Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Opening Date16 Mar 2024
Closing Date3 Apr 2024
Tender Amount₹ 77,69,657 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)

2500

2930

879237

... More
Item;Cost of Topiry/Plams

850

2500

2125000

... More
Item;cost of Hedge plants

25000

30

750000

... More
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading where-ever departmental vehicleOver and above 3km lead add following rates per kms are not provided lead 22km

25000

404

101190

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt)) Plams=20Nos Topiry=20

850

746

634610

... More
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material

2500

756

1891225

... More
Item;Laying of carpet grass and ramming

1500

58

87150

... More
Item;Cost of carpet grass

1500

135

202500

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass

1500

333

500625

... More
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete = 1500 Sqmt X 0.30 = 600 Cum

300

174

52440

... More
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation, plastic materials Basic rate: 520/- + 20% Municipal limits on labour component

50

520

26000

... More
Item;Engaging of JCB on hire charges including fuel and driver batha as per the direction of the departmental authority

20

850

17000

... More
Item;for Development of Greenery, Soft landscape work at Peddagolkond Interchange during the year 2023-24

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.