Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
478209Bid Award Id
ViewTender No
1324/Shamshabad/UF/HMDA/2023Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance of Hedge/shrub planting: 1. Trimming of hedges once in 15 days2.Watering to hedges once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously)3.Formation of basins from 1 ft away to Hedge 4.Application of fertilizers, insecticides, fungicides etc With Drip
5500
1846
1218626.64
Item;Maintenance of lawns:Watering of the lawns @ 10-15 liters/sqmt / day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) II ) Lawn mowing and edging of the lawns in the following frequenty June to November - once in 15 days December to May - once in 30 days III) Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Application of fertilizers, insecticides, fungicides etc with Drip
2000
302
72576
Item;Maitenance for 12 Months
-
-
-
Item;Cost of Individual shurbs
1750
150
262500
Item;Cost of Ground cover plants
74680
25
1867000
Item;Cost of Topiary
100
2500
250000
Item;Cost of Palm plants
225
1200
270000
Item;Cost of Hedge plants
40440
30
1213200
Item;Cost of plant Material
-
-
-
Item;Transport of bag plants from nursery site to planting site upto a lead of 3 km including loading and unloading wherever departmental vehicles are not provided. Over and above 3km lead add Rs.3.02 per km per 100 plants.(total 30 km) a) 6"X12'' Bags = 338.83+3.02 X 37 =420.37
414880
420
1744031.06
Item;Ground Cover Bed preparation: Dressing the surface to the desired shape, laying 4? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (2.5? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass.
21170
203
4317833.2
Item;Individual Shrubs Planting:Topiary / Palms / Garden tree planting ? Digging of 0.60x0.60x0.60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))
1750
344
603522.5
Item;Individual Shrubs Planting:Topiary / Palms / Garden tree planting ? Digging of 0.75x0.75x0.75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))
335
746
250111
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyardmanure at 4:1 ratio, internal transportation ofplants and planting the plants including theapplication of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding thecost of the fertilizers (@ 20 gms/pit/sqmt) and plant material
5500
756
4160695
Item;Laying / Tarfing of shade grass
2000
58
116200
Item;Cost of Shade grass
2000
165
330000
Item;LAWN :Bed preparation : Dressing the surface to the desired shape, laying 4 ? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (2.5? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals & grass.
2000
222
445000
Item;Estimate for Development of Greenery under Shamshabad Flyover during the year 2023-24
-
-
-