

... More
BOQ;Supply and laying of 25mm dia P.V.C. pipe pipe of medium grade with IS:9537 part 3 rigid pipe concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well metal deep box including all labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex. For Lighting along Bund Road and & Other Electrification Works.

45

118

5310

... More
BOQ;Supply and laying of 25mm dia PVC pipe of heavy grade with IS:9537 part 3 rigid pipe concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex. For Lighting along Bund Road and & Other Electrification Works.

55

110

6050

... More
BOQ;Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all accessories as per the standard specifications. (Rate as per Quotation) for Borewell and Pumpsets.

1

6000

6000

... More
BOQ;Supply, Transportation and fixing of 50mm dia 90 degree bend with length of 20cm (Center to face) galvanised GI bends heavy duty with threaded at both ends for installing the pump set including cost and conveyance of all materials, taxes etc., complete. ELEC-5.13.3 for Borewell and Pumpsets.

1

324

324

... More
BOQ;Supply, Transportation and fixing of 50mm dia MS threaded Flanges 2 Nos with nuts and bolts including cost and conveyance of all materials, taxes etc., complete. for Borewell and Pumpsets.

1

420

420

... More
BOQ;ELEC-5.13.6 Supply, Transportation and fixing of 50mm dia 450mm length, 12mm thickness and 75mm wide MS Clamp set with required nuts and bolts. for Borewell and Pumpsets.

2

545

1090

... More
BOQ;Supply and Fixing of 150mm dia galvanised bore cover for Borewell and Pumpsets.

1

295

295

... More
BOQ;S& F GI union 50 mm nominal size Ist Quality for Borewell and Pumpsets.

1

189

189

... More
BOQ;Supply and delivery and Fixing of 7/20 service wire 3 core including labour charges

100

120

12000

... More
BOQ;Manufacture, supply, & delivery of Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.) for 16.0 kg/sqcm (SDR 17) for 40 mm dia 16.0 kg/sqcm (for Out side the bore) for Borewell and Pumpsets.

100

119

11900

... More
BOQ;Manufacture, supply, & delivery of Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.) for 16.0 kg/sqcm (SDR 17) for 50 mm dia 16.0 kg/sqcm for Borewell and Pumpsets.

230

186

42780

... More
BOQ;Supply of 3 Core 2.5 sqmm Flat Copper cable of ISI for Submersible Motors. Makes : Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Payal / Finecab / Gemini / Vimal / Suncab / Delton / Ollvin / Airson / Stanjo/ Nakoda / Beljin / Savera Champion / Rhino for 50 mm dia 16.0 kg/sqcm for Borewell and Pumpsets.

245

133

32585

... More
BOQ;Supply and Transportation of control panel for three phase submersible motors above 5 HP up to 7.5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark for Borewell and Pumpsets.

1

20451

20451

... More
BOQ;Supply and Transportation of 7.5 Hp star rated 5-10 Stage Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryan Varsha/ Lubi / Falcon for Borewell and Pumpsets.

1

56580

56580

... More
BOQ;Supply and Fixing of PVCs Casing Pipes for potable water supplies conforming to IS :4985/2000 (3rd revision) with bell ends (Socket) and including labour charges etc., 6.0 Kgs/cm2 For 250 mm dia 6.0 kg/cm2 for Borewell and Pumpsets.

3

1603

4809

... More
BOQ;Supply and Fixing of PVCs Casing Pipes for potable water supplies conforming to IS :4985/2000 (3rd revision) with bell ends (Socket) and including labour charges etc., 6.0 Kgs/cm2 For 180mm dia 6.0 kg/cm2 for Borewell and Pumpsets.

45

799

35955

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.for 211-240 Rmt for Borewell and Pumpsets.

30

1090

32700

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. for 181-210 Rmt for Borewell and Pumpsets.

30

985

29550

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. for 151-180 Rmt for Borewell and Pumpsets.

30

860

25800

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. for 121-150 Rmt for Borewell and Pumpsets.

30

695

20850

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.for 91-120 Rmt for Borewell and Pumpsets.

30

575

17250

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. for 61-90 Rmt for Borewell and Pumpsets.

30

495

14850

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.for 31-60 Rmt for Borewell and Pumpsets.

30

390

11700

... More
BOQ;Drilling of 2 Nos of Bore well with DTH Rig per RM Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. for 0-30 Rmt for Borewell and Pumpsets.

30

280

8400

... More
BOQ;Geological Survey Charges for plain area, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. for Borewell and Pumpsets.

1

1857

1857

... More
BOQ;Providing and laying of coarse sand from approved quarry, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. for Septic Tank with Soak Pit

5.63

3198

18004.74

... More
BOQ;Providing and laying of 20mm coarse aggregates from approved quarry, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. for Septic Tank with Soak Pit

9.38

1539

14435.82

... More
BOQ;Providing and laying of 40mm coarse aggregates from approved quarry, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. for Septic Tank with Soak Pit

6.25

1200

7500

... More
BOQ;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Steel Manufacturers within Telangana with minimum integrated installed Production Capacity of 2 Lakh MT per annum (AF star TMT / MS Life TMT, Radha TMT, SUGNA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work (APSS No.126) for Septic Tank with Soak Pit

0.95

75255

71492.25

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for 125mm Thick Slab. for Septic Tank with Soak Pit

28.63

1623

46466.49

... More
BOQ;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). (Ground Floor.) for Septic Tank with Soak Pit

48

602

28896

... More
BOQ;Plastering 12mm thick in two coats using screened sand (with 100% river sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for Septic Tank with Soak Pit

95

551

52345

... More
BOQ;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) for Septic Tank with Soak Pit

17.83

7658

136542.14

... More
BOQ;Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing and cost of overheads & contractors profit etc., complete for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX. FOR BED OF SUMP AND SEPTIC TANK. for Septic Tank with Soak Pit

3.6

5952

21427.2

... More
BOQ;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310) for Septic Tank with Soak Pit

5

40

200

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING for Septic Tank with Soak Pit

2.08

4828

10043.76

... More
BOQ;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means. for Septic Tank with Soak Pit

78.55

127

10030.05

... More
BOQ;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work. for Water Supply & Sanitary Arrangements

5000

11

56800

... More
BOQ;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) for 110 mm dia for Water Supply & Sanitary Arrangements

60

530

31800

... More
BOQ;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) for 75mm dia for Water Supply & Sanitary Arrangements

60

360

21600

... More
BOQ;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. (25mm Nominal bore) for Water Supply & Sanitary Arrangements

10

1538

15380

... More
BOQ;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 13.5 for 28.60mm OD pipe for Water Supply & Sanitary Arrangements

25

267

6675

... More
BOQ;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 13.5 for 22.2 mm OD pipe for Water Supply & Sanitary Arrangements

35

202

7070

... More
BOQ;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 13.5 for 15.90mm OD pipe for Water Supply & Sanitary Arrangements

45

176

7920

... More
BOQ;Supplying & fixing 4 " x 24 " (101.6x609.6mm) white glazed porcelain channel fixed in brick masonry white cement pointing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. for Water Supply & Sanitary Arrangements

6

1012

6072

... More
BOQ;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 3' 0" x 2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work for all floors. for Water Supply & Sanitary Arrangements

5

2481

12405

... More
BOQ;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm, fitted with 15 mm brass body CP finish self closing tap push type conforming to IS 1711 and 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects. for Water Supply & Sanitary Arrangements

5

4879

24395

... More
BOQ;S&F of Chromium plated finish stainless steel body towel rail 24'' with 10 years warranty including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work. for Water Supply & Sanitary Arrangements

11

2028

22308

... More
BOQ;S&F 15 mm nominal size 152.0 mm CP finish iron body shower rose, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. for Water Supply & Sanitary Arrangements

4

244

976

... More
BOQ;S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with hand shower with a provision for over head shower with 115 mm long bend pipe on upper side, connecting legs & wall flanges conforming to IS 8931 with 10 years warranty, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. for Water Supply & Sanitary Arrangements

4

4563

18252

... More
BOQ;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work. for Water Supply & Sanitary Arrangements

12

4008

48096

... More
BOQ;Supplying and fixing Rectangular Mirror Frameless of size 609.6 mm x 914.4 mm including cost and conveyance of all materials to site, all operational,incidental , labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. for Water Supply & Sanitary Arrangements

10

6348

63480

... More
BOQ;Supply and fixing CP finish brass soap dish of approved make with screws, including cost and conveyance of all materials to site, all operational, incidental, labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge. for Water Supply & Sanitary Arrangements

7

716

5012

... More
BOQ;Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects. for Water Supply & Sanitary Arrangements

7

3558

24906

... More
BOQ;Supplying & Fixing Orissa Pan White glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap : 580 mm x 440 mm duly providing constructing Brick masonry seat using 2nd class bricks, CC Squatting plate in P.C.C 1:2:4, S&F PVC Low level system with internal components & short bend: 10 Litres capacity Single Flush, S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and S&F 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials , operational, incidental, labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work. for Water Supply & Sanitary Arrangements

2

5956

11912

... More
BOQ;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'S' trap with CI short Connector & 4" dia CP thimble pipe: 150 mm long, best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and 15 mm nominal size PVC connection with brass union nut C.P coated all of approved make, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work. for Water Supply & Sanitary Arrangements

9

7324

65916

... More
BOQ;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work. for Water Supply & Sanitary Arrangements

20

194

3880

... More
BOQ;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 3'-0" Depth for Water Supply & Sanitary Arrangements

4

9871

39484

... More
BOQ;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges,including Contarctor's profit and overhead charges, complete for finished item of work and as directed by the Engineer-in-charge . (152.4 mm (6") dia - 3' Depth) for Water Supply & Sanitary Arrangements

20

887

17740

... More
BOQ;Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (APSS No. 1328) FOR Toilet Block

24

421

10104

... More
BOQ;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (APSS No. 901 & 903). (First Floor.) FOR Toilet Block

70

649

45430

... More
BOQ;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Toilet Block

108.31

1500

162465

... More
BOQ;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (APSS No.707 & 701) FOR Toilet Block

70

969

67830

... More
BOQ;Providing, supplying & fixing of Fixed Louvered Ventilator made from multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete, including all incidental, labour charges, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Toilet Block

3.6

7279

26204.4

... More
BOQ;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge during exection - for all floors. FOR Toilet Block

48.9

293

14327.7

... More
BOQ;Supplying and fixing of Single shutter door with factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long with 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position including cost of 1 no. Stainless Steel Aldrops (IS:15834) 200 mm long, 1 no. Stainless Steel Flat Latches: 200 mm long, 1 no. Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 150 mm Long, 2 no.s Stainless Steel Door Handles 150 mm Long, 3 no.s Stainless Steel Butt hinges (IS:12817)- 125 mm Long, 1 no. Heavy duty Stainless Steel Door stopper, 1 no. Rubber/ Nylon door stop bushes including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge ., as per APSS 1001 & 1002. FOR Toilet Block

21.74

5230

113700.2

... More
BOQ;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Toilet Block

296.03

158

46772.74

... More
BOQ;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Toilet Block

99.31

284

28204.04

... More
BOQ;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) FOR Toilet Block

325.34

551

179262.34

... More
BOQ;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge .(SS 901,903 & 904) FOR Toilet Block

70

576

40320

... More
BOQ;Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge ., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) FOR Toilet Block

73.19

935

68432.65

... More
BOQ;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) FOR Toilet Block

24.23

7658

185553.34

... More
BOQ;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Steel Manufacturers within Telangana with minimum integrated installed Production Capacity of 2 Lakh MT per annum (AF star TMT / MS Life TMT, Radha TMT, SUGNA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.126) FOR Toilet Block

2.79

75255

209961.45

... More
BOQ;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc all charges for mixing, laying concrete in position, curing & lift charges andincluding Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING FOR Toilet Block

1.61

6150

9901.5

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR lintels FOR Toilet Block

0.79

14931

11795.49

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Roof Slab 125mm Thick FOR Toilet Block

70

1623

113610

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR roof beams FOR Toilet Block

3.59

13583

48762.97

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR columns FOR Toilet Block

5.69

14889

84718.41

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR plinth beam FOR Toilet Block

3.59

14354

51530.86

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Pedastals FOR Toilet Block

1.82

11868

21599.76

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Footings FOR Toilet Block

10.13

11142

112868.46

... More
BOQ;Raised Pointing to RR/ CRS Masonry in CM (1:3) (50% river sand and 50% manufactured sand) including cost and conveyance of all materials in site, curing, labour charges etc,including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Toilet Block

20.4

128

2611.2

... More
BOQ;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing andincluding Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge in foundation and basement. (APSS No. 601 & 615). FOR Toilet Block

11.63

4748

55219.24

... More
BOQ;Filling with carted gravel by manual means in trenches,sides of foundations and basement in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., andincluding Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS NO.309&310). FOR Toilet Block

28

238

6664

... More
BOQ;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P andincluding Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge for (APSS NO.309&310) FOR Toilet Block

52.21

40

2088.4

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No. 402) MACHINE MIXING FOR Toilet Block

11.79

4828

56930.73

... More
BOQ;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.FOR Toilet Block

65.26

127

8333.05

... More
BOQ;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR View Deck

600

788

472800

... More
BOQ;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water and tiles etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR View Deck

150

921

138150

... More
BOQ;Supply of Galvanized Roofing Deck sheets with 1mm thickness, Coating: Zinc coating Z125 / Z275/ Z 500 GSM. Yield Strength: E250. crest to crest width 130 mm length 12 metres : profile width 982mm and profile depth 44mm CR steel as per IS-513 HR steel as per IS 1079 and Galvanised Steel as per IS 277, including all incidental, labour charges, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR View Deck

1589.63

158

251161.54

... More
BOQ;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.1200, 1207 & 1211) in all floors. FOR View Deck

600

206

123600

... More
BOQ;Providing Structural Steel hollow Square & Rectangular sections of 310 MPA grade conforming to IS 4923-1997 of all sizes , cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all structural steel sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges, including Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (Approved Makes: TATA / SAIL / JSW / APL APOLLO.) FOR View Deck

10000

197

1974600

... More
BOQ;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge for (APSS NO.309&310) FOR View Deck

144

40

5760

... More
BOQ;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Steel Manufacturers within Telangana with minimum integrated installed Production Capacity of 2 Lakh MT per annum (AF star TMT / MS Life TMT, Radha TMT, SUGNA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work (APSS No.126) FOR View Deck

9.18

75255

690840.9

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Deck Concrete FOR View Deck

22.5

7113

160042.5

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Pedestals FOR View Deck

10.8

11868

128174.4

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Footings FOR View Deck

67.5

11142

752085

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc.,including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No. 402) MACHINE MIXING FOR View Deck

13.5

4828

65187.86

... More
BOQ;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means. FOR View Deck

180

127

22984.2

... More
BOQ;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge , complete for finished item of work. FOR View Point Gazibos and Watch tower.

360

788

283680

... More
BOQ;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of premium colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.701 & 707) FOR View Point Gazibos and Watch tower.

300

5266

1579800

... More
BOQ;Supply and fixing of roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove, including cost and conveyance of all materials, all operational, incidental labour charges, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (Tile Profile as per Approved Drawings.) FOR View Point Gazibos and Watch tower.

300

957

287100

... More
BOQ;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.1200, 1207 & 1211) in all floors. FOR View Point Gazibos and Watch tower.

486

206

100116

... More
BOQ;Providing Structural Steel hollow Square & Rectangular sections of 310 MPA grade conforming to IS 4923-1997 of all sizes , cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all structural steel sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges, including Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (Approved Makes: TATA / SAIL / JSW / APL APOLLO.) FOR View Point Gazibos and Watch tower.

8100

197

1599426

... More
BOQ;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge ., complete for finished item of work for (APSS NO.309&310) FOR View Point Gazibos and Watch tower.

115.2

40

4608

... More
BOQ;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Steel Manufacturers within Telangana with minimum integrated installed Production Capacity of 2 Lakh MT per annum (AF star TMT / MS Life TMT, Radha TMT, SUGNA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.126) FOR View Point Gazibos and Watch tower.

6.96

75255

523774.8

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PEDASTALS FOR View Point Gazibos and Watch tower.

12.96

11868

153809.28

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS FOR View Point Gazibos and Watch tower.

54

11142

601668

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (APSS No. 402) MACHINE MIXING FOR View Point Gazibos and Watch tower.

55.8

4828

269443.13

... More
BOQ;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means. FOR View Point Gazibos and Watch tower.

144

127

18387.36

... More
BOQ;Carting away unuseful excavated rock/Earth at site and pipe line trench earth including loading and unloading transportation , (lead upto 5km) excluding initial lead away from the work spot, including Contarctor's profit and overhead charges, complete for finished item of work FOR Bathukamma Ghat.

462.96

90

41804.88

... More
BOQ;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge ., complete for finished item of work. FOR Bathukamma Ghat.

1458

788

1148904

... More
BOQ;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water and tiles etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Bathukamma Ghat.

1350

921

1243350

... More
BOQ;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge in foundation and basement. (APSS No. 601 & 615). FOR Bathukamma Ghat.

49.21

4748

233637.21

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (APSS No. 402) MACHINE MIXING FOR Bathukamma Ghat.

212.16

4828

1024459.74

... More
BOQ;Forming embankment /subgrade with borrowed useful earth from outside road boundary by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and excluding seigniorage charges, as per MoRT&H specification 305 (4th revision) - with a lead charges , including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge Morth -305. FOR Bathukamma Ghat.

675

300

202500

... More
BOQ;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means. FOR Bathukamma Ghat.

462.96

127

59114.79

... More
BOQ;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm by mechanical means in areas of thorny jungle, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH.including Contractors profit and Overhead charges but excluding Seignorage charges for finished items of work and as directed by Engineers-in-charge. FOR Bathukamma Ghat.

0.14

32034

4324.59

... More
BOQ;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections as per the need and 102 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gaskets for sash & Glazing bead shall be co-extruded with Grey colour soft PVC System shall be provided with 4 no?s of 3D Hinges for each shutter and multipoint locking with keys with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including Contarctor's profit and overhead charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Entrance Arch

2.52

9707

24461.64

... More
BOQ;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (62 mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including Contarctor's profit and overhead charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Entrance Arch

4.47

7746

34624.62

... More
BOQ;Providing and fixing factory made extruded WPC (Wood Polymer Composite) solid white colour board for cupboards and bathroom/kitchen cabinet/partitioning/wall panelling/wall cladding of required size comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately) - 18mm Thick, including all incidental, labour charges, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . complete for finished item of work.FOR Entrance Arch

20.28

3179

64470.12

... More
BOQ;Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (APSS No.701 & 710) FOR Entrance Arch

2.16

454

980.64

... More
BOQ;Providing Access Scaffolding for fixing of ACP Cladding for height up to 7.32m including cost and conveyance of all materials to site, all operational, incidental, labor charges etc.,including Contarctor's profit and overhead charges, complete for finished item of work and as directed by the Engineer-in-charge . FOR Entrance Arch

236.86

319

75558.34

... More
BOQ;Supplying and fixing aluminium composite cladding with skin material 0.5 mm thick aluminium sheet cover material natural polyethylene aluminium cladding panel fixed with extruded aluminium basis frame (50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on structural steel work including necessary accessories complete in all respects including all labour charges etc., complete for finished item of work but excluding cost of structural steel fabrication, scaffolding charges, if any, ACP Cladding - 4 mm thick, including all incidental, labour, including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . complete for finished item of work. FOR Entrance Arch

227.95

3902

889460.9

... More
BOQ;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.1200, 1207 & 1211) in all floors. FOR Entrance Arch

337.5

206

69525

... More
BOQ;Providing Structural Steel hollow Square & Rectangular sections of 310 MPA grade conforming to IS 4923-1997 of all sizes , cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all structural steel sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges, including Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (Approved Makes: TATA / SAIL / JSW / APL APOLLO.) FOR Entrance Arch

6750

197

1332855

... More
BOQ;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310) FOR Entrance Arch

51.2

40

2048

... More
BOQ;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Steel Manufacturers within Telangana with minimum integrated installed Production Capacity of 2 Lakh MT per annum (AF star TMT / MS Life TMT, Radha TMT, SUGNA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.126) FOR Entrance Arch

2.54

75255

191147.7

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR pedastals FOR Entrance Arch

15.79

11868

187395.72

... More
BOQ;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding seignorage charges and cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR footing FOR Entrance Arch

8.1

11142

90250.2

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . (APSS No. 402) MACHINE MIXING FOR Entrance Arch

3.78

4828

18252.6

... More
BOQ;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means. FOR Entrance Arch

64

127

8172.16

... More
BOQ;Supply and fixing of granite stone benches of minimum length of 5 feet with flamed finish of approved design and colour including the cost of earthwork, excavation, laying of PCC 1:2:4 in required dimensions, fixing charge, labour charges, making charges, incidental and operational charges, contractors, profit etc. complete for finished item of work and as directed by the Engineer-in-Charge. for Widening and Strengthening of Main Bund - 750 Rmt

20

22000

440000

... More
BOQ;Supply and fixing of precast concrete blocks for paving of M-40 grade and thickness not less than 80 mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including 75mm thick bed of manufactured sand, labour charges for laying & fixing of precast concrete blocks for paving of all grades, any thickness, all sizes & shapes including all labour charges for loading & unloading, laying to desired lines and levels complete excluding cost of cement, sand, water, electricity etc, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. for Widening and Strengthening of Main Bund - 750 Rmt

1350

956

1290600

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING for Widening and Strengthening of Main Bund - 750 Rmt

202.5

4828

977817.83

... More
BOQ;Painting two coats including primer coat (3 Coats) after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . for Widening and Strengthening of Main Bund - 750 Rmt

750

173

129750

... More
BOQ;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually,using concrete batching and mixing plant including contractors profit and overhead charges but excluding seinorage charges all complete as per clause 408 MORTH, complete for finished item of work and as directed by the Engineer-in-charge as per MorTH 408 /8.2 B, RBR-TSRA-30(B). for Widening and Strengthening of Main Bund - 750 Rmt

1500

577

865500

... More
BOQ;Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes as per Specification 803 MORTH etc. including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge for Widening and Strengthening of Main Bund - 750 Rmt

225

380

85500

... More
BOQ;Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified Grading II (13 mm nominal size), premixed with bituminous binder VG 30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic big paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects with all leads (MORTH 5.8)including Contractors profit and overhead charges but excluding Seigniorage Charges complete for fiished item of work and as directed by the Engineer-in-charge MoRT&H 509/5.8

165

9670

1595550

... More
BOQ;Providing and applying tack coat with Bitumen emulsion (RS-1) (Rapid Setting) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom including conveyance of bitumen emulsion round the trip as per Technical Specification Clause 503 MoRT&H ,/5.2 including Contractors profit and overhead charges but excluding Seigniorage Charges complete for fiished item of work and as directed by the Engineer-in-charge. for Widening and Strengthening of Main Bund - 750 Rmt

2250

11

26842.5

... More
BOQ;Providing and laying of Dense Graded Bituminous Macadam with 100 - 120 TPH batch type hot mix plant producing an average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-10 of MoRT&H Specification 507 (5th revision) premixed with bituminous binder of VG-30 grade @ (4%-4.5%) of weight of total mixture and , transporting to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges all T&P and all other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc.including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per MoRT&H 507/5.6 for Widening and Strengthening of Main Bund - 750 Rmt

78.75

8611

678116.25

... More
BOQ;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MoRTH/5.1 (for use on Wet mix macadam & WBM) etc. including Contarctor's profit and overhead charges, complete for finished item of work and as directed by the Engineer-in-charge . for Widening and Strengthening of Main Bund - 750 Rmt

1125

34

39195

... More
BOQ;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting withVibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.13 and Technical Specification Clause 406 MORD / MORTH. including Contractors profit and overhead charges but excluding Seigniorage Charges complete for fiished item of work and as directed by the Engineer-in-charge for Widening and Strengthening of Main Bund - 750 Rmt

258.75

2103

544151.25

... More
BOQ;Construction of granular sub-base by providing well graded /closed graded material,mixing in a mechanical mix plant at OMC, carriage of mixed material to site upto lead of 1000m spreading in uniform layers with motor grader on prepared surface,, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401. including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge for Widening and Strengthening of Main Bund - 750 Rmt

225

1821

409725

... More
BOQ;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm by mechanical means in areas of thorny jungle, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH.including Contractors profit and Overhead charges but excluding Seignorage charges for finished items of work and as directed by Engineers-in-charge. for Widening and Strengthening of Main Bund - 750 Rmt

0.02

32034

720.77

... More
BOQ;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece set over a base coat of CM (1:3) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.701 & 707)

622.5

4946

3078885

... More
BOQ;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) for Widening and Strengthening of Main Bund - 750 Rmt

51.75

7658

396301.5

... More
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No. 402) MACHINE MIXING for Widening and Strengthening of Main Bund - 750 Rmt

42.75

4828

206428.21

... More
BOQ;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge (APSS No.1200, 1207 & 1211) in all floors. for Widening and Strengthening of Main Bund - 750 Rmt

900

206

185400

... More
BOQ;Providing and Fixing of Railing using Structural Steel hollow Square & Rectangular sections of 240 MPA grade conforming to IS 4923-1997 as per approved drawing, including all incidental, labour charges, overheads and contractors profit, etc. including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . for Widening and Strengthening of Main Bund - 750 Rmt

15000

155

2337750

... More
BOQ;Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete ( rubble stones : 0.275 cum/sqm)including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge . for Widening and Strengthening of Main Bund - 750 Rmt

2250

377

849397.5

... More
BOQ;Forming embankment /subgrade with borrowed useful earth from outside road boundary by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and excluding seigniorage charges, as per MoRT&H specification 305 (4th revision) - with a lead charges , including Contarctor's profit and overhead charges excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge Morth -305. for Widening and Strengthening of Main Bund - 750 Rmt

44400

300

13320000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.