Hyderabad Metropolitan Development Authority Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 54,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
583685Tender No
HMDA/DEV/CE/24/03/2024-25, Date:18.03.2025Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item;Filling with 20mm Metal (Aggregate) in Rain water harvesting Pit including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge. for SITE DEVELOPMENT WORK
12
1585
19020.12
... More
Item;Filling with 40mm Metal (Aggregate) in Rain water harvesting Pit including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for SITE DEVELOPMENT WORK
12
1245
14943.6
... More
Item;Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge. (APSS No. 501 & 504). for SITE DEVELOPMENT WORK
13.55
9239
125190.21
... More
Item;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge in all floors.( APSS No.126) for SITE DEVELOPMENT WORK
3.03
77684
235385.37
... More
Item;Supply and placing of the M25 grade Design Mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge.for Side walls - 150mm thk for SITE DEVELOPMENT WORK
21.45
14978
321298.69
... More
Item;Supply and placing of the M25 grade Design Mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge. for Bottom Slab - 150mm thk for SITE DEVELOPMENT WORK
14.63
11527
168649.67
... More
Item;Plain Cement concrete (1:4:8) using 40mm metal with Machine mixing including cost and conveyance of all materials, labour charges for laying vibrating curing etc., upto plinth level. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for SITE DEVELOPMENT WORK
13.44
5224
70215.94
... More
Item;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge (APSS NO. 309 & 310) for SITE DEVELOPMENT WORK
76.6
45
3496.02
... More
Item;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge etc as per SS - 20 B (APSS 308). Ordinary Soil-Manual Means-Upto 3 m depth. for SITE DEVELOPMENT WORK
157.44
321
50620.11
... More
Item;Providing and fixing precoated galvanised steel sheet roofing accessories of total coated thickness 0.50mm (base metal of minimum 0.45mm thickness with total coating thickness of 0.05mm) with Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : Gutter (600 mm over all girth). including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for SITE DEVELOPMENT WORK
129.86
792
102868.6
... More
Item;Supply, Laying and Fixing of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over a base coat of 50mm thk sand bed including cost and conveyance of all materials like sand, water tiles etc.,to site, labour charges for loading & unloading, laying to desired lines and levels complete and including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge. for plinth protection
175.5
813
142837.7
... More
Item;Plain Cement concrete Grade M20 - Nominal Mix using 20mm graded metal with Machine mixing including cost and conveyance of all materials, labour charges for laying vibrating curing etc., upto plinth level. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for plinth protection
30.72
5412
166269.54
... More
Item;Plain Cement concrete (1:4:8) using 40mm metal with Machine mixing including cost and conveyance of all materials, labour charges for laying vibrating curing etc., upto plinth level. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for plinth protection
46.08
5224
240740.35
... More
Item;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary Soil-Manual Means-Upto 3 m depth. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for plinth protection
69.21
321
22252.4
... More
Item;Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for plinth protection
60
155
9316.2
... More
Item;Carting away of debries to a lead of 20 KM (the rate including conveyance charges, labour charges for loading, unloading charges) including idle hire charges of truck etc. complete as directed by the Departmental Authorities of the work. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Debris carting
50.89
551
28081.1
... More
Item;Relaying of new shabad stone floor Providing and fixing of flooring with Polished Shahabad/ Tandur stone slabs of all sizes between 15 - 18 mm thickness over 20mm (average) thick base of combination mortar 1:1:1 (1 lime : 1 surkhi : 1 coarse sand), including pointing with combination mortar 1:1:1 (1 lime : 1 surkhi : 1 coarse sand). including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For flooring
83.93
899
75458.95
... More
Item;Dismantling of flooring Careful dismantling of Shabad stone flooring laid in lime mortar including stacking of serviceable material and disposal of unserviceable material. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For flooring
83.93
14
1239.65
... More
Item;Abrasive cleaning exterior wall Abrasive cleaning- Stone cleaning of dirt and dust accumulation, salt deposition, paints, megetation growth with mini sand blaster of working pressure from 0.1 bar to 5.0 bar mix using abbrasive garnet including cleaning thesite after the completion etc., including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for Wall
15.11
2150
32486.5
... More
Item;Application of lime based Paint- External Painting to new walls with one coat lime based cement primer of exterior grade and two coats of lime based paint exterior grade for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-chargein all floors. for Wall
847.88
304
258137.07
... More
Item;Application of lime based Paint- internal Painting to walls with 2 coats of paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. for Internal walls and complete it with paper/ cloth polishing including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for Wall
1038.31
219
227888.28
... More
Item;Sibara rendering on walls Sibara with a mixture of lime putty (screened and pressed through) and organic materials mixed with Gur, Bilgri, Urd and other ingredients followed by grinding to fine consistency for smooth finishing of mix 1:2 (1 lime : 2 marble powder). including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for Wall
401.85
308
124079.22
... More
Item;Plastering on walls Plastering the internal and external surfaces using traditional lime mortar 1:2 ( 1 lime putty : 2 coarse sand) mixed with organic additives such as aloevera/ jaggery including ramming of the plaster work till the shrinkage cracks disappears and curing complete. Lime plastering in layers up to 50 mm thickness to match with the original. Upto a height of 6 m including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for Wall
401.85
1188
477606.76
... More
Item;Antifungal Wash Treatment on walls Providing and applying antifungal wash treatment using 3% solution of sodium penta chlorophenate, of reputed brand and manufacturer, on cleaned sand stone surface at desired locations as per direction of Engineer-in-charge (The rate is inclusive of all materials & labours involved except scaffolding). for Wall
401.85
67
26992.26
... More
Item;Clean removal of lime plaster from walls for resisting capillary action and raking out joints 20 mm deep or from terraced roof and raking out joints up to 50 mm deep including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge. for Wall
401.85
9
3652.82
... More
Item;Spouts Supplying and fixing of 110mm dia SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc with solvent jointing as per standard practice including cost and conveyance of all materials to site, concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge at all floor levels. For Roof
176.8
559
98951.42
... More
Item;Terrace floor work Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : In 75x75 mm deep chase including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
119.1
133
15873.65
... More
Item;Terrace floor work Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
26
254
6624.02
... More
Item;Terrace floor work Picking up and scraping the old surface of lime concrete in roof terracing and applying 25mm layer of lime mortar 1:1:1 mixed with brick aggregate of zero size & water proofing compound including ramming, rubbing & watering complete the surface to match with the original. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
361
1362
491754.2
... More
Item;Terrace floor work Providing and laying position lime concrete with graded brick aggregate 20 to 25 mm size an 50% composite lime mortar 1:1:1 ratio (1 lime : 1 surkhi : 1 coarse sand) mixed with belgiri, gur & jute (fibre) in roof terracing including supply of all materials labour T. & P. etc. required for proper completion of work. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
25.27
18586
469689.95
... More
Item;Terrace floor work Dismantling old & decayed lime concrete on roof terrace bit by bit with chisels and including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
26.6
2612
69485.05
... More
Item;Galvanised Iron sheets (Relaying) Roofing with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including material & labour charges and overheads & contractors profit etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
232.04
889
206320.69
... More
Item;Galvanised Iron sheets (Removal) Carefully dismantling G.S. Sheet roofing including ridges, hips, valleys and gutters etc., and stacking of serviceable material and disposal of unserviceable material within 50 metres lead including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge. For Roof
232.04
136
31661.86
... More
Item;Manglore tile Relaying Relaying Mangalore clay tile of 20 mm nominal thickness and of approved size and as per approved pattern on wooden frame work (reusing 50% of usable tiles including washing and curing ) along with sealing the tile joints. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
166.48
1028
171178.07
... More
Item;Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
166.48
176
29305.47
... More
Item;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
282.92
1709
483521.6
... More
Item;Removing white wash or colour wash by steel wire brushing and/or scraping; sand papering and preparing the wall/Ceiling surface smooth including necessary repairs to scratches complete. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
565.84
17
9675.86
... More
Item;Providing joists (karries) including hoisting, fixing in position and applying wood preservative as unexposed surface etc. complete with best teak wood including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
0.07
188083
13165.86
... More
Item;Wooden rafters Removal Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead: Of sectional area 40 square centimetres and above. including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge For Roof
0.07
3840
268.8
... More
Item;Providing ACCESS SCAFFOLD using Steel Scaffolding Pipe Frames made of 40 mmd ia MS Pipes and bracings with scaffold boards including hire charges for MS Pipe Frames scaffolds boards etc., and cost and conveyance of all other consumable accessories, taxes etc including concractor profit and overhead charges but excluding seignorage charges complete for finished item of work as directed by Engineer-in-charge for ELEVATION AREA for Scaffolding
850.66
231
196851.23
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%