Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
436089Bid Award Id
ViewTender No
HMDA/DEV/EE(Div-V)/01/01/2023-24 dt: 01.07.2023Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Development of Balajinagar Park at Mansoorabad, Hyderabad;RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) for Pedestals corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete but excluding the cost of steel and its fabrication charges complete for finished item of work as directed by Engineer-in-charge.
0.36
11376
4095.7
Development of Balajinagar Park at Mansoorabad, Hyderabad;RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) for Columns corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete but excluding the cost of steel and its fabrication charges complete for finished item of work as directed by Engineer-in-charge.
2.23
14610
32580.92
Development of Balajinagar Park at Mansoorabad, Hyderabad;RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) for Plinth Beam corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete but excluding the cost of steel and its fabrication charges complete for finished item of work as directed by Engineer-in-charge.
0.23
14477
3329.74
Development of Balajinagar Park at Mansoorabad, Hyderabad;RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) for Seating Columns corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete but excluding the cost of steel and its fabrication charges complete for finished item of work as directed by Engineer-in-charge.
0.25
14610
3652.57
Development of Balajinagar Park at Mansoorabad, Hyderabad;RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) for Seating Slab corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete but excluding the cost of steel and its fabrication charges complete for finished item of work as directed by Engineer-in-charge.
1.46
13390
19550.66
Development of Balajinagar Park at Mansoorabad, Hyderabad;RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) for Ring Beam corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete but excluding the cost of steel and its fabrication charges complete for finished item of work as directed by Engineer-in-charge.
0.23
15167
3488.54
Development of Balajinagar Park at Mansoorabad, Hyderabad;RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) for Slab corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete but excluding the cost of steel and its fabrication charges complete for finished item of work as directed by Engineer-in-charge.
6.46
13390
86504.96
Development of Balajinagar Park at Mansoorabad, Hyderabad;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials and overheads & contractors profit complete for finished item of work as directed by Engineer-in-charge. ( APSS No.126)
1.53
92968
142241.18
Development of Balajinagar Park at Mansoorabad, Hyderabad;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work as directed by Engineer-in-charge. (APSS NO. 309 & 310)
165.21
223
36889.74
Development of Balajinagar Park at Mansoorabad, Hyderabad;Brick masonry for panel walls with CM (1:8) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work as directed by Engineer-in-charge. (APSS No. 501 & 504).
33.2
8374
278038.71
Development of Balajinagar Park at Mansoorabad, Hyderabad;Ornamental plastering 12mm thick in two coats using screened sand with a base coat of 8mm thick in CM (1:6) and a top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, including sales & other taxes except GST on all materials, and all operational, incidental charges on materials and including the cost of all labor charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in- charge, etc., and overheads & contractors profit complete for finished item of work as directed by Engineer-in-charge. (SS 901,903 & 904)
150
594
89208
Development of Balajinagar Park at Mansoorabad, Hyderabad;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes except GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904).
343.58
559
192095.58
Development of Balajinagar Park at Mansoorabad, Hyderabad;Finishing with Ornamental artistic wooden appearance on gazebo with theme of tree trunk designs over slab, Columns, and also around base Flooring using Tata Oxide Colours with Birla White Cement complete for finished item of work as directed by Engineer-in-charge.
1
343000
343000
Development of Balajinagar Park at Mansoorabad, Hyderabad;Supplying and fabricating, erecting and fixing of Entrance Gate of approved design with structural steel of MS Hollow Sections., complete as per the sketch enclosed including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge
322.57
151
48795.16
Development of Balajinagar Park at Mansoorabad, Hyderabad;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, sales & other taxes except GST, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work as directed by Engineer-in-charge in all floors. (SS No. 1201, 1212 & 1207).
14.64
206
3027.84
Development of Balajinagar Park at Mansoorabad, Hyderabad;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes except GST, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work as directed by Engineer-in-charge in all floors.
968.58
308
298632.59
Development of Balajinagar Park at Mansoorabad, Hyderabad;Supply and Fixing of cobble stones 100x100x70 to 80 mm thickness of machine cut in all shapes, designs and colours set over CM 1: 8 bed of existing CC Bed or masonery bed already laid including labour charges for laying and fixing of Cobble stones including loading & unloading laying to desired lines and levels ,including Grouting and Pointing complete including overheads & contractors profit complete for finished item of work and as directed by the Engineer-in -charge.
150
4104
615711
Development of Balajinagar Park at Mansoorabad, Hyderabad;Supply and Fixing of precast concrete blocks for paving of M 35 grade and thickness not less than 60 mm for Medium traffic areas confirming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including labor charges for laying and fixing of precast concrete blocks including loading & unloading, laying to desired lines and levels complete excluding the cost of cement, sand, water, electricity, etc., including overheads & contractors profit complete for finished item of work as directed by Engineer-in-charge.
480
739
355032
Development of Balajinagar Park at Mansoorabad, Hyderabad;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH. complete for finished item of work as directed by Engineer-in-charge.
1813.97
3
5840.98
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements